If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344200102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.885246,"lon":-112.708577,"icon":""}]} |
Location: 00/02-01-034-20W4/0 | |
Location Alias: 00/02-01-34-20 W4M | |
Location Alias 2: 00/02-01-034-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 20 | |
Section: 01 | |
County/Municipality: Starland County | |
Well Name: EMBER ROWLEY 2-1-34-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0352520 | |
License Date: 2006-02-22 | |
License Status: Issued | |
Spud Date: 2006-03-08 | |
Final Drill Date: 2006-03-10 | |
Well Total Depth: 732.00 m | |
Surface Hole Latitude: 51.885246 | |
Surface Hole Longitude: -112.708577 |
Date | Event |
---|---|
2006-02-22 | Obtained License |
2006-03-09 | Surface Casing Operation Performed |
2006-03-10 | Finished Drilling |
2006-03-10 | Production Casing Operation Performed |
2006-03-10 | Rig Released |
2006-03-10 | Well Mode changed to Drilled and Cased |
2006-03-20 | Well Log Performed |
2006-03-27 | Perforation Treatment Performed - Jet Perforation |
2006-03-27 | Well Log Performed |
2006-04-02 | Well Began Production |
2006-04-02 | Well Fluid changed to Gas |
2006-04-02 | Well Mode changed to Flowing |
2006-10-02 | Perforation Treatment Performed - Jet Perforation |
2006-10-02 | Well Log Performed |
2006-10-15 | Perforation Treatment Performed - Jet Perforation |
2006-10-15 | Well Log Performed |
2006-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-26 | Plug Back Performed |
2006-10-26 | Well Fluid changed to Gas |
2006-10-26 | Well Log Performed |
2006-10-26 | Well Mode changed to Abandoned Zone |
2006-10-27 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-27 | Perforation | 605.50 | 608.00 | 17 |
2006-10-15 | Perforation | 332.60 | 333.00 | 14 |
2006-10-15 | Perforation | 326.50 | 327.50 | 14 |
2006-10-15 | Perforation | 316.20 | 316.50 | 14 |
2006-10-15 | Perforation | 314.70 | 315.00 | 14 |
2006-10-15 | Perforation | 279.60 | 280.30 | 14 |
2006-10-15 | Perforation | 273.60 | 274.00 | 14 |
2006-10-15 | Perforation | 258.70 | 259.00 | 14 |
2006-10-15 | Perforation | 251.80 | 252.70 | 14 |
2006-10-15 | Perforation | 246.20 | 246.90 | 14 |
2006-10-15 | Perforation | 243.80 | 244.70 | 14 |
2006-03-27 | Perforation | 603.50 | 604.50 | 17 |
2006-10-15 | Perforation | 227.10 | 228.20 | 14 |
2006-10-15 | Perforation | 224.80 | 225.10 | 14 |
2006-10-15 | Perforation | 218.00 | 220.00 | 14 |
2006-10-15 | Perforation | 213.00 | 213.30 | 14 |
2006-10-15 | Perforation | 211.80 | 212.40 | 14 |
2006-10-15 | Perforation | 187.10 | 189.00 | 14 |
2006-10-26 | Packing Device Capped w/Cement | 413.00 | 421.00 | 0 |
2006-10-27 | Fracture | 187.10 | 390.60 | 0 |
2006-10-02 | Perforation | 592.00 | 594.00 | 17 |
2006-10-02 | Perforation | 441.00 | 444.00 | 17 |
2006-10-02 | Perforation | 424.50 | 428.50 | 17 |
2006-10-15 | Perforation | 390.30 | 390.60 | 14 |
2006-10-15 | Perforation | 387.50 | 388.00 | 14 |
2006-10-15 | Perforation | 381.30 | 381.60 | 14 |
2006-10-15 | Perforation | 375.50 | 375.80 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 549 | 0.0 | 0.0 | 0.0 |
For data sources see[5]