If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344191908032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.929328,"lon":-112.679115,"icon":""}]} |
Location: 03/08-19-034-19W4/2 | |
Location Alias: 03/08-19-34-19 W4M | |
Location Alias 2: 03/08-19-034-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 19 | |
Section: 19 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER 103 RICH 8-19-34-19 | |
Operator Name: Ember Resources Inc. | |
License Number: 0332455 | |
License Date: 2005-06-08 | |
License Status: Amended | |
Spud Date: 2005-12-10 | |
Final Drill Date: 2005-12-12 | |
Well Total Depth: 711.00 m | |
Surface Hole Latitude: 51.929328 | |
Surface Hole Longitude: -112.679115 |
Date | Event |
---|---|
2005-06-08 | Obtained License |
2005-12-11 | Surface Casing Operation Performed |
2005-12-12 | Finished Drilling |
2005-12-12 | Well Mode changed to Drilled and Cased |
2005-12-13 | Production Casing Operation Performed |
2005-12-13 | Rig Released |
2005-12-21 | Well Log Performed |
2006-01-29 | Perforation Treatment Performed - Jet Perforation |
2006-01-29 | Well Log Performed |
2006-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-07 | Perforation Treatment Performed - Jet Perforation |
2006-02-07 | Well Log Performed |
2006-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-12 | Perforation Treatment Performed - Jet Perforation |
2006-02-12 | Well Log Performed |
2006-03-04 | Well Log Performed |
2006-03-07 | Perforation Treatment Performed - Jet Perforation |
2006-03-07 | Well Log Performed |
2006-03-09 | Perforation Treatment Performed - Fractured |
2006-07-12 | Well Began Production |
2006-07-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-07-12 | Well Mode changed to Flowing |
2017-03-31 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-31 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-29 | Perforation | 637.00 | 642.00 | 17 |
2006-03-07 | Perforation | 292.00 | 294.00 | 13 |
2006-03-07 | Perforation | 260.00 | 262.00 | 13 |
2006-03-07 | Perforation | 257.00 | 258.00 | 13 |
2006-03-07 | Perforation | 244.50 | 245.50 | 13 |
2006-03-07 | Perforation | 240.00 | 241.00 | 13 |
2006-03-07 | Perforation | 231.00 | 232.00 | 13 |
2006-03-07 | Perforation | 227.70 | 228.70 | 13 |
2006-03-07 | Perforation | 211.00 | 212.00 | 13 |
2006-03-07 | Perforation | 206.00 | 209.00 | 13 |
2006-03-07 | Perforation | 200.50 | 201.50 | 13 |
2006-02-07 | Packing Device Capped w/Cement | 627.00 | 635.00 | 0 |
2006-03-07 | Perforation | 176.00 | 177.00 | 13 |
2006-03-09 | Fracture | 358.50 | 359.50 | 0 |
2006-03-09 | Fracture | 355.00 | 356.00 | 0 |
2006-03-09 | Fracture | 313.00 | 314.00 | 0 |
2006-03-09 | Fracture | 307.00 | 308.00 | 0 |
2006-03-09 | Fracture | 292.00 | 294.00 | 0 |
2006-02-07 | Perforation | 617.00 | 620.50 | 17 |
2006-02-12 | Packing Device Capped w/Cement | 602.00 | 610.00 | 0 |
2006-02-12 | Perforation | 441.00 | 446.00 | 17 |
2006-03-07 | Perforation | 358.50 | 359.50 | 13 |
2006-03-07 | Perforation | 355.00 | 356.00 | 13 |
2006-03-07 | Perforation | 313.00 | 314.00 | 13 |
2006-03-07 | Perforation | 307.00 | 308.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 4174 | 0.0 | 0.0 | 0.0 |
2007 | 8682 | 0.0 | 0.0 | 0.0 |
2008 | 8688 | 0.0 | 0.0 | 0.0 |
2009 | 8700 | 0.0 | 0.0 | 0.0 |
2010 | 8682 | 0.0 | 0.0 | 0.0 |
2011 | 8712 | 0.0 | 0.0 | 0.0 |
2012 | 8697 | 0.0 | 0.0 | 0.0 |
2013 | 8691 | 0.0 | 0.0 | 0.0 |
2014 | 8382 | 0.0 | 0.0 | 0.0 |
2015 | 5939 | 0.0 | 0.0 | 0.0 |
2016 | 6275 | 0.0 | 0.0 | 0.0 |
2017 | 8678 | 0.0 | 0.0 | 0.0 |
2018 | 8628 | 0.0 | 0.0 | 0.0 |
2019 | 8532 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]