X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345053310000

Well Details

Well ID: 0345053310000
Loading map...
Location: 00/10-33-034-05W5/0
Location Alias: 00/10-33-34-05 W5M
Location Alias 2: 00/10-33-034-05 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 05
Section: 33
County/Municipality: Clearwater County
Well Name: BEC CAROL 10-33-34-5
Operator Name: Bonavista Energy Corporation
License Number: 0026124
License Date: 1964-05-21
License Status: Abandoned
Spud Date: 1964-06-14
Final Drill Date: 1964-07-28
Well Total Depth: 2850.80 m
Surface Hole Latitude: 51.964143
Surface Hole Longitude: -114.647839

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-21 Obtained License
1964-07-11 Drill Stem Test Performed
1964-07-28 Finished Drilling
1964-07-29 Drill Stem Test Performed
1964-07-31 Production Casing Operation Performed
1964-08-11 Perforation Treatment Performed - Jet Perforation
1964-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-12 Perforation Treatment Performed - Acid Wash - No Pressure
1964-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-08-28 Well Mode changed to Drilled and Cased
1966-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-28 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-28 Perforation Treatment Performed - Jet Perforation
1966-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-07-01 Perforation Treatment Performed - Fractured
1968-08-28 Well Began Production
1968-08-28 Well Fluid changed to Gas
1968-08-28 Well Mode changed to Flowing
2007-12-20 Well Fluid changed to Gas
2007-12-20 Well Mode changed to Suspended
2012-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-29 Plug Back Performed
2012-02-29 Well Fluid changed to Gas
2012-02-29 Well Mode changed to Abandoned Zone
2012-03-01 Perforation Treatment Performed - Jet Perforation
2012-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-03 Perforation Treatment Performed - Remedial Casing
2012-03-04 Perforation Treatment Performed - Jet Perforation
2012-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-05 Perforation Treatment Performed - Remedial Casing
2012-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-07 Perforation Treatment Performed - Jet Perforation
2012-03-07 Perforation Treatment Performed - Remedial Casing
2012-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-08 Perforation Treatment Performed - Jet Perforation
2012-03-13 Perforation Treatment Performed - Jet Perforation
2012-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-15 Perforation Treatment Performed - Remedial Casing
2012-03-17 Well Abandoned
2012-03-17 Well Fluid changed to Gas
2012-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-08-11 Perforation 2702.40 2703.00 7
1964-08-22 Packing Device Capped w/Cement 2697.50 2697.50 0
1966-06-26 Packing Device Capped w/Cement 2685.30 2685.30 0
1966-06-28 Perforation 2480.50 2481.70 7
1966-06-28 Perforation 2482.60 2484.10 7
1966-06-28 Perforation 2485.90 2487.20 7
1966-06-28 Acid Wash 2480.50 2487.20 0
1966-06-28 Acid Treatment 2480.50 2487.20 0
1966-07-01 Acid Treatment 2480.50 2487.20 0
1966-07-01 Fracture 2480.50 2487.20 0
2012-02-29 Packing Device Capped w/Cement 2466.00 2474.00 0
1964-08-11 Perforation 2703.60 2705.40 13
2012-02-29 Packing Device Capped w/Cement 2259.00 2267.00 0
2012-03-01 Perforation 2193.00 2194.00 17
2012-03-03 Remedial Casing Cementing 2193.00 2194.00 0
2012-03-03 Packing Device Capped w/Cement 2183.00 2191.00 0
2012-03-04 Perforation 1800.00 1801.00 17
2012-03-05 Remedial Casing Cementing 1800.00 1801.00 0
2012-03-05 Packing Device Capped w/Cement 1789.00 1797.00 0
2012-03-07 Perforation 1526.00 1527.00 17
2012-03-07 Remedial Casing Cementing 1526.00 1527.00 0
2012-03-07 Packing Device Capped w/Cement 1516.00 1524.00 0
1964-08-11 Perforation 2710.30 2711.50 7
2012-03-08 Perforation 899.00 900.00 17
2012-03-08 Packing Device Capped w/Cement 882.00 890.00 0
2012-03-08 Perforation 600.00 601.00 17
2012-03-13 Perforation 600.00 601.00 17
2012-03-13 Perforation 582.00 583.00 17
2012-03-13 Perforation 471.00 472.00 17
2012-03-13 Perforation 354.00 355.00 17
2012-03-14 Packing Device Capped w/Cement 590.00 598.00 0
2012-03-14 Packing Device Capped w/Cement 566.00 574.00 0
2012-03-15 Remedial Casing Cementing 354.00 355.00 0
1964-08-11 Perforation 2712.40 2713.90 7
2012-03-15 Packing Device Capped w/Cement 342.00 352.00 0
1964-08-11 Perforation 2714.50 2717.60 13
1964-08-11 Perforation 2719.10 2720.60 13
1964-08-11 Perforation 2722.20 2723.10 7
1964-08-12 Acid Wash 2702.40 2723.10 0
1964-08-12 Acid Treatment 2702.40 2703.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1968 1137 0.0 0.0 0.0
1969 3739 0.0 0.0 0.0
1970 6658 0.0 0.0 0.0
1971 6955 0.0 0.0 0.0
1972 7825 0.0 0.0 0.0
1973 8260 0.0 0.0 0.0
1974 8550 0.0 0.0 0.0
1975 8424 0.0 0.0 0.0
1976 8014 0.0 0.0 0.0
1977 8263 0.0 0.0 0.0
1978 8597 0.0 0.0 0.0
1979 7605 0.0 0.0 0.0
1980 5133 0.0 0.0 0.0
1981 7396 0.0 0.0 0.0
1982 7042 0.0 0.0 0.0
1983 6334 0.0 0.0 0.0
1984 7816 0.0 0.0 0.0
1985 8343 0.0 0.0 0.0
1986 8721 0.0 0.0 0.0
1987 6085 0.0 0.0 0.0
1988 6997 0.0 0.0 0.0
1989 2915 0.0 0.0 0.0
1990 851 0.0 0.0 0.0
1991 1005 0.0 0.0 0.0
1992 1525 0.0 0.0 0.0
1993 685 0.0 0.0 0.0

For data sources see[5]

References