X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345082811000

Well Details

Well ID: 0345082811000
Loading map...
Location: 00/11-28-034-08W5/0
Location Alias: 00/11-28-34-08 W5M
Location Alias 2: 00/11-28-034-08 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 08
Section: 28
County/Municipality: Clearwater County
Well Name: BEC RICINUS 11-28-34-8
Operator Name: Bonavista Energy Corporation
License Number: 0034975
License Date: 1968-10-11
License Status: Issued
Spud Date: 1968-10-28
Final Drill Date: 1968-12-05
Well Total Depth: 2804.20 m
Surface Hole Latitude: 51.950387
Surface Hole Longitude: -115.080421

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-10-11 Obtained License
1968-12-05 Finished Drilling
1968-12-05 Well Mode changed to Drilled and Cased
1968-12-07 Drill Stem Test Performed
1968-12-09 Drill Stem Test Performed
1968-12-18 Production Casing Operation Performed
1968-12-31 Perforation Treatment Performed - Jet Perforation
1969-01-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-01 Perforation Treatment Performed - Acid Wash - No Pressure
1969-01-04 Well Began Production
1969-01-04 Well Fluid changed to Crude Oil
1969-01-04 Well Mode changed to Flowing
1969-01-09 Perforation Treatment Performed - Fractured
1969-06-14 Perforation Treatment Performed - Jet Perforation
1969-06-16 Well Fluid changed to Crude Oil
1969-06-16 Well Mode changed to Flowing
1970-07-27 Perforation Treatment Performed - Cement Squeeze
1970-07-31 Perforation Treatment Performed - Jet Perforation
1970-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-18 Well Log Performed
1987-06-07 Well Log Performed
1987-06-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-31 Perforation 1801.40 1816.00 7
1969-01-01 Acid Wash 1801.40 1816.00 0
1969-01-01 Acid Treatment 1801.40 1816.00 0
1969-01-09 Fracture 1801.40 1816.00 0
1969-06-14 Perforation 2772.50 2774.30 13
1970-07-27 Cement Squeeze 1801.40 1816.00 0
1970-07-31 Perforation 1818.40 1820.30 3
1970-08-01 Acid Treatment 1818.40 1820.30 0
1970-08-13 Acid Treatment 1818.40 1820.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3345 0.0 0.0 0.0
1970 2288 0.0 0.0 0.0
1971 5562 0.0 0.0 0.0
1972 4802 0.0 0.0 0.0
1973 6313 0.0 0.0 0.0
1974 908 0.0 0.0 0.0
1975 799 0.0 0.0 0.0
1976 1116 0.0 0.0 0.0
1977 687 0.0 0.0 0.0
1978 565 0.0 0.0 0.0
1979 3187 0.0 0.0 0.0
1980 6972 0.0 0.0 0.0
1981 4586 0.0 0.0 0.0
1982 5703 0.0 0.0 0.0
1983 4252 0.0 0.0 0.0
1984 6965 0.0 0.0 0.0
1985 8256 0.0 0.0 0.0
1986 8464 0.0 0.0 0.0
1987 7450 0.0 0.0 0.0
1988 6727 0.0 0.0 0.0
1989 7986 0.0 0.0 0.0
1990 8409 0.0 0.0 0.0
1991 8699 0.0 0.0 0.0
1992 8437 0.0 0.0 0.0
1993 8543 0.0 0.0 0.0
1994 8604 0.0 0.0 0.0
1995 5825 0.0 0.0 0.0
1996 8641 0.0 0.0 0.0
1997 8601 0.0 0.0 0.0
1998 8663 0.0 0.0 0.0
1999 7528 0.0 0.0 0.0
2000 8703 0.0 0.0 0.0
2001 8683 0.0 0.0 0.0
2002 8652 0.0 0.0 0.0
2003 8694 0.0 0.0 0.0
2004 8344 0.0 0.0 0.0
2005 8481 0.0 0.0 0.0
2006 8612 0.0 0.0 0.0
2007 8751 0.0 0.0 0.0
2008 8512 0.0 0.0 0.0
2009 8382 0.0 0.0 0.0
2010 8476 0.0 0.0 0.0
2011 8738 0.0 0.0 0.0
2012 8570 0.0 0.0 0.0
2013 7781 0.0 0.0 0.0
2014 8257 0.0 0.0 0.0
2015 8271 0.0 0.0 0.0
2016 8736 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 8357 0.0 0.0 0.0
2020 1924 0.0 0.0 0.0

For data sources see[5]

References