X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354011901020

Well Details

Well ID: 0354011901020
Loading map...
Location: 02/01-19-035-01W4/0
Location Alias: 02/01-19-35-01 W4M
Location Alias 2: 02/01-19-035-01 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 01
Section: 19
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ 02 PROVOST 1-19-35-1
Operator Name: Karve Energy Inc.
License Number: 0485892
License Date: 2017-10-17
License Status: Issued
Spud Date: 2017-11-21
Final Drill Date: 2017-11-24
Well Total Depth: 2517.00 m
Surface Hole Latitude: 52.013654
Surface Hole Longitude: -110.153135

For data sources see[1][2]

Well History

Date Event
2017-10-17 Obtained License
2017-11-22 Surface Casing Operation Performed
2017-11-23 Direction Drilling Operation Performed - Deviate
2017-11-23 Direction Drilling Operation Performed - Horizontal
2017-11-24 Finished Drilling
2017-11-24 Well Log Performed
2017-11-24 Well Mode changed to Drilled and Cased
2017-11-25 Production Casing Operation Performed
2017-11-25 Rig Released
2017-12-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2017-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-14 Well Began Production
2017-12-14 Well Fluid changed to Crude Oil
2017-12-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-21 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-23 396.80 Deviate (5 - 79 degrees)
2017-11-23 835.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-10 Multi-Stage Fracture 2472.00 2472.10 0
2017-12-10 Multi-Stage Fracture 2250.50 2250.60 0
2017-12-10 Multi-Stage Fracture 2223.00 2223.10 0
2017-12-10 Multi-Stage Fracture 2195.70 2195.80 0
2017-12-10 Multi-Stage Fracture 2167.90 2168.00 0
2017-12-10 Multi-Stage Fracture 2140.10 2140.20 0
2017-12-10 Multi-Stage Fracture 2112.80 2112.90 0
2017-12-10 Multi-Stage Fracture 2085.60 2085.70 0
2017-12-10 Multi-Stage Fracture 2057.90 2058.00 0
2017-12-10 Multi-Stage Fracture 2030.10 2030.20 0
2017-12-10 Multi-Stage Fracture 1975.40 1975.50 0
2017-12-10 Multi-Stage Fracture 2444.20 2444.30 0
2017-12-10 Multi-Stage Fracture 1947.90 1948.00 0
2017-12-10 Multi-Stage Fracture 1920.10 1920.20 0
2017-12-10 Multi-Stage Fracture 1892.30 1892.40 0
2017-12-10 Multi-Stage Fracture 1864.60 1864.70 0
2017-12-10 Multi-Stage Fracture 1836.80 1836.90 0
2017-12-10 Multi-Stage Fracture 1809.10 1809.20 0
2017-12-10 Multi-Stage Fracture 1781.30 1781.40 0
2017-12-10 Multi-Stage Fracture 1753.50 1753.60 0
2017-12-10 Multi-Stage Fracture 1725.70 1725.80 0
2017-12-10 Multi-Stage Fracture 1698.00 1698.10 0
2017-12-10 Hydra Jet Perforation 2416.00 2416.10 0
2017-12-10 Multi-Stage Fracture 1670.30 1670.40 0
2017-12-10 Multi-Stage Fracture 1642.50 1642.60 0
2017-12-10 Multi-Stage Fracture 1614.80 1614.90 0
2017-12-10 Multi-Stage Fracture 1587.00 1587.10 0
2017-12-10 Multi-Stage Fracture 1559.20 1559.30 0
2017-12-10 Multi-Stage Fracture 1531.40 1531.50 0
2017-12-10 Multi-Stage Fracture 1503.90 1504.00 0
2017-12-10 Multi-Stage Fracture 1476.20 1476.30 0
2017-12-10 Multi-Stage Fracture 1448.50 1448.60 0
2017-12-10 Multi-Stage Fracture 1420.70 1420.80 0
2017-12-10 Multi-Stage Fracture 2416.00 2416.10 0
2017-12-10 Multi-Stage Fracture 1392.90 1393.00 0
2017-12-10 Multi-Stage Fracture 1365.20 1365.30 0
2017-12-10 Multi-Stage Fracture 2389.10 2389.20 0
2017-12-10 Multi-Stage Fracture 2361.30 2361.40 0
2017-12-10 Multi-Stage Fracture 2333.50 2333.60 0
2017-12-10 Multi-Stage Fracture 2305.70 2305.80 0
2017-12-10 Multi-Stage Fracture 2278.10 2278.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-10 2017-12-10 711 1,762 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 80.5203 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 15.1858 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.7043 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0084 N/A
Methyl Alcohol 67-56-1 100 0.0084 N/A
Non-Hazardous Ingredients Not Available 100 0.0084 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0712 N/A
Sodium chloride 7647-14-5 100 0.0712 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.0803 N/A
Water 7732-18-5 100 0.0803 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0269 N/A
Non-Hazardous Ingredients Not Available 100 0.0268 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0268 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3298 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3298 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0726 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0726 N/A
Methanol 67-56-1 100 0.0726 N/A
Monoethanolamine 141-43-5 100 0.0726 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0726 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0726 N/A
Water 7732-18-5 100 0.0726 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-10 2017-12-10 Groundwater - Non-saline greater than 150m deep 881
2017-12-10 2017-12-10 Groundwater - Saline 881

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 426 0.0 0.0 0.0
2018 8545 0.0 0.0 0.0
2019 8680 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-25 No Incident Encountered 0.00 0.00
2017-12-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References