If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344240614020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.895434,"lon":-113.396481,"icon":""}]} |
Location: 02/14-06-034-24W4/0 | |
Location Alias: 02/14-06-34-24 W4M | |
Location Alias 2: 02/14-06-034-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 24 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 HUXLEY 14-6-34-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411204 | |
License Date: 2009-06-29 | |
License Status: Issued | |
Spud Date: 2009-11-11 | |
Final Drill Date: 2009-11-19 | |
Well Total Depth: 949.00 m | |
Surface Hole Latitude: 51.895434 | |
Surface Hole Longitude: -113.396481 |
Date | Event |
---|---|
2009-06-29 | Obtained License |
2009-11-11 | Surface Casing Operation Performed |
2009-11-19 | Finished Drilling |
2009-11-19 | Well Mode changed to Drilled and Cased |
2009-11-20 | Production Casing Operation Performed |
2009-11-20 | Rig Released |
2009-11-28 | Well Log Performed |
2010-01-10 | Perforation Treatment Performed - Jet Perforation |
2010-01-24 | Perforation Treatment Performed - Fractured |
2010-01-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-27 | Well Log Performed |
2010-01-27 | Well Mode changed to Testing |
2010-01-30 | Perforation Treatment Performed - Jet Perforation |
2010-02-03 | Perforation Treatment Performed - Fractured |
2010-02-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-04 | Well Mode changed to Test Completed |
2010-02-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-05 | Well Mode changed to Testing |
2010-02-11 | Well Began Production |
2010-02-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-11 | Well Mode changed to Flowing |
2010-03-08 | Well Log Performed |
2012-04-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-04-09 | Well Mode changed to Suspended |
2012-10-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-10-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-10 | Perforation | 859.50 | 860.00 | 13 |
2010-01-30 | Perforation | 516.00 | 517.00 | 13 |
2010-01-30 | Perforation | 424.00 | 425.00 | 13 |
2010-01-30 | Perforation | 342.30 | 343.30 | 13 |
2010-01-30 | Perforation | 465.30 | 465.80 | 13 |
2010-01-30 | Perforation | 480.70 | 482.20 | 13 |
2010-01-30 | Perforation | 472.50 | 474.00 | 13 |
2010-01-30 | Perforation | 624.80 | 625.30 | 13 |
2010-01-30 | Perforation | 615.40 | 616.40 | 13 |
2010-01-30 | Perforation | 609.90 | 610.40 | 13 |
2010-01-30 | Perforation | 601.70 | 605.20 | 13 |
2010-01-10 | Perforation | 910.70 | 911.20 | 13 |
2010-01-30 | Perforation | 528.10 | 529.10 | 13 |
2010-01-30 | Perforation | 525.40 | 525.90 | 13 |
2010-01-30 | Perforation | 536.30 | 538.80 | 13 |
2010-01-30 | Perforation | 552.40 | 552.90 | 13 |
2010-02-03 | Fracture | 342.30 | 552.90 | 0 |
2010-02-03 | Fracture | 615.40 | 625.30 | 0 |
2010-02-03 | Fracture | 601.70 | 610.40 | 0 |
2010-01-10 | Perforation | 915.30 | 915.80 | 13 |
2010-01-24 | Fracture | 859.50 | 860.00 | 0 |
2010-01-24 | Fracture | 910.70 | 915.80 | 0 |
2010-01-30 | Perforation | 488.10 | 489.10 | 13 |
2010-01-30 | Perforation | 485.60 | 486.10 | 13 |
2010-01-30 | Perforation | 511.00 | 512.00 | 13 |
2010-01-30 | Perforation | 523.10 | 524.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7823 | 0.0 | 0.0 | 0.0 |
2011 | 8746 | 0.0 | 0.0 | 0.0 |
2012 | 4506 | 0.0 | 0.0 | 0.0 |
2013 | 8232 | 0.0 | 0.0 | 0.0 |
2014 | 8529 | 0.0 | 0.0 | 0.0 |
2015 | 8643 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 7680 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]