If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344230416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.894507,"lon":-113.197857,"icon":""}]} |
Location: 00/16-04-034-23W4/0 | |
Location Alias: 00/16-04-34-23 W4M | |
Location Alias 2: 00/16-04-034-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 23 | |
Section: 04 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 16-4-34-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0389649 | |
License Date: 2007-12-21 | |
License Status: Issued | |
Spud Date: 2008-09-10 | |
Final Drill Date: 2008-09-19 | |
Well Total Depth: 612.00 m | |
Surface Hole Latitude: 51.894507 | |
Surface Hole Longitude: -113.197857 |
Date | Event |
---|---|
2007-12-21 | Obtained License |
2008-09-10 | Surface Casing Operation Performed |
2008-09-19 | Finished Drilling |
2008-09-19 | Production Casing Operation Performed |
2008-09-19 | Rig Released |
2008-09-19 | Well Mode changed to Drilled and Cased |
2008-10-01 | Well Log Performed |
2008-10-05 | Well Log Performed |
2008-10-19 | Perforation Treatment Performed - Jet Perforation |
2008-10-19 | Well Log Performed |
2008-11-05 | Perforation Treatment Performed - Fractured |
2008-11-14 | Well Began Production |
2008-11-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-11-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-19 | Perforation | 335.20 | 336.40 | 20 |
2008-10-19 | Perforation | 303.50 | 305.90 | 20 |
2008-10-19 | Perforation | 309.60 | 310.80 | 20 |
2008-10-19 | Perforation | 281.00 | 281.80 | 20 |
2008-10-19 | Perforation | 277.50 | 278.60 | 20 |
2008-10-19 | Perforation | 258.30 | 259.50 | 20 |
2008-10-19 | Perforation | 255.70 | 256.90 | 20 |
2008-10-19 | Perforation | 493.20 | 494.20 | 20 |
2008-10-19 | Perforation | 487.30 | 488.70 | 20 |
2008-10-19 | Perforation | 475.80 | 477.30 | 20 |
2008-10-19 | Perforation | 496.80 | 498.00 | 20 |
2008-10-19 | Perforation | 322.70 | 324.20 | 20 |
2008-10-19 | Perforation | 527.10 | 528.20 | 20 |
2008-10-19 | Perforation | 519.80 | 521.40 | 20 |
2008-10-19 | Perforation | 501.50 | 502.90 | 20 |
2008-10-19 | Perforation | 463.50 | 464.40 | 20 |
2008-10-19 | Perforation | 400.00 | 401.30 | 20 |
2008-10-19 | Perforation | 413.80 | 414.70 | 20 |
2008-10-19 | Perforation | 421.80 | 423.60 | 20 |
2008-10-19 | Perforation | 402.90 | 403.70 | 20 |
2008-10-19 | Perforation | 453.50 | 454.50 | 20 |
2008-10-19 | Perforation | 424.20 | 425.20 | 20 |
2008-10-19 | Perforation | 318.00 | 319.20 | 20 |
2008-10-19 | Perforation | 434.70 | 437.50 | 20 |
2008-11-05 | Fracture | 286.00 | 287.30 | 0 |
2008-11-05 | Fracture | 277.50 | 278.60 | 0 |
2008-11-05 | Fracture | 335.20 | 336.40 | 0 |
2008-11-05 | Fracture | 377.10 | 377.80 | 0 |
2008-11-05 | Fracture | 318.00 | 319.20 | 0 |
2008-11-05 | Fracture | 322.70 | 324.20 | 0 |
2008-11-05 | Fracture | 303.50 | 305.90 | 0 |
2008-11-05 | Fracture | 289.70 | 292.00 | 0 |
2008-11-05 | Fracture | 281.00 | 281.80 | 0 |
2008-10-19 | Perforation | 377.10 | 377.80 | 20 |
2008-11-05 | Fracture | 258.30 | 259.50 | 0 |
2008-11-05 | Fracture | 255.70 | 256.90 | 0 |
2008-11-05 | Fracture | 309.60 | 310.80 | 0 |
2008-11-05 | Fracture | 487.30 | 488.70 | 0 |
2008-11-05 | Fracture | 493.20 | 494.20 | 0 |
2008-11-05 | Fracture | 463.50 | 464.40 | 0 |
2008-11-05 | Fracture | 475.80 | 477.30 | 0 |
2008-11-05 | Fracture | 519.80 | 521.40 | 0 |
2008-11-05 | Fracture | 527.10 | 528.20 | 0 |
2008-11-05 | Fracture | 496.80 | 498.00 | 0 |
2008-10-19 | Perforation | 393.00 | 394.70 | 20 |
2008-11-05 | Fracture | 501.50 | 502.90 | 0 |
2008-11-05 | Fracture | 393.00 | 394.70 | 0 |
2008-11-05 | Fracture | 400.00 | 403.70 | 0 |
2008-11-05 | Fracture | 378.50 | 381.30 | 0 |
2008-11-05 | Fracture | 388.40 | 389.80 | 0 |
2008-11-05 | Fracture | 434.70 | 437.50 | 0 |
2008-11-05 | Fracture | 453.50 | 454.50 | 0 |
2008-11-05 | Fracture | 413.80 | 414.70 | 0 |
2008-11-05 | Fracture | 421.80 | 425.20 | 0 |
2008-10-19 | Perforation | 388.40 | 389.80 | 20 |
2008-10-19 | Perforation | 378.50 | 381.30 | 20 |
2008-10-19 | Perforation | 286.00 | 287.30 | 20 |
2008-10-19 | Perforation | 289.70 | 292.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 864 | 0.0 | 0.0 | 0.0 |
2009 | 8561 | 0.0 | 0.0 | 0.0 |
2010 | 8538 | 0.0 | 0.0 | 0.0 |
2011 | 8596 | 0.0 | 0.0 | 0.0 |
2012 | 8219 | 0.0 | 0.0 | 0.0 |
2013 | 8152 | 0.0 | 0.0 | 0.0 |
2014 | 8658 | 0.0 | 0.0 | 0.0 |
2015 | 8351 | 0.0 | 0.0 | 0.0 |
2016 | 8607 | 0.0 | 0.0 | 0.0 |
2017 | 5071 | 0.0 | 0.0 | 0.0 |
2018 | 4876 | 0.0 | 0.0 | 0.0 |
2019 | 4086 | 0.0 | 0.0 | 0.0 |
2020 | 1897 | 0.0 | 0.0 | 0.0 |
For data sources see[5]