If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344221416030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.923384,"lon":-113.008735,"icon":""}]} |
Location: 03/16-14-034-22W4/0 | |
Location Alias: 03/16-14-34-22 W4M | |
Location Alias 2: 03/16-14-034-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 22 | |
Section: 14 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 103 ELNORA 16-14-34-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0453060 | |
License Date: 2013-01-02 | |
License Status: Issued | |
Spud Date: 2013-01-20 | |
Final Drill Date: 2013-01-21 | |
Well Total Depth: 495.00 m | |
Surface Hole Latitude: 51.923384 | |
Surface Hole Longitude: -113.008735 |
Date | Event |
---|---|
2013-01-02 | Obtained License |
2013-01-20 | Surface Casing Operation Performed |
2013-01-21 | Finished Drilling |
2013-01-21 | Production Casing Operation Performed |
2013-01-21 | Well Mode changed to Drilled and Cased |
2013-01-22 | Rig Released |
2013-01-29 | Well Log Performed |
2013-01-31 | Perforation Treatment Performed - Jet Perforation |
2013-02-14 | Perforation Treatment Performed - Fractured |
2013-02-18 | Well Began Production |
2013-02-18 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-18 | Well Mode changed to Flowing |
2013-03-23 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-20 | Precision Drilling Corporation | 133 | N/A | Drill To LD |
2013-01-20 | Precision Drilling Corporation | 133 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-01-31 | Perforation | 466.10 | 466.50 | 6 |
2013-01-31 | Perforation | 358.40 | 358.80 | 6 |
2013-01-31 | Perforation | 357.10 | 357.50 | 6 |
2013-01-31 | Perforation | 337.80 | 338.20 | 6 |
2013-01-31 | Perforation | 334.60 | 335.00 | 6 |
2013-01-31 | Perforation | 331.00 | 332.80 | 6 |
2013-01-31 | Perforation | 320.80 | 321.20 | 6 |
2013-01-31 | Perforation | 318.10 | 318.50 | 6 |
2013-01-31 | Perforation | 311.80 | 312.20 | 6 |
2013-01-31 | Perforation | 264.70 | 265.30 | 6 |
2013-01-31 | Perforation | 261.80 | 262.20 | 6 |
2013-01-31 | Perforation | 440.30 | 440.70 | 6 |
2013-01-31 | Perforation | 220.90 | 221.30 | 6 |
2013-01-31 | Perforation | 215.00 | 215.40 | 6 |
2013-01-31 | Perforation | 204.50 | 204.90 | 6 |
2013-02-14 | Fracture | 215.00 | 466.50 | 0 |
2013-03-23 | Perforation | 439.70 | 440.90 | 13 |
2013-03-23 | Perforation | 424.20 | 425.10 | 13 |
2013-03-23 | Perforation | 418.30 | 419.70 | 13 |
2013-03-23 | Perforation | 404.00 | 404.80 | 13 |
2013-03-23 | Perforation | 375.20 | 376.30 | 13 |
2013-03-23 | Perforation | 363.90 | 364.80 | 13 |
2013-01-31 | Perforation | 424.60 | 425.00 | 6 |
2013-03-23 | Perforation | 357.10 | 360.40 | 13 |
2013-03-23 | Perforation | 337.20 | 338.90 | 13 |
2013-03-23 | Perforation | 334.10 | 335.70 | 13 |
2013-03-23 | Perforation | 318.10 | 318.90 | 13 |
2013-03-23 | Perforation | 311.60 | 312.60 | 13 |
2013-03-23 | Perforation | 261.60 | 262.10 | 13 |
2013-03-23 | Perforation | 220.80 | 221.40 | 13 |
2013-03-23 | Perforation | 204.00 | 205.10 | 13 |
2013-01-31 | Perforation | 419.00 | 419.40 | 6 |
2013-01-31 | Perforation | 404.30 | 404.70 | 6 |
2013-01-31 | Perforation | 399.80 | 401.20 | 6 |
2013-01-31 | Perforation | 375.70 | 376.10 | 6 |
2013-01-31 | Perforation | 364.00 | 364.40 | 6 |
2013-01-31 | Perforation | 360.00 | 360.40 | 6 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-14 | 2013-02-14 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7583 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-22 | No Incident Encountered | 0.00 | 0.00 |
2013-01-31 | No Incident Encountered | 0.00 | 0.00 |
2013-02-14 | No Incident Encountered | 0.00 | 0.00 |
2013-03-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]