If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345030802000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.900525,"lon":-114.38605,"icon":""}]} |
Location: 00/02-08-034-03W5/0 | |
Location Alias: 00/02-08-34-03 W5M | |
Location Alias 2: 00/02-08-034-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 03 | |
Section: 08 | |
County/Municipality: Mountain View County | |
Well Name: CPEC GARR 2-8-34-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0053981 | |
License Date: 1975-06-23 | |
License Status: Suspension | |
Spud Date: 1975-08-09 | |
Final Drill Date: 1975-09-07 | |
Well Total Depth: 2417.10 m | |
Surface Hole Latitude: 51.900525 | |
Surface Hole Longitude: -114.386050 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-06-23 | Obtained License |
1975-09-07 | Finished Drilling |
1975-09-07 | Well Mode changed to Drilled and Cased |
1975-09-08 | Production Casing Operation Performed |
1975-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-09-24 | Perforation Treatment Performed - Jet Perforation |
1975-09-25 | Perforation Treatment Performed - Fractured |
1975-10-08 | Well Began Production |
1975-10-08 | Well Fluid changed to Crude Oil |
1975-10-08 | Well Mode changed to Flowing |
1984-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-11-16 | Plug Back Performed |
1984-11-16 | Well Log Performed |
1984-11-19 | Perforation Treatment Performed - Jet Perforation |
1984-11-19 | Well Fluid changed to Crude Oil |
1984-11-19 | Well Log Performed |
1984-11-19 | Well Mode changed to Abandoned Zone |
1984-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-08-12 | Well Log Performed |
2004-09-12 | Well Log Performed |
2004-11-29 | Perforation Treatment Performed - Chemical Squeeze |
2004-12-09 | Perforation Treatment Performed - Jet Perforation |
2004-12-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-12-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-12-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-01-29 | Well Log Performed |
2006-03-24 | Well Log Performed |
2006-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-26 | Plug Back Performed |
2006-03-28 | Well Log Performed |
2006-07-09 | Well Log Performed |
2006-07-11 | Perforation Treatment Performed - Jet Perforation |
2006-07-11 | Well Log Performed |
2006-07-12 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-09-24 | Perforation | 2383.50 | 2384.80 | 7 |
2004-11-29 | Chemical Squeeze | 2200.00 | 2203.00 | 0 |
2004-12-09 | Perforation | 2389.10 | 2393.70 | 17 |
2004-12-14 | Acid Treatment | 2200.00 | 2203.00 | 0 |
2004-12-15 | Acid Treatment | 2200.00 | 2203.00 | 0 |
2004-12-19 | Acid Treatment | 2200.00 | 2203.00 | 0 |
2004-12-28 | Acid Treatment | 2200.00 | 2203.00 | 0 |
2006-03-26 | Packing Device Capped w/Cement | 1920.40 | 2380.00 | 0 |
2006-07-11 | Perforation | 1925.00 | 1927.50 | 20 |
2006-07-12 | Fracture | 1925.00 | 1927.50 | 0 |
1975-09-24 | Perforation | 2386.00 | 2387.50 | 7 |
1975-09-24 | Perforation | 2388.70 | 2389.90 | 7 |
1975-09-24 | Perforation | 2390.90 | 2393.30 | 7 |
1975-09-24 | Acid Treatment | 2383.50 | 2393.30 | 0 |
1975-09-25 | Fracture | 2383.50 | 2393.30 | 0 |
1984-11-16 | Packing Device Capped w/Cement | 2370.00 | 2378.00 | 0 |
1984-11-19 | Perforation | 2200.00 | 2203.00 | 13 |
1984-11-20 | Acid Treatment | 2200.00 | 2203.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 1304 | 0.0 | 0.0 | 0.0 |
1976 | 6073 | 0.0 | 0.0 | 0.0 |
1977 | 8346 | 0.0 | 0.0 | 0.0 |
1978 | 8653 | 0.0 | 0.0 | 0.0 |
1979 | 8654 | 0.0 | 0.0 | 0.0 |
1980 | 8568 | 0.0 | 0.0 | 0.0 |
1981 | 8716 | 0.0 | 0.0 | 0.0 |
1982 | 8673 | 0.0 | 0.0 | 0.0 |
1983 | 8678 | 0.0 | 0.0 | 0.0 |
1984 | 7032 | 0.0 | 0.0 | 0.0 |
For data sources see[5]