If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344230109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.89111,"lon":-113.127493,"icon":""}]} |
Location: 00/09-01-034-23W4/0 | |
Location Alias: 00/09-01-34-23 W4M | |
Location Alias 2: 00/09-01-034-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 23 | |
Section: 01 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 9-1-34-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0453602 | |
License Date: 2013-01-15 | |
License Status: Issued | |
Spud Date: 2013-01-22 | |
Final Drill Date: 2013-01-23 | |
Well Total Depth: 554.00 m | |
Surface Hole Latitude: 51.891110 | |
Surface Hole Longitude: -113.127493 |
Date | Event |
---|---|
2013-01-15 | Obtained License |
2013-01-22 | Surface Casing Operation Performed |
2013-01-23 | Finished Drilling |
2013-01-23 | Production Casing Operation Performed |
2013-01-23 | Well Mode changed to Drilled and Cased |
2013-01-24 | Rig Released |
2013-01-31 | Well Log Performed |
2013-02-07 | Perforation Treatment Performed - Jet Perforation |
2013-02-15 | Perforation Treatment Performed - Fractured |
2013-02-19 | Well Began Production |
2013-02-19 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-19 | Well Mode changed to Flowing |
2013-03-22 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-15 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
2013-01-22 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-07 | Perforation | 529.00 | 529.40 | 13 |
2013-02-07 | Perforation | 418.10 | 418.40 | 13 |
2013-02-07 | Perforation | 399.60 | 400.00 | 13 |
2013-02-07 | Perforation | 394.80 | 395.20 | 13 |
2013-02-07 | Perforation | 393.60 | 394.00 | 13 |
2013-02-07 | Perforation | 392.70 | 393.10 | 13 |
2013-02-07 | Perforation | 387.30 | 387.70 | 13 |
2013-02-07 | Perforation | 385.90 | 386.30 | 13 |
2013-02-07 | Perforation | 383.60 | 384.00 | 13 |
2013-02-07 | Perforation | 349.40 | 349.80 | 13 |
2013-02-07 | Perforation | 322.10 | 322.50 | 13 |
2013-02-07 | Perforation | 500.50 | 500.90 | 13 |
2013-02-07 | Perforation | 288.30 | 288.70 | 13 |
2013-02-07 | Perforation | 254.30 | 254.70 | 13 |
2013-02-07 | Perforation | 225.30 | 226.60 | 13 |
2013-02-15 | Fracture | 254.30 | 529.40 | 0 |
2013-03-22 | Perforation | 528.40 | 529.90 | 13 |
2013-03-22 | Perforation | 499.30 | 501.20 | 13 |
2013-03-22 | Perforation | 486.40 | 487.30 | 13 |
2013-03-22 | Perforation | 477.30 | 477.90 | 13 |
2013-03-22 | Perforation | 464.60 | 465.40 | 13 |
2013-03-22 | Perforation | 430.40 | 431.90 | 13 |
2013-02-07 | Perforation | 486.70 | 487.10 | 13 |
2013-03-22 | Perforation | 424.00 | 424.70 | 13 |
2013-03-22 | Perforation | 417.10 | 419.80 | 13 |
2013-03-22 | Perforation | 399.50 | 400.20 | 13 |
2013-03-22 | Perforation | 392.20 | 395.60 | 13 |
2013-03-22 | Perforation | 385.80 | 387.90 | 13 |
2013-03-22 | Perforation | 383.70 | 384.20 | 13 |
2013-03-22 | Perforation | 322.00 | 322.90 | 13 |
2013-03-22 | Perforation | 254.30 | 255.10 | 13 |
2013-02-07 | Perforation | 477.40 | 477.80 | 13 |
2013-02-07 | Perforation | 464.80 | 465.20 | 13 |
2013-02-07 | Perforation | 461.30 | 462.20 | 13 |
2013-02-07 | Perforation | 431.20 | 431.60 | 13 |
2013-02-07 | Perforation | 424.20 | 424.60 | 13 |
2013-02-07 | Perforation | 418.90 | 419.30 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-15 | 2013-02-15 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7559 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
2020 | 127 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-23 | No Incident Encountered | 0.00 | 0.00 |
2013-02-07 | No Incident Encountered | 0.00 | 0.00 |
2013-02-15 | No Incident Encountered | 0.00 | 0.00 |
2013-03-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]