If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345041307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.915749,"lon":-114.43372,"icon":""}]} |
Location: 00/07-13-034-04W5/0 | |
Location Alias: 00/07-13-34-04 W5M | |
Location Alias 2: 00/07-13-034-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 04 | |
Section: 13 | |
County/Municipality: Red Deer County | |
Well Name: BEC GARR 7-13-34-4 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0051516 | |
License Date: 1974-10-17 | |
License Status: Abandoned | |
Spud Date: 1974-11-03 | |
Final Drill Date: 1974-11-27 | |
Well Total Depth: 2557.90 m | |
Surface Hole Latitude: 51.915749 | |
Surface Hole Longitude: -114.433720 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-10-17 | Obtained License |
1974-11-27 | Finished Drilling |
1974-11-27 | Well Mode changed to Drilled and Cased |
1974-11-29 | Production Casing Operation Performed |
1975-01-03 | Perforation Treatment Performed - Jet Perforation |
1975-01-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-01-04 | Perforation Treatment Performed - Fractured |
1975-01-17 | Well Began Production |
1975-01-17 | Well Fluid changed to Crude Oil |
1975-01-17 | Well Mode changed to Flowing |
1987-11-17 | Perforation Treatment Performed - Cement Squeeze |
1987-11-17 | Plug Back Performed |
1987-11-17 | Well Fluid changed to Crude Oil |
1987-11-17 | Well Mode changed to Abandoned Zone |
1987-11-21 | Well Log Performed |
1987-11-23 | Perforation Treatment Performed - Jet Perforation |
1987-11-23 | Well Log Performed |
1987-11-26 | Perforation Treatment Performed - Fractured |
2012-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-12 | Plug Back Performed |
2012-01-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-13 | Perforation Treatment Performed - Jet Perforation |
2012-01-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-14 | Perforation Treatment Performed - Remedial Casing |
2012-01-15 | Perforation Treatment Performed - Jet Perforation |
2012-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-16 | Perforation Treatment Performed - Remedial Casing |
2012-01-17 | Perforation Treatment Performed - Jet Perforation |
2012-01-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-18 | Perforation Treatment Performed - Remedial Casing |
2012-01-19 | Perforation Treatment Performed - Jet Perforation |
2012-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-20 | Perforation Treatment Performed - Remedial Casing |
2012-03-02 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-01-03 | Perforation | 2443.30 | 2444.50 | 7 |
1987-11-23 | Perforation | 2514.00 | 2515.00 | 13 |
1987-11-23 | Perforation | 2517.50 | 2518.00 | 13 |
1987-11-23 | Perforation | 2521.00 | 2522.00 | 13 |
1987-11-26 | Fracture | 2486.50 | 2522.00 | 0 |
2012-01-12 | Packing Device Capped w/Cement | 2475.00 | 2483.00 | 0 |
2012-01-13 | Packing Device Capped w/Cement | 2432.00 | 2440.00 | 0 |
2012-01-13 | Perforation | 1740.00 | 1741.00 | 17 |
2012-01-14 | Remedial Casing Cementing | 1740.00 | 1741.00 | 0 |
2012-01-14 | Packing Device Capped w/Cement | 1730.00 | 1738.00 | 0 |
2012-01-15 | Perforation | 1597.00 | 1598.00 | 17 |
1975-01-03 | Perforation | 2446.00 | 2450.00 | 7 |
2012-01-16 | Remedial Casing Cementing | 1597.00 | 1598.00 | 0 |
2012-01-16 | Packing Device Capped w/Cement | 1587.00 | 1595.00 | 0 |
2012-01-17 | Perforation | 1299.00 | 1300.00 | 17 |
2012-01-18 | Remedial Casing Cementing | 1299.00 | 1300.00 | 0 |
2012-01-18 | Packing Device Capped w/Cement | 1289.00 | 1297.00 | 0 |
2012-01-19 | Perforation | 599.00 | 600.00 | 17 |
2012-01-20 | Remedial Casing Cementing | 599.00 | 600.00 | 0 |
2012-01-20 | Packing Device Capped w/Cement | 589.00 | 597.00 | 0 |
1975-01-03 | Perforation | 2451.20 | 2453.90 | 7 |
1975-01-04 | Acid Treatment | 2443.30 | 2453.90 | 0 |
1975-01-04 | Fracture | 2443.30 | 2453.90 | 0 |
1987-11-17 | Cement Squeeze | 2443.30 | 2453.90 | 0 |
1987-11-23 | Perforation | 2486.50 | 2489.00 | 13 |
1987-11-23 | Perforation | 2501.00 | 2502.00 | 13 |
1987-11-23 | Perforation | 2510.50 | 2512.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 5688 | 0.0 | 0.0 | 0.0 |
1976 | 3789 | 0.0 | 0.0 | 0.0 |
1977 | 5829 | 0.0 | 0.0 | 0.0 |
1978 | 8561 | 0.0 | 0.0 | 0.0 |
1979 | 8375 | 0.0 | 0.0 | 0.0 |
1980 | 8302 | 0.0 | 0.0 | 0.0 |
1981 | 8187 | 0.0 | 0.0 | 0.0 |
1982 | 4479 | 0.0 | 0.0 | 0.0 |
1983 | 7045 | 0.0 | 0.0 | 0.0 |
1984 | 8041 | 0.0 | 0.0 | 0.0 |
1985 | 7755 | 0.0 | 0.0 | 0.0 |
1986 | 7794 | 0.0 | 0.0 | 0.0 |
1987 | 163 | 0.0 | 0.0 | 0.0 |
For data sources see[5]