X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344092308020

Well Details

Well ID: 0344092308020
Loading map...
Location: 02/08-23-034-09W4/0
Location Alias: 02/08-23-34-09 W4M
Location Alias 2: 02/08-23-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 23
County/Municipality: Special Areas No. 4
Well Name: TAC 12-14 HZ 102 PROVOST 8-23-34-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0484593
License Date: 2017-07-19
License Status: Amended
Spud Date: 2018-01-07
Final Drill Date: 2018-01-30
Well Total Depth: 2378.00 m
Surface Hole Latitude: 51.920767
Surface Hole Longitude: -111.183764

For data sources see[1][2]

Well History

Date Event
2017-07-19 Obtained License
2018-01-07 Surface Casing Operation Performed
2018-01-28 Direction Drilling Operation Performed - Deviate
2018-01-29 Direction Drilling Operation Performed - Horizontal
2018-01-30 Finished Drilling
2018-01-30 Production Casing Operation Performed
2018-01-30 Well Log Performed
2018-01-30 Well Mode changed to Drilled and Cased
2018-01-31 Rig Released
2018-02-07 Perforation Treatment Performed - Jet Perforation
2018-02-23 Perforation Treatment Performed - Fractured
2018-02-24 Perforation Treatment Performed - Fractured
2018-03-13 Well Began Production
2018-03-13 Well Fluid changed to Crude Oil
2018-03-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-07 Predator Drilling Inc. 8 N/A Set Surface
2018-01-28 Precision Drilling Corporation 157 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-28 219.20 Deviate (5 - 79 degrees)
2018-01-29 998.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-07 Perforation 2356.00 2356.50 20
2018-02-07 Perforation 1830.00 1830.50 20
2018-02-07 Perforation 1774.00 1774.50 20
2018-02-07 Perforation 1714.00 1714.50 20
2018-02-07 Perforation 1657.00 1657.50 20
2018-02-07 Perforation 1612.00 1612.50 20
2018-02-07 Perforation 1555.00 1555.50 20
2018-02-07 Perforation 1498.00 1498.50 20
2018-02-07 Perforation 1442.00 1442.50 20
2018-02-07 Perforation 1384.00 1384.50 20
2018-02-07 Perforation 1316.00 1316.50 20
2018-02-07 Perforation 2330.00 2330.50 20
2018-02-07 Perforation 1248.00 1248.50 20
2018-02-07 Perforation 1191.00 1191.50 20
2018-02-07 Perforation 1112.00 1112.50 20
2018-02-23 Fracture 2356.00 2356.50 0
2018-02-23 Fracture 2330.00 2330.50 0
2018-02-23 Fracture 2251.00 2251.50 0
2018-02-23 Fracture 2217.00 2217.50 0
2018-02-23 Fracture 2149.00 2149.50 0
2018-02-23 Fracture 2103.00 2103.50 0
2018-02-24 Fracture 2057.00 2057.50 0
2018-02-07 Perforation 2251.00 2251.50 20
2018-02-24 Fracture 1955.00 1955.50 0
2018-02-24 Fracture 1887.00 1887.50 0
2018-02-24 Fracture 1830.00 1830.50 0
2018-02-24 Fracture 1774.00 1774.50 0
2018-02-24 Fracture 1714.00 1714.50 0
2018-02-24 Fracture 1657.00 1657.50 0
2018-02-24 Fracture 1612.00 1612.50 0
2018-02-24 Fracture 1555.00 1555.50 0
2018-02-24 Fracture 1498.00 1498.50 0
2018-02-24 Fracture 1442.00 1442.50 0
2018-02-07 Perforation 2217.00 2217.50 20
2018-02-24 Fracture 1384.00 1384.50 0
2018-02-24 Fracture 1316.00 1316.50 0
2018-02-24 Fracture 1248.00 1248.50 0
2018-02-24 Fracture 1191.00 1191.50 0
2018-02-24 Fracture 1112.00 1112.50 0
2018-02-07 Perforation 2149.00 2149.50 20
2018-02-07 Perforation 2103.00 2103.50 20
2018-02-07 Perforation 2057.00 2057.50 20
2018-02-07 Perforation 1955.00 1955.50 20
2018-02-07 Perforation 1887.00 1887.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-23 2018-02-24 891 742 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 82.1681 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 17.1944 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0676 N/A
water 7732-18-5 100 0.0676 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0167 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1643 N/A
Ethylene glycol 107-21-1 100 0.1643 N/A
Potassium Carbonate 584-08-7 100 0.1643 N/A
Potassium Hydroxide 1310-58-3 100 0.1643 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0212 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2964 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0709 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0709 N/A
water 7732-18-5 100 0.0709 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-24 2018-02-24 Oilfield Produced Water 742

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6660 0.0 0.0 0.0
2019 8524 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-29 No Incident Encountered 0.00 0.00
2018-02-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References