If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345030402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.898951,"lon":-114.362765,"icon":""}]} |
Location: 00/02-04-034-03W5/0 | |
Location Alias: 00/02-04-34-03 W5M | |
Location Alias 2: 00/02-04-034-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 03 | |
Section: 04 | |
County/Municipality: Mountain View County | |
Well Name: CLEARVIEW GARR 2-4-34-3 | |
Operator Name: Clearview Resources Ltd. | |
License Number: 0434318 | |
License Date: 2011-06-14 | |
License Status: Amended | |
Spud Date: 2012-02-04 | |
Final Drill Date: 2012-02-17 | |
Well Total Depth: 3516.00 m | |
Surface Hole Latitude: 51.898951 | |
Surface Hole Longitude: -114.362765 |
Date | Event |
---|---|
2011-06-14 | Obtained License |
2012-02-06 | Surface Casing Operation Performed |
2012-02-10 | Direction Drilling Operation Performed - Horizontal |
2012-02-13 | Intermediate Casing Operation Performed |
2012-02-13 | Well Log Performed |
2012-02-17 | Finished Drilling |
2012-02-17 | Well Mode changed to Drilled and Cased |
2012-02-20 | Liner Casing Operation Performed |
2012-02-21 | Rig Released |
2012-02-26 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-03 | Well Began Production |
2012-03-03 | Well Fluid changed to Crude Oil |
2012-03-03 | Well Mode changed to Pumping |
2020-03-31 | Well Fluid changed to Crude Oil |
2020-03-31 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-04 | Ensign Drilling Inc. | 64 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-10 | 2105.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-26 | Open Hole/Barefoot Completion | 3511.00 | 3516.00 | 0 |
2012-03-03 | Multi-Stage Fracture | 2917.80 | 2917.90 | 0 |
2012-03-03 | Multi-Stage Fracture | 2858.00 | 2858.10 | 0 |
2012-03-03 | Multi-Stage Fracture | 2783.50 | 2783.60 | 0 |
2012-03-03 | Multi-Stage Fracture | 2707.90 | 2708.00 | 0 |
2012-03-03 | Multi-Stage Fracture | 2633.50 | 2633.60 | 0 |
2012-03-03 | Multi-Stage Fracture | 2559.20 | 2559.30 | 0 |
2012-03-03 | Multi-Stage Fracture | 2488.60 | 2488.70 | 0 |
2012-03-03 | Multi-Stage Fracture | 2415.10 | 2415.20 | 0 |
2012-03-03 | Multi-Stage Fracture | 2341.40 | 2341.50 | 0 |
2012-03-03 | Multi-Stage Fracture | 2268.30 | 2268.40 | 0 |
2012-03-02 | Multi-Stage Fracture | 3488.90 | 3489.00 | 0 |
2012-03-03 | Multi-Stage Fracture | 2209.00 | 2209.10 | 0 |
2012-03-03 | Multi-Stage Fracture | 2176.70 | 2176.80 | 0 |
2012-03-02 | Multi-Stage Fracture | 3423.20 | 3423.30 | 0 |
2012-03-02 | Multi-Stage Fracture | 3365.80 | 3365.90 | 0 |
2012-03-02 | Multi-Stage Fracture | 3291.00 | 3291.10 | 0 |
2012-03-03 | Multi-Stage Fracture | 3216.30 | 3216.40 | 0 |
2012-03-03 | Multi-Stage Fracture | 3141.40 | 3141.50 | 0 |
2012-03-03 | Multi-Stage Fracture | 3067.40 | 3067.50 | 0 |
2012-03-03 | Multi-Stage Fracture | 2993.10 | 2993.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6806 | 0.0 | 0.0 | 0.0 |
2013 | 8336 | 0.0 | 0.0 | 0.0 |
2014 | 8080 | 0.0 | 0.0 | 0.0 |
2015 | 7171 | 0.0 | 0.0 | 0.0 |
2016 | 6255 | 0.0 | 0.0 | 0.0 |
2017 | 4937 | 0.0 | 0.0 | 0.0 |
2018 | 5394 | 0.0 | 0.0 | 0.0 |
2019 | 3443 | 0.0 | 0.0 | 0.0 |
2020 | 191 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]