If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344093510020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.969494,"lon":-111.178603,"icon":""}]} |
Location: 02/10-35-034-09W4/0 | |
Location Alias: 02/10-35-34-09 W4M | |
Location Alias 2: 02/10-35-034-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 09 | |
Section: 35 | |
County/Municipality: Special Areas No. 4 | |
Well Name: KARVE 102 HZ PROVOST 10-35-34-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0488878 | |
License Date: 2018-04-20 | |
License Status: Issued | |
Spud Date: 2018-06-23 | |
Final Drill Date: 2018-06-25 | |
Well Total Depth: 1703.00 m | |
Surface Hole Latitude: 51.969494 | |
Surface Hole Longitude: -111.178603 |
Date | Event |
---|---|
2018-04-20 | Obtained License |
2018-06-24 | Direction Drilling Operation Performed - Deviate |
2018-06-24 | Surface Casing Operation Performed |
2018-06-25 | Direction Drilling Operation Performed - Horizontal |
2018-06-25 | Finished Drilling |
2018-06-25 | Well Log Performed |
2018-06-25 | Well Mode changed to Drilled and Cased |
2018-06-26 | Production Casing Operation Performed |
2018-06-26 | Rig Released |
2018-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-07-10 | Well Began Production |
2018-07-10 | Well Fluid changed to Crude Oil |
2018-07-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-06-23 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-06-24 | 635.60 | Deviate (5 - 79 degrees) |
2018-06-25 | 1024.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-07-05 | Multi-Stage Fracture | 1667.10 | 1667.20 | 0 |
2018-07-05 | Multi-Stage Fracture | 1408.50 | 1408.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 1373.50 | 1373.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 1338.50 | 1338.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 1303.50 | 1303.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 1268.60 | 1268.70 | 0 |
2018-07-05 | Multi-Stage Fracture | 1233.40 | 1233.50 | 0 |
2018-07-05 | Multi-Stage Fracture | 1198.30 | 1198.40 | 0 |
2018-07-05 | Multi-Stage Fracture | 1163.20 | 1163.30 | 0 |
2018-07-05 | Multi-Stage Fracture | 1128.20 | 1128.30 | 0 |
2018-07-05 | Multi-Stage Fracture | 1093.30 | 1093.40 | 0 |
2018-07-05 | Multi-Stage Fracture | 1643.50 | 1643.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 1058.50 | 1058.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 1619.90 | 1620.00 | 0 |
2018-07-05 | Multi-Stage Fracture | 1584.70 | 1584.80 | 0 |
2018-07-05 | Multi-Stage Fracture | 1561.20 | 1561.30 | 0 |
2018-07-05 | Multi-Stage Fracture | 1538.10 | 1538.20 | 0 |
2018-07-05 | Multi-Stage Fracture | 1514.40 | 1514.50 | 0 |
2018-07-05 | Multi-Stage Fracture | 1479.10 | 1479.20 | 0 |
2018-07-05 | Multi-Stage Fracture | 1443.90 | 1444.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-07-05 | 2018-07-05 | 895 | 698 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 72.1438 | N/A | |||
16/30 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 26.9979 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.012 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.012 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.012 | N/A | ||||
SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0686 | N/A | |
Sodium chloride | 7647-14-5 | 100 | 0.0686 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.1074 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1074 | N/A | ||||
SBX-2 (Crosslinker) | Step Energy Services | Crosslinker | Proprietary | Trade Secret | 100 | 0.1087 | N/A | |
Water | 7732-18-5 | 100 | 0.1087 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0496 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0496 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0496 | N/A | ||||
SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.3755 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.3755 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.136 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.136 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.136 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.136 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.136 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.136 | N/A | ||||
Water | 7732-18-5 | 100 | 0.136 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-06-27 | 2018-06-27 | Municipal Water | 294 |
2018-06-27 | 2018-06-27 | Municipal Water | 28 |
2018-06-27 | 2018-06-27 | Central Water Distribution Facility | 55 |
2018-06-27 | 2018-06-27 | Central Water Distribution Facility | 175 |
2018-06-27 | 2018-06-27 | Central Water Distribution Facility | 215 |
2018-06-27 | 2018-06-27 | Central Water Distribution Facility | 42 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4094 | 0.0 | 0.0 | 0.0 |
2019 | 8449 | 0.0 | 0.0 | 0.0 |
2020 | 2152 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-06-26 | No Incident Encountered | 0.00 | 0.00 |
2018-07-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]