X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344220413022

Well Details

Well ID: 0344220413022
Loading map...
Location: 02/13-04-034-22W4/2
Location Alias: 02/13-04-34-22 W4M
Location Alias 2: 02/13-04-034-22 W4/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 22
Section: 04
County/Municipality: Kneehill County
Well Name: EMBER 102 ELNORA 13-4-34-22
Operator Name: Ember Resources Inc.
License Number: 0351059
License Date: 2006-02-03
License Status: Issued
Spud Date: 2006-02-18
Final Drill Date: 2006-02-20
Well Total Depth: 780.10 m
Surface Hole Latitude: 51.892883
Surface Hole Longitude: -113.070742

For data sources see[1][2]

Well History

Date Event
2006-02-03 Obtained License
2006-02-19 Surface Casing Operation Performed
2006-02-20 Finished Drilling
2006-02-20 Production Casing Operation Performed
2006-02-20 Well Mode changed to Drilled and Cased
2006-02-21 Rig Released
2006-02-28 Well Log Performed
2006-03-09 Perforation Treatment Performed - Jet Perforation
2006-03-09 Well Log Performed
2006-03-14 Perforation Treatment Performed - Jet Perforation
2006-03-14 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-03-14 Plug Back Performed
2006-03-14 Well Log Performed
2006-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-06 Perforation Treatment Performed - Jet Perforation
2006-05-06 Plug Back Performed
2006-05-06 Well Log Performed
2006-05-06 Well Mode changed to Abandoned Zone
2006-05-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-09 Perforation 761.00 766.00 17
2006-05-06 Perforation 439.00 439.30 17
2006-05-06 Perforation 431.50 432.20 17
2006-05-06 Perforation 411.40 412.00 17
2006-05-06 Perforation 381.70 384.60 17
2006-05-06 Perforation 375.20 377.80 17
2006-05-06 Perforation 374.30 374.70 17
2006-05-06 Perforation 349.40 349.70 17
2006-05-06 Perforation 347.30 347.60 17
2006-05-06 Perforation 336.80 338.00 17
2006-05-06 Perforation 334.90 335.20 17
2006-03-14 Packing Dev Cpd w/Res-Gyp Cem 756.00 759.00 0
2006-05-06 Perforation 333.60 333.90 17
2006-05-06 Perforation 329.70 330.00 17
2006-05-06 Perforation 326.40 327.20 17
2006-05-06 Perforation 322.70 323.00 17
2006-05-06 Perforation 317.00 320.00 17
2006-05-06 Perforation 307.30 307.60 17
2006-05-06 Perforation 292.40 292.70 17
2006-05-06 Perforation 279.60 279.90 17
2006-05-06 Perforation 266.30 268.10 17
2006-05-29 Fracture 266.30 489.30 0
2006-03-14 Perforation 751.00 752.50 17
2006-03-14 Perforation 677.00 678.00 17
2006-03-14 Perforation 577.00 578.00 17
2006-05-06 Packing Device Capped w/Cement 567.00 575.00 0
2006-05-06 Perforation 489.00 489.30 17
2006-05-06 Perforation 476.80 477.20 17
2006-05-06 Perforation 443.90 444.50 17

For data sources see[4]



References