If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344233501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.956811,"lon":-113.149325,"icon":""}]} |
Location: 00/01-35-034-23W4/0 | |
Location Alias: 00/01-35-34-23 W4M | |
Location Alias 2: 00/01-35-034-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 23 | |
Section: 35 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 1-35-34-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0453205 | |
License Date: 2013-01-07 | |
License Status: Issued | |
Spud Date: 2013-01-28 | |
Final Drill Date: 2013-01-29 | |
Well Total Depth: 569.00 m | |
Surface Hole Latitude: 51.956811 | |
Surface Hole Longitude: -113.149325 |
Date | Event |
---|---|
2013-01-07 | Obtained License |
2013-01-28 | Surface Casing Operation Performed |
2013-01-29 | Finished Drilling |
2013-01-29 | Production Casing Operation Performed |
2013-01-29 | Well Mode changed to Drilled and Cased |
2013-01-30 | Rig Released |
2013-02-06 | Well Log Performed |
2013-02-13 | Perforation Treatment Performed - Jet Perforation |
2013-02-20 | Perforation Treatment Performed - Fractured |
2013-02-25 | Well Began Production |
2013-02-25 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-25 | Well Mode changed to Flowing |
2013-03-21 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-28 | Precision Drilling Corporation | 133 | N/A | Drill To LD |
2013-01-28 | Precision Drilling Corporation | 133 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-13 | Perforation | 542.20 | 542.60 | 13 |
2013-02-13 | Perforation | 406.40 | 406.80 | 13 |
2013-02-13 | Perforation | 399.10 | 399.50 | 13 |
2013-02-13 | Perforation | 393.90 | 394.30 | 13 |
2013-02-13 | Perforation | 383.60 | 384.00 | 13 |
2013-02-13 | Perforation | 345.20 | 345.60 | 13 |
2013-02-13 | Perforation | 332.70 | 334.10 | 13 |
2013-02-20 | Fracture | 345.20 | 542.60 | 0 |
2013-03-21 | Perforation | 542.10 | 542.90 | 13 |
2013-03-21 | Perforation | 514.30 | 516.30 | 13 |
2013-03-21 | Perforation | 503.30 | 504.70 | 13 |
2013-02-13 | Perforation | 515.50 | 515.90 | 13 |
2013-03-21 | Perforation | 495.10 | 495.80 | 13 |
2013-03-21 | Perforation | 480.60 | 481.70 | 13 |
2013-03-21 | Perforation | 450.20 | 451.70 | 13 |
2013-03-21 | Perforation | 440.50 | 441.30 | 13 |
2013-03-21 | Perforation | 431.90 | 435.20 | 13 |
2013-03-21 | Perforation | 410.40 | 412.00 | 13 |
2013-03-21 | Perforation | 399.00 | 400.00 | 13 |
2013-03-21 | Perforation | 393.90 | 394.60 | 13 |
2013-03-21 | Perforation | 383.40 | 384.30 | 13 |
2013-03-21 | Perforation | 345.20 | 346.10 | 13 |
2013-02-13 | Perforation | 503.70 | 504.10 | 13 |
2013-03-21 | Perforation | 332.20 | 334.50 | 13 |
2013-02-13 | Perforation | 495.10 | 495.50 | 13 |
2013-02-13 | Perforation | 480.80 | 481.20 | 13 |
2013-02-13 | Perforation | 450.80 | 451.20 | 13 |
2013-02-13 | Perforation | 440.50 | 440.90 | 13 |
2013-02-13 | Perforation | 431.90 | 434.30 | 13 |
2013-02-13 | Perforation | 410.70 | 412.00 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-20 | 2013-02-20 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7439 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 3997 | 0.0 | 0.0 | 0.0 |
2020 | 2157 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-30 | No Incident Encountered | 0.00 | 0.00 |
2013-02-13 | No Incident Encountered | 0.00 | 0.00 |
2013-02-20 | No Incident Encountered | 0.00 | 0.00 |
2013-03-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]