If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0345030401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.898959,"lon":-114.363201,"icon":""}]} |
Location: 00/01-04-034-03W5/0 | |
Location Alias: 00/01-04-34-03 W5M | |
Location Alias 2: 00/01-04-034-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 5 | |
Range: 03 | |
Section: 04 | |
County/Municipality: Mountain View County | |
Well Name: CLEARVIEW GARR 1-4-34-3 | |
Operator Name: Clearview Resources Ltd. | |
License Number: 0434317 | |
License Date: 2011-06-14 | |
License Status: Amended | |
Spud Date: 2012-06-12 | |
Final Drill Date: 2012-06-30 | |
Well Total Depth: 3501.00 m | |
Surface Hole Latitude: 51.898959 | |
Surface Hole Longitude: -114.363201 |
Date | Event |
---|---|
2011-06-14 | Obtained License |
2012-06-15 | Surface Casing Operation Performed |
2012-06-16 | Well Log Performed |
2012-06-18 | Direction Drilling Operation Performed - Deviate |
2012-06-20 | Direction Drilling Operation Performed - Horizontal |
2012-06-23 | Intermediate Casing Operation Performed |
2012-06-23 | Well Log Performed |
2012-06-30 | Finished Drilling |
2012-06-30 | Well Mode changed to Drilled and Cased |
2012-07-04 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-05 | Liner Casing Operation Performed |
2012-07-06 | Rig Released |
2012-07-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-15 | Well Began Production |
2012-07-15 | Well Fluid changed to Crude Oil |
2012-07-15 | Well Mode changed to Pumping |
2020-03-31 | Well Fluid changed to Crude Oil |
2020-03-31 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-12 | Excalibur Drilling Ltd. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-18 | 1526.00 | Deviate (5 - 79 degrees) |
2012-06-20 | 2065.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-04 | Open Hole/Barefoot Completion | 3496.00 | 3501.00 | 0 |
2012-07-15 | Multi-Stage Fracture | 2890.10 | 2890.20 | 0 |
2012-07-15 | Multi-Stage Fracture | 2813.90 | 2814.00 | 0 |
2012-07-15 | Multi-Stage Fracture | 2737.70 | 2737.80 | 0 |
2012-07-15 | Multi-Stage Fracture | 2675.50 | 2675.60 | 0 |
2012-07-15 | Multi-Stage Fracture | 2599.20 | 2599.30 | 0 |
2012-07-15 | Multi-Stage Fracture | 2524.50 | 2524.60 | 0 |
2012-07-15 | Multi-Stage Fracture | 2434.70 | 2434.80 | 0 |
2012-07-15 | Multi-Stage Fracture | 2344.40 | 2344.50 | 0 |
2012-07-15 | Multi-Stage Fracture | 2254.80 | 2254.90 | 0 |
2012-07-15 | Multi-Stage Fracture | 2179.50 | 2179.60 | 0 |
2012-07-15 | Multi-Stage Fracture | 3461.80 | 3461.90 | 0 |
2012-07-15 | Multi-Stage Fracture | 3408.20 | 3408.30 | 0 |
2012-07-15 | Multi-Stage Fracture | 3320.40 | 3320.50 | 0 |
2012-07-15 | Multi-Stage Fracture | 3247.80 | 3247.90 | 0 |
2012-07-15 | Multi-Stage Fracture | 3186.80 | 3186.90 | 0 |
2012-07-15 | Multi-Stage Fracture | 3113.40 | 3113.50 | 0 |
2012-07-15 | Multi-Stage Fracture | 3025.60 | 3025.70 | 0 |
2012-07-15 | Multi-Stage Fracture | 2966.20 | 2966.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3736 | 0.0 | 0.0 | 0.0 |
2013 | 8575 | 0.0 | 0.0 | 0.0 |
2014 | 8023 | 0.0 | 0.0 | 0.0 |
2015 | 8103 | 0.0 | 0.0 | 0.0 |
2016 | 6592 | 0.0 | 0.0 | 0.0 |
2017 | 8616 | 0.0 | 0.0 | 0.0 |
2018 | 8543 | 0.0 | 0.0 | 0.0 |
2019 | 8068 | 0.0 | 0.0 | 0.0 |
2020 | 1801 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-06 | No Incident Encountered | 0.00 | 0.00 |
2012-07-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]