If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344223503002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.957791,"lon":-113.022346,"icon":""}]} |
Location: 00/03-35-034-22W4/2 | |
Location Alias: 00/03-35-34-22 W4M | |
Location Alias 2: 00/03-35-034-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 22 | |
Section: 35 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 3-35-34-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425350 | |
License Date: 2010-11-01 | |
License Status: Issued | |
Spud Date: 2010-12-14 | |
Final Drill Date: 2010-12-21 | |
Well Total Depth: 821.00 m | |
Surface Hole Latitude: 51.957791 | |
Surface Hole Longitude: -113.022346 |
Date | Event |
---|---|
2010-11-01 | Obtained License |
2010-12-14 | Surface Casing Operation Performed |
2010-12-21 | Finished Drilling |
2010-12-21 | Production Casing Operation Performed |
2010-12-21 | Rig Released |
2010-12-21 | Well Mode changed to Drilled and Cased |
2011-01-07 | Well Log Performed |
2011-02-04 | Perforation Treatment Performed - Jet Perforation |
2011-02-14 | Perforation Treatment Performed - Fractured |
2011-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-07 | Plug Back Performed |
2011-04-22 | Well Began Production |
2011-04-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-04 | Perforation | 300.20 | 301.20 | 13 |
2011-02-04 | Perforation | 247.90 | 249.40 | 13 |
2011-02-04 | Perforation | 251.30 | 252.30 | 13 |
2011-02-04 | Perforation | 453.00 | 454.00 | 13 |
2011-02-04 | Perforation | 242.50 | 243.00 | 13 |
2011-02-04 | Perforation | 277.30 | 278.30 | 13 |
2011-02-04 | Perforation | 281.70 | 283.20 | 13 |
2011-02-04 | Perforation | 259.70 | 260.70 | 13 |
2011-02-04 | Perforation | 271.30 | 272.30 | 13 |
2011-02-04 | Perforation | 469.00 | 470.00 | 13 |
2011-02-04 | Perforation | 476.90 | 477.90 | 13 |
2011-02-04 | Perforation | 317.90 | 319.90 | 13 |
2011-02-04 | Perforation | 427.20 | 430.20 | 13 |
2011-02-04 | Perforation | 455.50 | 456.50 | 13 |
2011-02-04 | Perforation | 787.20 | 788.20 | 13 |
2011-02-04 | Perforation | 796.50 | 797.50 | 13 |
2011-02-04 | Perforation | 491.20 | 492.70 | 13 |
2011-02-04 | Perforation | 776.50 | 777.50 | 13 |
2011-02-04 | Perforation | 390.30 | 391.80 | 13 |
2011-02-04 | Perforation | 393.00 | 396.00 | 13 |
2011-02-04 | Perforation | 375.90 | 376.90 | 13 |
2011-02-04 | Perforation | 379.00 | 380.00 | 13 |
2011-02-04 | Perforation | 289.90 | 290.90 | 13 |
2011-02-04 | Perforation | 416.90 | 419.90 | 13 |
2011-02-04 | Perforation | 420.40 | 421.90 | 13 |
2011-02-04 | Perforation | 412.70 | 414.20 | 13 |
2011-02-04 | Perforation | 397.20 | 398.20 | 13 |
2011-02-14 | Fracture | 453.00 | 454.00 | 0 |
2011-02-14 | Fracture | 776.50 | 797.50 | 0 |
2011-02-14 | Fracture | 242.50 | 492.70 | 0 |
2011-03-07 | Packing Device Capped w/Cement | 752.00 | 760.00 | 0 |
2011-02-04 | Perforation | 293.20 | 293.70 | 13 |
2011-02-04 | Perforation | 361.50 | 363.50 | 13 |
2011-02-04 | Perforation | 366.20 | 368.20 | 13 |
2011-02-04 | Perforation | 328.50 | 330.50 | 13 |
2011-02-04 | Perforation | 343.60 | 344.10 | 13 |
2011-02-04 | Perforation | 286.70 | 287.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6068 | 0.0 | 0.0 | 0.0 |
2012 | 4999 | 0.0 | 0.0 | 0.0 |
2013 | 8674 | 0.0 | 0.0 | 0.0 |
2014 | 8639 | 0.0 | 0.0 | 0.0 |
2015 | 8696 | 0.0 | 0.0 | 0.0 |
2016 | 8688 | 0.0 | 0.0 | 0.0 |
2017 | 8704 | 0.0 | 0.0 | 0.0 |
2018 | 8546 | 0.0 | 0.0 | 0.0 |
2019 | 8627 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]