X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345041501020

Well Details

Well ID: 0345041501020
Loading map...
Location: 02/01-15-034-04W5/0
Location Alias: 02/01-15-34-04 W5M
Location Alias 2: 02/01-15-034-04 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 04
Section: 15
County/Municipality: Mountain View County
Well Name: TIMBERROCK HZ 102 CAROL 1-15-34-4
Operator Name: TimberRock Energy Corp.
License Number: 0486329
License Date: 2017-11-16
License Status: Issued
Spud Date: 2017-11-22
Final Drill Date: 2017-12-04
Well Total Depth: 4075.00 m
Surface Hole Latitude: 51.929010
Surface Hole Longitude: -114.476960

For data sources see[1][2]

Well History

Date Event
2017-02-07 Well Log Performed
2017-11-16 Obtained License
2017-11-23 Surface Casing Operation Performed
2017-11-26 Direction Drilling Operation Performed - Deviate
2017-11-28 Direction Drilling Operation Performed - Horizontal
2017-11-28 Intermediate Casing Operation Performed
2017-11-28 Well Log Performed
2017-11-29 Intermediate Casing Operation Performed
2017-12-03 Kick Occurred
2017-12-04 Finished Drilling
2017-12-04 Well Log Performed
2017-12-04 Well Mode changed to Drilled and Cased
2017-12-06 Production Casing Operation Performed
2017-12-06 Rig Released
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-15 Well Fluid changed to Gas
2017-12-15 Well Mode changed to Testing
2017-12-17 Well Fluid changed to Gas
2017-12-17 Well Mode changed to Test Completed
2018-01-25 Well Began Production
2018-01-25 Well Fluid changed to Gas
2018-01-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-22 Horizon Drilling Inc. 47 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-26 2117.70 Deviate (5 - 79 degrees)
2017-11-28 2555.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-08 Multi-Stage Fracture 4025.80 4027.70 0
2017-12-08 Multi-Stage Fracture 3572.90 3574.80 0
2017-12-08 Multi-Stage Fracture 3514.80 3516.70 0
2017-12-08 Multi-Stage Fracture 3454.10 3456.00 0
2017-12-08 Multi-Stage Fracture 3393.50 3395.40 0
2017-12-08 Multi-Stage Fracture 3331.60 3333.50 0
2017-12-08 Multi-Stage Fracture 3284.00 3285.90 0
2017-12-08 Multi-Stage Fracture 3137.80 3139.70 0
2017-12-08 Multi-Stage Fracture 3076.00 3077.90 0
2017-12-08 Multi-Stage Fracture 3014.20 3016.10 0
2017-12-08 Multi-Stage Fracture 2954.80 2956.70 0
2017-12-08 Multi-Stage Fracture 3978.30 3980.20 0
2017-12-08 Multi-Stage Fracture 2892.90 2894.80 0
2017-12-08 Multi-Stage Fracture 2831.20 2833.10 0
2017-12-08 Multi-Stage Fracture 2783.40 2785.30 0
2017-12-08 Multi-Stage Fracture 3931.50 3933.40 0
2017-12-08 Multi-Stage Fracture 3884.00 3885.80 0
2017-12-08 Multi-Stage Fracture 3836.90 3838.80 0
2017-12-08 Multi-Stage Fracture 3789.30 3791.20 0
2017-12-08 Multi-Stage Fracture 3741.80 3743.70 0
2017-12-08 Multi-Stage Fracture 3694.30 3696.20 0
2017-12-08 Multi-Stage Fracture 3633.00 3634.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-08 2017-12-08 2,439 3,437 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.8831 N/A
20/40 SB Excel Calfrac Quartz 14808-60-7 100 5.3655 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 10.4223 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.5545 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.2746 N/A
Water 7732-18-5 100 0.2746 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0162 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0162 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0219 N/A
Water 7732-18-5 100 0.0219 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0867 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0001 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0001 N/A
Ethylene Glycol 107-21-1 100 0.0001 N/A
Formic acid 64-18-6 100 0.0001 N/A
Isopropyl alcohol 67-63-0 100 0.0001 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0001 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0001 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0774 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0774 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.3144 N/A
CalVisc CS-1 Calfrac Well Services Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1464 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-08 2017-12-09 Surface Water - Runoff 3663

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 36 0.0 0.0 0.0
2018 7630 0.0 0.0 0.0
2019 8378 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-03 Kick 3820.00 3820.00
2017-12-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References