If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344252909003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.949505,"lon":-113.505156,"icon":""}]} |
Location: 00/09-29-034-25W4/3 | |
Location Alias: 00/09-29-34-25 W4M | |
Location Alias 2: 00/09-29-034-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Kneehill County | |
Well Name: PINE CLIFF THREEHCK 9-29-34-25 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0193477 | |
License Date: 1996-11-13 | |
License Status: Issued | |
Spud Date: 1996-11-25 | |
Final Drill Date: 1996-12-04 | |
Well Total Depth: 1818.00 m | |
Surface Hole Latitude: 51.949505 | |
Surface Hole Longitude: -113.505156 |
Date | Event |
---|---|
1996-11-13 | Obtained License |
1996-11-26 | Surface Casing Operation Performed |
1996-11-28 | Direction Drilling Operation Performed - Deviate |
1996-12-04 | Finished Drilling |
1996-12-04 | Well Log Performed |
1996-12-04 | Well Mode changed to Drilled and Cased |
1996-12-05 | Production Casing Operation Performed |
1996-12-05 | Well Log Performed |
1996-12-06 | Rig Released |
1996-12-10 | Well Log Performed |
1997-05-10 | Perforation Treatment Performed - Jet Perforation |
1997-05-10 | Well Log Performed |
1997-05-11 | Perforation Treatment Performed - Fractured |
1997-05-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-05-24 | Perforation Treatment Performed - Jet Perforation |
1997-05-24 | Plug Back Performed |
1997-05-25 | Well Log Performed |
1997-05-31 | Perforation Treatment Performed - Fractured |
1998-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-08-12 | Plug Back Performed |
1998-08-12 | Well Log Performed |
1998-08-13 | Well Log Performed |
1998-08-14 | Perforation Treatment Performed - Jet Perforation |
1998-08-14 | Well Log Performed |
2002-07-10 | Perforation Treatment Performed - Cement Squeeze |
2002-07-10 | Plug Back Performed |
2002-07-13 | Perforation Treatment Performed - Cement Squeeze |
2002-07-13 | Perforation Treatment Performed - Jet Perforation |
2002-07-13 | Plug Back Performed |
2002-07-13 | Well Mode changed to Abandoned Zone |
2002-07-15 | Perforation Treatment Performed - Jet Perforation |
2002-07-15 | Well Log Performed |
2002-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-17 | Perforation Treatment Performed - Jet Perforation |
2002-07-17 | Plug Back Performed |
2002-07-17 | Well Log Performed |
2002-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-11-28 | 1115.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-05-10 | Perforation | 1757.00 | 1759.50 | 17 |
2002-07-10 | Cement Squeeze | 790.00 | 796.00 | 0 |
2002-07-10 | Cement Squeeze | 766.00 | 768.00 | 0 |
2002-07-10 | Cement Squeeze | 761.00 | 764.00 | 0 |
2002-07-13 | Perforation | 946.50 | 955.00 | 17 |
2002-07-13 | Cement Squeeze | 946.50 | 955.00 | 0 |
2002-07-15 | Perforation | 1511.20 | 1512.50 | 17 |
2002-07-17 | Packing Device Capped w/Cement | 940.00 | 948.00 | 0 |
2002-07-17 | Perforation | 790.00 | 796.00 | 17 |
2002-07-17 | Perforation | 766.00 | 768.00 | 17 |
2002-07-17 | Perforation | 761.00 | 764.00 | 17 |
1997-05-11 | Fracture | 1757.00 | 1759.50 | 0 |
2002-07-17 | Packing Device Capped w/Cement | 1505.00 | 1513.00 | 0 |
2002-07-18 | Acid Treatment | 761.00 | 796.00 | 0 |
1997-05-24 | Packing Device Capped w/Cement | 1740.00 | 1748.00 | 0 |
1997-05-24 | Perforation | 946.50 | 955.00 | 17 |
1997-05-31 | Fracture | 946.50 | 955.00 | 0 |
1998-08-12 | Packing Device Capped w/Cement | 924.40 | 932.40 | 0 |
1998-08-14 | Perforation | 790.00 | 796.00 | 17 |
1998-08-14 | Perforation | 766.00 | 768.00 | 17 |
1998-08-14 | Perforation | 761.00 | 764.00 | 17 |
For data sources see[5]