Well ID: 0344220716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.908471,"lon":-113.102026,"icon":""}]} |
Location: 00/16-07-034-22W4/0 | |
Location Alias: 00/16-07-34-22 W4M | |
Location Alias 2: 00/16-07-034-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 22 | |
Section: 07 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 16-7-34-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0453008 | |
License Date: 2012-12-28 | |
License Status: Issued | |
Spud Date: 2013-01-15 | |
Final Drill Date: 2013-01-17 | |
Well Total Depth: 543.00 m | |
Surface Hole Latitude: 51.908471 | |
Surface Hole Longitude: -113.102026 |
Date | Event |
---|---|
2012-12-28 | Obtained License |
2013-01-16 | Surface Casing Operation Performed |
2013-01-17 | Finished Drilling |
2013-01-17 | Production Casing Operation Performed |
2013-01-17 | Rig Released |
2013-01-17 | Well Mode changed to Drilled and Cased |
2013-01-25 | Well Log Performed |
2013-01-30 | Perforation Treatment Performed - Jet Perforation |
2013-02-11 | Perforation Treatment Performed - Fractured |
2013-02-14 | Well Began Production |
2013-02-14 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-14 | Well Mode changed to Flowing |
2013-03-19 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-15 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
2013-01-15 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-01-30 | Perforation | 511.70 | 512.10 | 6 |
2013-01-30 | Perforation | 405.50 | 405.90 | 6 |
2013-01-30 | Perforation | 401.10 | 401.50 | 6 |
2013-01-30 | Perforation | 400.30 | 400.70 | 6 |
2013-01-30 | Perforation | 399.20 | 399.60 | 6 |
2013-01-30 | Perforation | 373.80 | 374.20 | 6 |
2013-01-30 | Perforation | 372.30 | 372.70 | 6 |
2013-01-30 | Perforation | 367.60 | 368.00 | 6 |
2013-01-30 | Perforation | 361.70 | 362.10 | 6 |
2013-01-30 | Perforation | 360.90 | 361.30 | 6 |
2013-01-30 | Perforation | 357.80 | 358.20 | 6 |
2013-01-30 | Perforation | 483.80 | 484.20 | 6 |
2013-01-30 | Perforation | 349.80 | 350.20 | 6 |
2013-01-30 | Perforation | 305.70 | 306.10 | 6 |
2013-01-30 | Perforation | 268.70 | 269.10 | 6 |
2013-01-30 | Perforation | 264.50 | 264.90 | 6 |
2013-01-30 | Perforation | 258.20 | 258.60 | 6 |
2013-02-11 | Fracture | 264.50 | 512.10 | 0 |
2013-03-19 | Perforation | 511.60 | 512.60 | 13 |
2013-03-19 | Perforation | 482.20 | 484.40 | 13 |
2013-03-19 | Perforation | 469.40 | 470.00 | 13 |
2013-03-19 | Perforation | 462.90 | 463.20 | 13 |
2013-01-30 | Perforation | 482.60 | 483.00 | 6 |
2013-03-19 | Perforation | 461.50 | 461.90 | 13 |
2013-03-19 | Perforation | 448.10 | 448.70 | 13 |
2013-03-19 | Perforation | 433.00 | 436.00 | 13 |
2013-03-19 | Perforation | 411.60 | 412.90 | 13 |
2013-03-19 | Perforation | 405.20 | 405.90 | 13 |
2013-03-19 | Perforation | 398.80 | 401.80 | 13 |
2013-03-19 | Perforation | 371.90 | 374.60 | 13 |
2013-03-19 | Perforation | 367.60 | 367.90 | 13 |
2013-03-19 | Perforation | 360.70 | 362.50 | 13 |
2013-03-19 | Perforation | 357.50 | 358.40 | 13 |
2013-01-30 | Perforation | 469.50 | 469.90 | 6 |
2013-03-19 | Perforation | 349.60 | 350.30 | 13 |
2013-03-19 | Perforation | 305.60 | 306.40 | 13 |
2013-03-19 | Perforation | 268.80 | 269.20 | 13 |
2013-03-19 | Perforation | 264.50 | 264.90 | 13 |
2013-03-19 | Perforation | 258.20 | 258.60 | 13 |
2013-01-30 | Perforation | 462.80 | 463.20 | 6 |
2013-01-30 | Perforation | 461.40 | 461.80 | 6 |
2013-01-30 | Perforation | 448.20 | 448.60 | 6 |
2013-01-30 | Perforation | 433.20 | 435.50 | 6 |
2013-01-30 | Perforation | 412.10 | 412.60 | 6 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-11 | 2013-02-11 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7679 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-17 | No Incident Encountered | 0.00 | 0.00 |
2013-01-30 | No Incident Encountered | 0.00 | 0.00 |
2013-02-11 | No Incident Encountered | 0.00 | 0.00 |
2013-03-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]