If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345050611000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.893235,"lon":-114.702237,"icon":""}]} |
Location: 00/11-06-034-05W5/0 | |
Location Alias: 00/11-06-34-05 W5M | |
Location Alias 2: 00/11-06-034-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 05 | |
Section: 06 | |
County/Municipality: Mountain View County | |
Well Name: OIL ET AL CAROLINE 11-6-34-5 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0082902 | |
License Date: 1980-05-21 | |
License Status: RecCertified | |
Spud Date: 1980-06-15 | |
Final Drill Date: 1980-07-25 | |
Well Total Depth: 2958.00 m | |
Surface Hole Latitude: 51.893235 | |
Surface Hole Longitude: -114.702237 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-21 | Obtained License |
1980-07-25 | Finished Drilling |
1980-07-26 | Well Log Performed |
1980-07-27 | Drill Stem Test Performed |
1980-08-01 | Production Casing Operation Performed |
1980-08-28 | Perforation Treatment Performed - Jet Perforation |
1980-08-29 | Perforation Treatment Performed - Cement Squeeze |
1980-09-01 | Perforation Treatment Performed - Jet Perforation |
1980-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-09-06 | Perforation Treatment Performed - Jet Perforation |
1980-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-09-10 | Perforation Treatment Performed - Jet Perforation |
1980-09-11 | Perforation Treatment Performed - Jet Perforation |
1980-09-12 | Perforation Treatment Performed - Cement Squeeze |
1980-09-18 | Perforation Treatment Performed - Jet Perforation |
1980-09-19 | Perforation Treatment Performed - Fractured |
1980-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-10-01 | Well Mode changed to Drilled and Cased |
1995-12-05 | Perforation Treatment Performed - Jet Perforation |
1995-12-05 | Perforation Treatment Performed - Remedial Casing |
1995-12-05 | Well Log Performed |
1995-12-05 | Well Mode changed to Abandoned |
1995-12-06 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-08-28 | Perforation | 2915.00 | 2916.00 | 7 |
1980-09-11 | Perforation | 2606.00 | 2607.00 | 7 |
1980-09-11 | Perforation | 2593.00 | 2599.00 | 7 |
1980-09-12 | Cement Squeeze | 2587.00 | 2619.00 | 0 |
1980-09-18 | Perforation | 2597.50 | 2599.00 | 13 |
1980-09-18 | Perforation | 2601.00 | 2602.50 | 13 |
1980-09-19 | Fracture | 2597.50 | 2602.50 | 0 |
1980-10-01 | Packing Device Capped w/Cement | 2580.00 | 2580.00 | 0 |
1995-12-05 | Perforation | 604.00 | 605.00 | 13 |
1995-12-05 | Remedial Casing Cementing | 604.00 | 605.00 | 0 |
1980-08-29 | Cement Squeeze | 2915.00 | 2916.00 | 0 |
1980-09-01 | Perforation | 2911.00 | 2913.00 | 13 |
1980-09-06 | Packing Device Capped w/Cement | 2900.00 | 2900.00 | 0 |
1980-09-06 | Perforation | 2797.00 | 2800.00 | 13 |
1980-09-07 | Acid Treatment | 2797.00 | 2800.00 | 0 |
1980-09-09 | Packing Device Capped w/Cement | 2781.00 | 2781.00 | 0 |
1980-09-10 | Perforation | 2587.00 | 2588.00 | 7 |
1980-09-10 | Perforation | 2618.00 | 2619.00 | 7 |
For data sources see[4]