If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344200508003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.886707,"lon":-112.793167,"icon":""}]} |
Location: 00/08-05-034-20W4/3 | |
Location Alias: 00/08-05-34-20 W4M | |
Location Alias 2: 00/08-05-034-20 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 20 | |
Section: 05 | |
County/Municipality: Starland County | |
Well Name: EMBER ROWLEY 8-5-34-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411150 | |
License Date: 2009-06-25 | |
License Status: Issued | |
Spud Date: 2009-09-20 | |
Final Drill Date: 2009-09-21 | |
Well Total Depth: 698.00 m | |
Surface Hole Latitude: 51.886707 | |
Surface Hole Longitude: -112.793167 |
Date | Event |
---|---|
2009-06-25 | Obtained License |
2009-09-20 | Surface Casing Operation Performed |
2009-09-21 | Finished Drilling |
2009-09-21 | Well Log Performed |
2009-09-21 | Well Mode changed to Drilled and Cased |
2009-09-22 | Production Casing Operation Performed |
2009-09-22 | Rig Released |
2009-10-08 | Well Log Performed |
2009-11-11 | Perforation Treatment Performed - Jet Perforation |
2009-11-12 | Perforation Treatment Performed - Fractured |
2009-11-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-17 | Well Mode changed to Testing |
2009-12-12 | Well Structure changed to Commingled |
2010-01-29 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-11 | Perforation | 254.90 | 257.40 | 13 |
2009-11-11 | Perforation | 276.00 | 278.50 | 13 |
2009-11-11 | Perforation | 301.00 | 303.50 | 13 |
2009-11-11 | Perforation | 221.50 | 222.50 | 13 |
2009-11-11 | Perforation | 274.00 | 276.00 | 13 |
2009-11-11 | Perforation | 232.10 | 234.10 | 13 |
2009-11-11 | Perforation | 235.30 | 235.80 | 13 |
2009-11-11 | Perforation | 345.00 | 347.00 | 13 |
2009-11-11 | Perforation | 347.00 | 350.00 | 13 |
2009-11-11 | Perforation | 647.50 | 648.00 | 13 |
2009-11-11 | Perforation | 664.20 | 664.70 | 13 |
2009-11-11 | Perforation | 261.60 | 262.10 | 13 |
2009-11-11 | Perforation | 442.60 | 443.10 | 13 |
2009-11-11 | Perforation | 640.60 | 641.10 | 13 |
2009-11-11 | Perforation | 593.50 | 596.00 | 13 |
2009-11-11 | Perforation | 671.00 | 673.00 | 13 |
2009-11-11 | Perforation | 461.00 | 462.50 | 13 |
2009-11-11 | Perforation | 556.50 | 558.00 | 13 |
2009-11-11 | Perforation | 289.30 | 290.80 | 13 |
2009-11-11 | Perforation | 322.00 | 322.50 | 13 |
2009-11-11 | Perforation | 364.40 | 365.40 | 13 |
2009-11-11 | Perforation | 337.30 | 337.80 | 13 |
2009-11-11 | Perforation | 239.50 | 240.00 | 13 |
2009-11-11 | Perforation | 420.00 | 420.50 | 13 |
2009-11-11 | Perforation | 403.40 | 404.40 | 13 |
2009-11-11 | Perforation | 392.10 | 392.60 | 13 |
2009-11-12 | Fracture | 221.50 | 350.00 | 0 |
2009-11-12 | Fracture | 232.10 | 365.40 | 0 |
2009-11-12 | Fracture | 392.10 | 664.70 | 0 |
2009-11-12 | Fracture | 461.00 | 673.00 | 0 |
2009-11-11 | Perforation | 243.40 | 244.40 | 13 |
2009-11-11 | Perforation | 283.10 | 283.60 | 13 |
2009-11-11 | Perforation | 287.90 | 288.40 | 13 |
2009-11-11 | Perforation | 267.40 | 268.40 | 13 |
2009-11-11 | Perforation | 272.00 | 273.50 | 13 |
2009-11-11 | Perforation | 236.50 | 237.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]