If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344230101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.884278,"lon":-113.126764,"icon":""}]} |
Location: 00/01-01-034-23W4/0 | |
Location Alias: 00/01-01-34-23 W4M | |
Location Alias 2: 00/01-01-034-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 23 | |
Section: 01 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 1-1-34-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0453601 | |
License Date: 2013-01-15 | |
License Status: Issued | |
Spud Date: 2013-01-24 | |
Final Drill Date: 2013-01-25 | |
Well Total Depth: 544.00 m | |
Surface Hole Latitude: 51.884278 | |
Surface Hole Longitude: -113.126764 |
Date | Event |
---|---|
2013-01-15 | Obtained License |
2013-01-24 | Surface Casing Operation Performed |
2013-01-25 | Finished Drilling |
2013-01-25 | Production Casing Operation Performed |
2013-01-25 | Rig Released |
2013-01-25 | Well Mode changed to Drilled and Cased |
2013-02-04 | Well Log Performed |
2013-02-13 | Perforation Treatment Performed - Jet Perforation |
2013-02-17 | Perforation Treatment Performed - Fractured |
2013-02-19 | Well Began Production |
2013-02-19 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-19 | Well Mode changed to Flowing |
2013-03-20 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-24 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
2013-01-24 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-13 | Perforation | 521.20 | 521.60 | 13 |
2013-02-13 | Perforation | 405.80 | 407.90 | 13 |
2013-02-13 | Perforation | 396.60 | 397.00 | 13 |
2013-02-13 | Perforation | 387.90 | 388.30 | 13 |
2013-02-13 | Perforation | 380.30 | 382.70 | 13 |
2013-02-13 | Perforation | 375.00 | 375.40 | 13 |
2013-02-13 | Perforation | 325.60 | 326.00 | 13 |
2013-02-13 | Perforation | 274.70 | 275.10 | 13 |
2013-02-13 | Perforation | 255.10 | 255.50 | 13 |
2013-02-17 | Fracture | 274.70 | 521.60 | 0 |
2013-03-20 | Perforation | 520.10 | 521.70 | 13 |
2013-02-13 | Perforation | 492.60 | 493.00 | 13 |
2013-03-20 | Perforation | 491.10 | 493.30 | 13 |
2013-03-20 | Perforation | 478.10 | 479.00 | 13 |
2013-03-20 | Perforation | 470.10 | 471.90 | 13 |
2013-03-20 | Perforation | 456.80 | 457.50 | 13 |
2013-03-20 | Perforation | 416.90 | 418.10 | 13 |
2013-03-20 | Perforation | 405.30 | 408.10 | 13 |
2013-03-20 | Perforation | 387.90 | 388.50 | 13 |
2013-03-20 | Perforation | 379.90 | 383.30 | 13 |
2013-03-20 | Perforation | 374.90 | 376.40 | 13 |
2013-03-20 | Perforation | 325.70 | 326.50 | 13 |
2013-02-13 | Perforation | 491.50 | 491.90 | 13 |
2013-03-20 | Perforation | 274.70 | 275.20 | 13 |
2013-03-20 | Perforation | 255.00 | 255.60 | 13 |
2013-02-13 | Perforation | 478.40 | 478.80 | 13 |
2013-02-13 | Perforation | 470.10 | 470.50 | 13 |
2013-02-13 | Perforation | 456.70 | 457.10 | 13 |
2013-02-13 | Perforation | 451.70 | 453.00 | 13 |
2013-02-13 | Perforation | 436.30 | 441.00 | 13 |
2013-02-13 | Perforation | 417.10 | 417.50 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-17 | 2013-02-17 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7559 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-25 | No Incident Encountered | 0.00 | 0.00 |
2013-02-13 | No Incident Encountered | 0.00 | 0.00 |
2013-02-17 | No Incident Encountered | 0.00 | 0.00 |
2013-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]