X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345013301000

Well Details

Well ID: 0345013301000
Loading map...
Location: 00/01-33-034-01W5/0
Location Alias: 00/01-33-34-01 W5M
Location Alias 2: 00/01-33-034-01 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 01
Section: 33
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 1-33-34-1
Operator Name: Enhance Energy Inc.
License Number: 0016558
License Date: 1959-01-09
License Status: Suspension
Spud Date: 1959-01-27
Final Drill Date: 1959-03-08
Well Total Depth: 2661.80 m
Surface Hole Latitude: 51.957355
Surface Hole Longitude: -114.076232

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-01-09 Obtained License
1959-03-05 Production Casing Operation Performed
1959-03-08 Finished Drilling
1959-03-08 Perforation Treatment Performed - Open-Hole Completion
1959-03-08 Well Mode changed to Drilled and Cased
1959-03-13 Well Began Production
1959-03-13 Well Fluid changed to Crude Oil
1959-03-13 Well Mode changed to Flowing
1988-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-22 Plug Back Performed
1988-11-22 Well Fluid changed to Crude Oil
1988-11-22 Well Mode changed to Abandoned Zone
2008-01-20 Well Log Performed
2008-01-23 Perforation Treatment Performed - Open-Hole Completion
2008-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-01 Perforation Treatment Performed - Jet Perforation
2008-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-02 Perforation Treatment Performed - Remedial Casing
2008-02-03 Perforation Treatment Performed - Jet Perforation
2008-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-04 Perforation Treatment Performed - Remedial Casing
2008-02-05 Perforation Treatment Performed - Jet Perforation
2008-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-06 Perforation Treatment Performed - Remedial Casing
2008-02-07 Perforation Treatment Performed - Jet Perforation
2008-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-10 Perforation Treatment Performed - Remedial Casing
2008-02-11 Perforation Treatment Performed - Jet Perforation
2008-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-13 Perforation Treatment Performed - Remedial Casing
2008-02-14 Perforation Treatment Performed - Cement Plug
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-20 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-08 Open Hole/Barefoot Completion 2657.90 2661.80 0
2008-02-04 Packing Device Capped w/Cement 2042.00 2122.00 0
2008-02-05 Perforation 1906.00 1907.00 20
2008-02-06 Remedial Casing Cementing 1906.00 1907.00 0
2008-02-06 Packing Device Capped w/Cement 1874.00 1898.00 0
2008-02-07 Perforation 1293.00 1294.00 20
2008-02-10 Remedial Casing Cementing 1293.00 1294.00 0
2008-02-10 Packing Device Capped w/Cement 1090.00 1296.00 0
2008-02-11 Perforation 1084.00 1085.00 20
2008-02-13 Remedial Casing Cementing 1084.00 1085.00 0
2008-02-13 Packing Device Capped w/Cement 648.20 1080.00 0
1988-11-22 Packing Device Capped w/Cement 2609.00 2620.00 0
2008-02-14 Cement Plug 555.00 648.20 0
2008-02-19 Perforation 548.00 549.00 20
2008-02-20 Remedial Casing Cementing 548.00 549.00 0
2008-02-20 Packing Device Capped w/Cement 344.00 544.00 0
2008-01-23 Open Hole/Barefoot Completion 2657.90 2661.80 0
2008-02-01 Packing Device Capped w/Cement 2632.00 2641.00 0
2008-02-01 Perforation 2178.00 2179.00 20
2008-02-02 Remedial Casing Cementing 2178.00 2179.00 0
2008-02-02 Packing Device Capped w/Cement 2161.50 2171.50 0
2008-02-03 Perforation 2129.00 2130.00 20
2008-02-04 Remedial Casing Cementing 2129.00 2130.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1986 2193 0.0 0.0 0.0

For data sources see[5]

References