If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344200514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.89546,"lon":-112.807539,"icon":""}]} |
Location: 00/14-05-034-20W4/0 | |
Location Alias: 00/14-05-34-20 W4M | |
Location Alias 2: 00/14-05-034-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 20 | |
Section: 05 | |
County/Municipality: Starland County | |
Well Name: EMBER ROWLEY 14-5-34-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411179 | |
License Date: 2009-06-26 | |
License Status: Amended | |
Spud Date: 2009-11-03 | |
Final Drill Date: 2009-11-07 | |
Well Total Depth: 700.00 m | |
Surface Hole Latitude: 51.895460 | |
Surface Hole Longitude: -112.807539 |
Date | Event |
---|---|
2009-06-26 | Obtained License |
2009-11-03 | Surface Casing Operation Performed |
2009-11-07 | Finished Drilling |
2009-11-07 | Production Casing Operation Performed |
2009-11-07 | Rig Released |
2009-11-07 | Well Mode changed to Drilled and Cased |
2009-11-15 | Well Log Performed |
2009-12-01 | Perforation Treatment Performed - Jet Perforation |
2009-12-18 | Perforation Treatment Performed - Fractured |
2009-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-12-20 | Well Mode changed to Testing |
2009-12-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-12-24 | Well Mode changed to Test Completed |
2010-01-07 | Perforation Treatment Performed - Jet Perforation |
2010-01-08 | Perforation Treatment Performed - Fractured |
2010-01-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-11 | Well Mode changed to Testing |
2010-01-17 | Well Began Production |
2010-01-17 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-01-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-12-01 | Perforation | 669.90 | 670.90 | 13 |
2009-12-18 | Fracture | 561.50 | 563.00 | 0 |
2009-12-18 | Fracture | 669.90 | 670.90 | 0 |
2010-01-07 | Perforation | 253.60 | 254.60 | 13 |
2010-01-07 | Perforation | 238.70 | 240.20 | 13 |
2010-01-07 | Perforation | 268.90 | 269.40 | 13 |
2010-01-07 | Perforation | 264.00 | 267.00 | 13 |
2010-01-07 | Perforation | 207.80 | 208.30 | 13 |
2010-01-07 | Perforation | 205.80 | 207.30 | 13 |
2010-01-07 | Perforation | 230.40 | 230.90 | 13 |
2010-01-07 | Perforation | 222.50 | 223.00 | 13 |
2009-12-01 | Perforation | 630.80 | 631.30 | 13 |
2010-01-07 | Perforation | 282.50 | 283.50 | 13 |
2010-01-07 | Perforation | 419.00 | 419.50 | 13 |
2010-01-07 | Perforation | 218.00 | 219.50 | 13 |
2010-01-07 | Perforation | 241.80 | 242.30 | 13 |
2010-01-07 | Perforation | 372.90 | 373.90 | 13 |
2010-01-07 | Perforation | 296.50 | 298.50 | 13 |
2010-01-07 | Perforation | 291.80 | 292.30 | 13 |
2010-01-07 | Perforation | 345.10 | 346.10 | 13 |
2010-01-08 | Fracture | 205.80 | 373.90 | 0 |
2010-01-08 | Fracture | 419.00 | 419.50 | 0 |
2009-12-01 | Perforation | 436.00 | 437.50 | 13 |
2009-12-01 | Perforation | 625.00 | 627.00 | 13 |
2009-12-01 | Perforation | 675.00 | 677.00 | 13 |
2009-12-01 | Perforation | 561.50 | 563.00 | 13 |
2009-12-18 | Fracture | 630.80 | 631.30 | 0 |
2009-12-18 | Fracture | 436.00 | 437.50 | 0 |
2009-12-18 | Fracture | 625.00 | 627.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4 | 0.0 | 0.0 | 0.0 |
2010 | 8164 | 0.0 | 0.0 | 0.0 |
2011 | 8681 | 0.0 | 0.0 | 0.0 |
2012 | 8671 | 0.0 | 0.0 | 0.0 |
2013 | 8541 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8626 | 0.0 | 0.0 | 0.0 |
2016 | 8739 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8727 | 0.0 | 0.0 | 0.0 |
2019 | 8713 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[5]