If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0345013313000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/13-33-034-01W5/0 | |
| Location Alias: 00/13-33-34-01 W5M | |
| Location Alias 2: 00/13-33-034-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 33 | |
| County/Municipality: Red Deer County | |
| Well Name: GNEL INNIS 13-33-34-1 | |
| Operator Name: Obsidian Energy Ltd. | |
| License Number: 0015642 | |
| License Date: 1958-07-28 | |
| License Status: RecCertified | |
| Spud Date: 1958-08-03 | |
| Final Drill Date: 1958-09-06 | |
| Well Total Depth: 2664.00 m | |
| Surface Hole Latitude: 51.967876 | |
| Surface Hole Longitude: -114.093305 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1958-07-28 | Obtained License |
| 1958-08-13 | Lost Circulation Occurred |
| 1958-09-06 | Finished Drilling |
| 1958-09-06 | Well Mode changed to Drilled and Cased |
| 1958-09-07 | Production Casing Operation Performed |
| 1958-09-09 | Perforation Treatment Performed - Jet Perforation |
| 1958-09-12 | Perforation Treatment Performed - Cement Squeeze |
| 1958-09-12 | Perforation Treatment Performed - Jet Perforation |
| 1958-09-29 | Well Began Production |
| 1958-09-29 | Well Fluid changed to Crude Oil |
| 1958-09-29 | Well Mode changed to Flowing |
| 1958-10-28 | Perforation Treatment Performed - Cement Squeeze |
| 1958-10-28 | Perforation Treatment Performed - Jet Perforation |
| 1958-10-30 | Perforation Treatment Performed - Jet Perforation |
| 1986-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1986-01-17 | Well Fluid changed to Crude Oil |
| 1986-01-17 | Well Log Performed |
| 1986-01-17 | Well Mode changed to Abandoned Zone |
| 2006-12-15 | Well Log Performed |
| 2006-12-17 | Well Log Performed |
| 2007-01-12 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-01-15 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-15 | Well Log Performed |
| 2007-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-01-17 | Perforation Treatment Performed - Remedial Casing |
| 2007-01-18 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-01-19 | Perforation Treatment Performed - Remedial Casing |
| 2007-01-22 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-01-23 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-23 | Perforation Treatment Performed - Remedial Casing |
| 2007-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-01-24 | Perforation Treatment Performed - Remedial Casing |
| 2007-11-13 | Well Abandoned |
| 2007-11-13 | Well Fluid changed to Crude Oil |
| 2007-11-13 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1958-09-09 | Perforation | 2636.50 | 2639.60 | 13 |
| 2007-01-15 | Packing Device Capped w/Cement | 1887.00 | 1895.00 | 0 |
| 2007-01-15 | Perforation | 1279.00 | 1280.00 | 13 |
| 2007-01-17 | Remedial Casing Cementing | 1279.00 | 1280.00 | 0 |
| 2007-01-17 | Packing Device Capped w/Cement | 1061.00 | 1275.00 | 0 |
| 2007-01-18 | Perforation | 1040.00 | 1041.00 | 13 |
| 2007-01-19 | Remedial Casing Cementing | 1040.00 | 1041.00 | 0 |
| 2007-01-19 | Packing Device Capped w/Cement | 867.80 | 1035.00 | 0 |
| 2007-01-22 | Perforation | 813.00 | 814.00 | 13 |
| 2007-01-23 | Remedial Casing Cementing | 813.00 | 814.00 | 0 |
| 2007-01-23 | Packing Device Capped w/Cement | 802.00 | 810.00 | 0 |
| 1958-09-12 | Cement Squeeze | 2636.50 | 2639.60 | 0 |
| 2007-01-23 | Perforation | 439.00 | 440.00 | 13 |
| 2007-01-24 | Remedial Casing Cementing | 439.00 | 440.00 | 0 |
| 2007-01-24 | Packing Device Capped w/Cement | 427.00 | 435.00 | 0 |
| 1958-09-12 | Perforation | 2636.50 | 2639.60 | 13 |
| 1958-10-28 | Perforation | 2649.30 | 2649.90 | 26 |
| 1958-10-28 | Cement Squeeze | 2636.50 | 2639.60 | 0 |
| 1958-10-30 | Perforation | 2636.50 | 2639.60 | 13 |
| 1986-01-15 | Acid Treatment | 2636.50 | 2639.60 | 0 |
| 1986-01-17 | Packing Device Capped w/Cement | 2613.00 | 2623.00 | 0 |
| 2007-01-12 | Perforation | 1898.00 | 1899.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1958-08-13 | Lost Circulation | 1960.40 | 1960.40 |
For data sources see[6]