If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344220609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.891059,"lon":-113.101556,"icon":""}]} |
Location: 00/09-06-034-22W4/0 | |
Location Alias: 00/09-06-34-22 W4M | |
Location Alias 2: 00/09-06-034-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 22 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ELNORA 9-6-34-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0401169 | |
License Date: 2008-09-22 | |
License Status: Issued | |
Spud Date: 2008-09-30 | |
Final Drill Date: 2008-10-01 | |
Well Total Depth: 600.00 m | |
Surface Hole Latitude: 51.891059 | |
Surface Hole Longitude: -113.101556 |
Date | Event |
---|---|
2008-09-22 | Obtained License |
2008-09-30 | Surface Casing Operation Performed |
2008-10-01 | Finished Drilling |
2008-10-01 | Production Casing Operation Performed |
2008-10-01 | Rig Released |
2008-10-01 | Well Mode changed to Drilled and Cased |
2008-10-12 | Well Log Performed |
2008-10-23 | Perforation Treatment Performed - Jet Perforation |
2008-10-23 | Well Log Performed |
2008-11-09 | Perforation Treatment Performed - Fractured |
2010-01-22 | Well Began Production |
2010-01-22 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-01-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-23 | Perforation | 262.90 | 264.50 | 20 |
2008-10-23 | Perforation | 396.50 | 398.10 | 20 |
2008-10-23 | Perforation | 404.50 | 407.90 | 20 |
2008-10-23 | Perforation | 411.00 | 412.50 | 20 |
2008-10-23 | Perforation | 414.70 | 416.90 | 20 |
2008-10-23 | Perforation | 437.80 | 438.90 | 20 |
2008-10-23 | Perforation | 443.10 | 444.30 | 20 |
2008-10-23 | Perforation | 446.10 | 447.60 | 20 |
2008-10-23 | Perforation | 460.00 | 460.90 | 20 |
2008-10-23 | Perforation | 466.10 | 467.60 | 20 |
2008-10-23 | Perforation | 481.10 | 483.50 | 20 |
2008-10-23 | Perforation | 290.80 | 293.40 | 20 |
2008-10-23 | Perforation | 506.40 | 508.10 | 20 |
2008-11-09 | Fracture | 443.10 | 444.30 | 0 |
2008-11-09 | Fracture | 304.10 | 305.30 | 0 |
2008-11-09 | Fracture | 375.00 | 378.80 | 0 |
2008-11-09 | Fracture | 460.00 | 460.90 | 0 |
2008-11-09 | Fracture | 481.10 | 483.50 | 0 |
2008-11-09 | Fracture | 414.70 | 416.90 | 0 |
2008-11-09 | Fracture | 396.50 | 398.10 | 0 |
2008-11-09 | Fracture | 295.10 | 297.60 | 0 |
2008-11-09 | Fracture | 348.40 | 349.70 | 0 |
2008-10-23 | Perforation | 295.10 | 297.60 | 20 |
2008-11-09 | Fracture | 466.10 | 467.60 | 0 |
2008-11-09 | Fracture | 404.50 | 407.90 | 0 |
2008-11-09 | Fracture | 364.50 | 368.90 | 0 |
2008-11-09 | Fracture | 446.10 | 447.60 | 0 |
2008-11-09 | Fracture | 317.30 | 318.80 | 0 |
2008-11-09 | Fracture | 411.00 | 412.50 | 0 |
2008-11-09 | Fracture | 290.80 | 293.40 | 0 |
2008-11-09 | Fracture | 437.80 | 438.90 | 0 |
2008-11-09 | Fracture | 506.40 | 508.10 | 0 |
2008-11-09 | Fracture | 262.90 | 264.50 | 0 |
2008-10-23 | Perforation | 304.10 | 305.30 | 20 |
2008-10-23 | Perforation | 317.30 | 318.80 | 20 |
2008-10-23 | Perforation | 348.40 | 349.70 | 20 |
2008-10-23 | Perforation | 364.50 | 365.30 | 20 |
2008-10-23 | Perforation | 366.20 | 368.90 | 20 |
2008-10-23 | Perforation | 375.00 | 378.80 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7872 | 0.0 | 0.0 | 0.0 |
2011 | 7776 | 0.0 | 0.0 | 0.0 |
2012 | 8453 | 0.0 | 0.0 | 0.0 |
2013 | 8098 | 0.0 | 0.0 | 0.0 |
2014 | 8512 | 0.0 | 0.0 | 0.0 |
2015 | 8329 | 0.0 | 0.0 | 0.0 |
2016 | 8418 | 0.0 | 0.0 | 0.0 |
2017 | 8075 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
2020 | 255 | 0.0 | 0.0 | 0.0 |
For data sources see[5]