If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344271501002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.914395,"lon":-113.740569,"icon":""}]} |
Location: 00/01-15-034-27W4/2 | |
Location Alias: 00/01-15-34-27 W4M | |
Location Alias 2: 00/01-15-034-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 27 | |
Section: 15 | |
County/Municipality: Red Deer County | |
Well Name: EMBER DAVEY 1-15-34-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0335016 | |
License Date: 2005-07-21 | |
License Status: Issued | |
Spud Date: 2005-08-02 | |
Final Drill Date: 2005-08-05 | |
Well Total Depth: 1130.00 m | |
Surface Hole Latitude: 51.914395 | |
Surface Hole Longitude: -113.740569 |
Date | Event |
---|---|
2005-07-21 | Obtained License |
2005-08-03 | Surface Casing Operation Performed |
2005-08-05 | Finished Drilling |
2005-08-05 | Well Mode changed to Drilled and Cased |
2005-08-06 | Production Casing Operation Performed |
2005-08-06 | Rig Released |
2005-08-06 | Well Log Performed |
2005-08-14 | Perforation Treatment Performed - Jet Perforation |
2005-08-14 | Well Log Performed |
2005-08-22 | Perforation Treatment Performed - Fractured |
2005-09-30 | Well Began Production |
2005-09-30 | Well Fluid changed to Gas |
2005-09-30 | Well Mode changed to Flowing |
2006-03-25 | Perforation Treatment Performed - Jet Perforation |
2006-03-25 | Well Log Performed |
2006-05-05 | Well Log Performed |
2006-05-10 | Well Structure changed to Commingled |
2006-07-14 | Perforation Treatment Performed - Fractured |
2006-07-22 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-14 | Perforation | 877.00 | 878.00 | 17 |
2005-08-22 | Fracture | 488.00 | 522.00 | 0 |
2006-03-25 | Perforation | 363.50 | 364.00 | 17 |
2006-03-25 | Perforation | 371.00 | 371.50 | 17 |
2006-03-25 | Perforation | 374.80 | 377.30 | 17 |
2006-03-25 | Perforation | 383.90 | 384.40 | 17 |
2006-03-25 | Perforation | 471.10 | 471.60 | 17 |
2006-03-25 | Perforation | 495.50 | 496.30 | 17 |
2006-03-25 | Perforation | 497.90 | 498.40 | 17 |
2006-03-25 | Perforation | 598.10 | 598.70 | 17 |
2006-03-25 | Perforation | 619.00 | 619.50 | 17 |
2005-08-14 | Perforation | 919.00 | 923.00 | 17 |
2006-03-25 | Perforation | 627.40 | 627.90 | 17 |
2006-03-25 | Perforation | 662.90 | 663.70 | 17 |
2006-03-25 | Perforation | 672.30 | 672.80 | 17 |
2006-03-25 | Perforation | 685.00 | 685.50 | 17 |
2006-03-25 | Perforation | 687.00 | 689.80 | 17 |
2006-03-25 | Perforation | 693.00 | 694.00 | 17 |
2006-03-25 | Perforation | 701.60 | 702.10 | 17 |
2006-03-25 | Perforation | 704.20 | 704.80 | 17 |
2006-03-25 | Perforation | 728.20 | 729.20 | 17 |
2006-03-25 | Perforation | 732.00 | 734.80 | 17 |
2005-08-14 | Perforation | 948.00 | 951.00 | 17 |
2006-03-25 | Perforation | 738.90 | 739.40 | 17 |
2006-07-14 | Fracture | 363.50 | 471.60 | 0 |
2006-07-14 | Fracture | 495.50 | 498.40 | 0 |
2006-07-14 | Fracture | 598.10 | 739.40 | 0 |
2005-08-14 | Perforation | 978.00 | 980.50 | 17 |
2005-08-14 | Perforation | 1025.00 | 1030.00 | 17 |
2005-08-14 | Perforation | 1043.00 | 1045.00 | 17 |
2005-08-14 | Perforation | 488.00 | 489.50 | 17 |
2005-08-14 | Perforation | 520.00 | 522.00 | 17 |
2005-08-22 | Fracture | 877.00 | 1045.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2219 | 0.0 | 0.0 | 0.0 |
2006 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]