If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344220713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.908264,"lon":-113.118476,"icon":""}]} |
Location: 00/13-07-034-22W4/0 | |
Location Alias: 00/13-07-34-22 W4M | |
Location Alias 2: 00/13-07-034-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 22 | |
Section: 07 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 13-7-34-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0453011 | |
License Date: 2012-12-28 | |
License Status: Issued | |
Spud Date: 2013-01-18 | |
Final Drill Date: 2013-01-19 | |
Well Total Depth: 561.00 m | |
Surface Hole Latitude: 51.908264 | |
Surface Hole Longitude: -113.118476 |
Date | Event |
---|---|
2012-12-28 | Obtained License |
2013-01-18 | Surface Casing Operation Performed |
2013-01-19 | Finished Drilling |
2013-01-19 | Production Casing Operation Performed |
2013-01-19 | Well Mode changed to Drilled and Cased |
2013-01-20 | Rig Released |
2013-01-28 | Well Log Performed |
2013-01-31 | Perforation Treatment Performed - Jet Perforation |
2013-02-04 | Perforation Treatment Performed - Fractured |
2013-02-07 | Well Began Production |
2013-02-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-07 | Well Mode changed to Flowing |
2013-03-18 | Perforation Treatment Performed - Jet Perforation |
2013-03-20 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-01-18 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
2013-01-18 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-01-31 | Perforation | 531.00 | 531.40 | 6 |
2013-01-31 | Perforation | 390.30 | 390.70 | 6 |
2013-01-31 | Perforation | 385.50 | 385.90 | 6 |
2013-01-31 | Perforation | 384.60 | 385.00 | 6 |
2013-01-31 | Perforation | 382.00 | 382.40 | 6 |
2013-01-31 | Perforation | 374.40 | 374.80 | 6 |
2013-01-31 | Perforation | 354.00 | 354.40 | 6 |
2013-01-31 | Perforation | 326.30 | 326.70 | 6 |
2013-01-31 | Perforation | 285.90 | 286.30 | 6 |
2013-02-04 | Fracture | 326.30 | 531.40 | 0 |
2013-03-18 | Perforation | 530.80 | 531.60 | 13 |
2013-01-31 | Perforation | 504.50 | 504.90 | 6 |
2013-03-18 | Perforation | 504.40 | 504.80 | 13 |
2013-03-18 | Perforation | 502.60 | 503.80 | 13 |
2013-03-18 | Perforation | 489.10 | 490.10 | 13 |
2013-03-18 | Perforation | 467.80 | 468.60 | 13 |
2013-03-18 | Perforation | 433.30 | 434.50 | 13 |
2013-03-18 | Perforation | 419.80 | 422.50 | 13 |
2013-03-18 | Perforation | 389.60 | 392.60 | 13 |
2013-03-18 | Perforation | 384.10 | 386.60 | 13 |
2013-03-18 | Perforation | 381.70 | 382.80 | 13 |
2013-03-18 | Perforation | 374.10 | 374.90 | 13 |
2013-01-31 | Perforation | 503.10 | 503.50 | 6 |
2013-03-18 | Perforation | 354.10 | 354.50 | 13 |
2013-03-18 | Perforation | 325.30 | 373.30 | 13 |
2013-03-18 | Perforation | 285.60 | 286.80 | 13 |
2013-03-20 | Fracture | 325.30 | 531.60 | 0 |
2013-01-31 | Perforation | 489.40 | 489.80 | 6 |
2013-01-31 | Perforation | 468.00 | 468.40 | 6 |
2013-01-31 | Perforation | 433.90 | 434.30 | 6 |
2013-01-31 | Perforation | 421.80 | 422.20 | 6 |
2013-01-31 | Perforation | 420.40 | 420.80 | 6 |
2013-01-31 | Perforation | 391.30 | 391.70 | 6 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-04 | 2013-03-20 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7847 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-19 | No Incident Encountered | 0.00 | 0.00 |
2013-01-31 | No Incident Encountered | 0.00 | 0.00 |
2013-02-04 | No Incident Encountered | 0.00 | 0.00 |
2013-03-18 | No Incident Encountered | 0.00 | 0.00 |
2013-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]