If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0345052906002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/06-29-034-05W5/2 | |
| Location Alias: 00/06-29-34-05 W5M | |
| Location Alias 2: 00/06-29-034-05 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 29 | |
| County/Municipality: Clearwater County | |
| Well Name: PWEI CAROL 6-29-34-5 | |
| Operator Name: TAQA North Ltd. | |
| License Number: 0017174 | |
| License Date: 1959-06-03 | |
| License Status: Suspension | |
| Spud Date: 1959-07-06 | |
| Final Drill Date: 1959-09-12 | |
| Well Total Depth: 2878.20 m | |
| Surface Hole Latitude: 51.945756 | |
| Surface Hole Longitude: -114.677721 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-06-03 | Obtained License |
| 1959-08-01 | Drill Stem Test Performed |
| 1959-08-21 | Drill Stem Test Performed |
| 1959-08-29 | Drill Stem Test Performed |
| 1959-08-30 | Drill Stem Test Performed |
| 1959-09-01 | Drill Stem Test Performed |
| 1959-09-02 | Drill Stem Test Performed |
| 1959-09-04 | Drill Stem Test Performed |
| 1959-09-06 | Drill Stem Test Performed |
| 1959-09-07 | Drill Stem Test Performed |
| 1959-09-08 | Drill Stem Test Performed |
| 1959-09-10 | Drill Stem Test Performed |
| 1959-09-12 | Finished Drilling |
| 1959-09-14 | Drill Stem Test Performed |
| 1959-09-17 | Production Casing Operation Performed |
| 1960-05-15 | Perforation Treatment Performed - Jet Perforation |
| 1960-10-03 | Perforation Treatment Performed - Cement Squeeze |
| 1960-10-09 | Perforation Treatment Performed - Jet Perforation |
| 1960-10-09 | Well Mode changed to Drilled and Cased |
| 1960-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-10-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-11-01 | Well Fluid changed to Gas |
| 1961-11-01 | Well Mode changed to Testing |
| 1961-11-02 | Perforation Treatment Performed - Cement Squeeze |
| 1961-11-02 | Well Fluid changed to Gas |
| 1961-11-02 | Well Mode changed to Abandoned Zone |
| 1961-11-13 | Perforation Treatment Performed - Jet Perforation |
| 1963-09-01 | Perforation Treatment Performed - Cement Plug |
| 1963-09-03 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1963-09-03 | Perforation Treatment Performed - Jet Perforation |
| 1963-09-04 | Perforation Treatment Performed - Fractured |
| 1970-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-10-28 | Perforation Treatment Performed - Cement Squeeze |
| 1970-10-30 | Perforation Treatment Performed - Jet Perforation |
| 2012-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-10-25 | Plug Back Performed |
| 2012-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-10-27 | Perforation Treatment Performed - Jet Perforation |
| 2012-10-27 | Plug Back Performed |
| 2012-10-30 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-05-15 | Perforation | 2522.80 | 2523.70 | 13 |
| 1963-09-03 | Acid Wash | 2522.80 | 2524.70 | 0 |
| 1963-09-04 | Fracture | 2522.80 | 2524.70 | 0 |
| 1970-10-28 | Acid Treatment | 2522.80 | 2524.70 | 0 |
| 1970-10-28 | Cement Squeeze | 2522.80 | 2524.70 | 0 |
| 1970-10-30 | Perforation | 2828.50 | 2831.60 | 13 |
| 2012-10-25 | Packing Device Capped w/Cement | 2801.00 | 2809.00 | 0 |
| 2012-10-27 | Packing Device Capped w/Cement | 2737.00 | 2745.00 | 0 |
| 2012-10-27 | Perforation | 2522.80 | 2524.70 | 13 |
| 2012-10-30 | Fracture | 2522.80 | 2524.70 | 0 |
| 1960-10-03 | Cement Squeeze | 2522.80 | 2523.70 | 0 |
| 1960-10-09 | Perforation | 2751.70 | 2757.80 | 13 |
| 1960-10-25 | Acid Treatment | 2751.70 | 2757.80 | 0 |
| 1960-10-26 | Acid Treatment | 2751.70 | 2757.80 | 0 |
| 1961-11-02 | Cement Squeeze | 2751.70 | 2757.80 | 0 |
| 1961-11-13 | Perforation | 2828.50 | 2831.60 | 13 |
| 1963-09-01 | Cement Plug | 2773.70 | 2809.60 | 0 |
| 1963-09-03 | Perforation | 2522.80 | 2524.70 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1961-11-02 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-27 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]