X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344220708000

Well Details

Well ID: 0344220708000
Loading map...
Location: 00/08-07-034-22W4/0
Location Alias: 00/08-07-34-22 W4M
Location Alias 2: 00/08-07-034-22 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 22
Section: 07
County/Municipality: Kneehill County
Well Name: COP ET AL 100 ELNORA 8-7-34-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0412061
License Date: 2009-09-01
License Status: Suspension
Spud Date: 2009-10-27
Final Drill Date: 2009-10-29
Well Total Depth: 840.00 m
Surface Hole Latitude: 51.901166
Surface Hole Longitude: -113.100321

For data sources see[1][2]

Well History

Date Event
2009-09-01 Obtained License
2009-10-27 Lost Circulation Occurred
2009-10-27 Surface Casing Operation Performed
2009-10-29 Finished Drilling
2009-10-29 Production Casing Operation Performed
2009-10-29 Rig Released
2009-10-29 Well Mode changed to Drilled and Cased
2009-11-08 Well Log Performed
2009-11-13 Perforation Treatment Performed - Jet Perforation
2010-02-11 Well Began Production
2010-02-11 Well Fluid changed to Gas
2010-02-11 Well Mode changed to Flowing
2011-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-08 Plug Back Performed
2011-11-08 Well Fluid changed to Gas
2011-11-08 Well Mode changed to Abandoned Zone
2011-11-17 Perforation Treatment Performed - Jet Perforation
2011-12-22 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-13 Perforation 802.00 807.00 20
2011-11-17 Perforation 220.00 221.50 13
2011-11-17 Perforation 271.70 272.50 13
2011-11-17 Perforation 262.50 263.50 13
2011-11-17 Perforation 425.50 426.50 13
2011-11-17 Perforation 497.50 498.50 13
2011-11-17 Perforation 483.00 484.00 13
2011-11-17 Perforation 582.00 584.00 13
2011-11-17 Perforation 523.20 524.20 13
2011-11-17 Perforation 451.00 453.00 13
2011-11-17 Perforation 430.20 431.40 13
2009-11-13 Perforation 780.00 783.00 20
2011-11-17 Perforation 461.90 462.80 13
2011-11-17 Perforation 457.50 458.50 13
2011-12-22 Fracture 220.00 524.20 0
2011-12-22 Fracture 582.00 584.00 0
2011-11-08 Packing Device Capped w/Cement 766.00 774.00 0
2011-11-17 Perforation 390.00 391.00 13
2011-11-17 Perforation 379.50 381.50 13
2011-11-17 Perforation 419.50 421.50 13
2011-11-17 Perforation 392.00 393.00 13
2011-11-17 Perforation 376.00 377.00 13
2011-11-17 Perforation 251.00 253.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 791 0.0 0.0 0.0
2011 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-10-27 Lost Circulation 40.00 91.00

For data sources see[6]

References