If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344240906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.902523,"lon":-113.351448,"icon":""}]} |
Location: 00/06-09-034-24W4/0 | |
Location Alias: 00/06-09-34-24 W4M | |
Location Alias 2: 00/06-09-034-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 24 | |
Section: 09 | |
County/Municipality: Kneehill County | |
Well Name: EMBER HUXLEY 6-9-34-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411215 | |
License Date: 2009-06-29 | |
License Status: Issued | |
Spud Date: 2009-09-11 | |
Final Drill Date: 2009-09-14 | |
Well Total Depth: 914.00 m | |
Surface Hole Latitude: 51.902523 | |
Surface Hole Longitude: -113.351448 |
Date | Event |
---|---|
2009-06-29 | Obtained License |
2009-09-11 | Surface Casing Operation Performed |
2009-09-14 | Finished Drilling |
2009-09-14 | Well Mode changed to Drilled and Cased |
2009-09-15 | Production Casing Operation Performed |
2009-09-15 | Rig Released |
2009-09-15 | Well Log Performed |
2009-10-01 | Well Log Performed |
2009-10-13 | Well Log Performed |
2009-11-25 | Perforation Treatment Performed - Jet Perforation |
2009-11-27 | Perforation Treatment Performed - Fractured |
2009-11-27 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-11-27 | Well Mode changed to Testing |
2009-12-03 | Perforation Treatment Performed - Jet Perforation |
2009-12-16 | Perforation Treatment Performed - Fractured |
2009-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-12-20 | Well Mode changed to Testing |
2010-01-05 | Well Began Production |
2010-01-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-05 | Well Mode changed to Flowing |
2010-01-26 | Well Log Performed |
2012-04-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-04-07 | Well Mode changed to Suspended |
2012-10-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-10-02 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-25 | Perforation | 892.50 | 895.00 | 13 |
2009-12-03 | Perforation | 318.20 | 319.20 | 13 |
2009-12-03 | Perforation | 570.20 | 570.70 | 13 |
2009-12-03 | Perforation | 578.90 | 581.90 | 13 |
2009-12-03 | Perforation | 438.20 | 438.70 | 13 |
2009-12-03 | Perforation | 450.80 | 451.30 | 13 |
2009-12-03 | Perforation | 431.20 | 432.20 | 13 |
2009-12-03 | Perforation | 384.30 | 385.80 | 13 |
2009-12-03 | Perforation | 388.00 | 389.00 | 13 |
2009-12-03 | Perforation | 496.10 | 497.10 | 13 |
2009-12-03 | Perforation | 502.90 | 503.40 | 13 |
2009-11-27 | Fracture | 892.00 | 895.00 | 0 |
2009-12-03 | Perforation | 493.00 | 493.50 | 13 |
2009-12-03 | Perforation | 455.50 | 457.50 | 13 |
2009-12-03 | Perforation | 489.00 | 492.00 | 13 |
2009-12-03 | Perforation | 332.60 | 333.10 | 13 |
2009-12-03 | Perforation | 507.00 | 510.00 | 13 |
2009-12-03 | Perforation | 602.50 | 604.00 | 13 |
2009-12-03 | Perforation | 471.50 | 473.00 | 13 |
2009-12-03 | Perforation | 473.00 | 476.00 | 13 |
2009-12-03 | Perforation | 587.90 | 588.40 | 13 |
2009-12-03 | Perforation | 613.20 | 613.70 | 13 |
2009-12-03 | Perforation | 558.60 | 559.10 | 13 |
2009-12-03 | Perforation | 665.00 | 668.00 | 13 |
2009-12-03 | Perforation | 592.50 | 593.50 | 13 |
2009-12-03 | Perforation | 600.50 | 601.50 | 13 |
2009-12-03 | Perforation | 467.00 | 468.50 | 13 |
2009-12-03 | Perforation | 360.00 | 362.00 | 13 |
2009-12-03 | Perforation | 362.00 | 365.00 | 13 |
2009-12-03 | Perforation | 335.00 | 335.50 | 13 |
2009-12-03 | Perforation | 348.00 | 351.00 | 13 |
2009-12-03 | Perforation | 410.00 | 413.00 | 13 |
2009-12-03 | Perforation | 416.00 | 418.50 | 13 |
2009-12-03 | Perforation | 563.80 | 564.30 | 13 |
2009-12-03 | Perforation | 408.50 | 410.00 | 13 |
2009-12-03 | Perforation | 369.00 | 371.00 | 13 |
2009-12-16 | Fracture | 384.30 | 581.90 | 0 |
2009-12-16 | Fracture | 665.00 | 668.00 | 0 |
2009-12-16 | Fracture | 318.20 | 604.00 | 0 |
2009-12-16 | Fracture | 587.90 | 613.70 | 0 |
2009-12-03 | Perforation | 551.90 | 552.40 | 13 |
2009-12-03 | Perforation | 529.80 | 530.30 | 13 |
2009-12-03 | Perforation | 541.60 | 542.10 | 13 |
2009-12-03 | Perforation | 321.20 | 321.70 | 13 |
2009-12-03 | Perforation | 325.00 | 325.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 57 | 0.0 | 0.0 | 0.0 |
2010 | 8663 | 0.0 | 0.0 | 0.0 |
2011 | 8591 | 0.0 | 0.0 | 0.0 |
2012 | 4497 | 0.0 | 0.0 | 0.0 |
2013 | 8627 | 0.0 | 0.0 | 0.0 |
2014 | 8500 | 0.0 | 0.0 | 0.0 |
2015 | 8641 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]