X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344083603030

Well Details

Well ID: 0344083603030
Loading map...
Location: 03/03-36-034-08W4/0
Location Alias: 03/03-36-34-08 W4M
Location Alias 2: 03/03-36-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 36
County/Municipality: Special Areas No. 4
Well Name: ACL ET AL 3C PROVOST 3-36-34-8
Operator Name: Battle River Energy Ltd.
License Number: 0156307
License Date: 1993-02-05
License Status: Suspension
Spud Date: 1993-02-06
Final Drill Date: 1993-02-09
Well Total Depth: 1060.00 m
Surface Hole Latitude: 51.958030
Surface Hole Longitude: -111.013892

For data sources see[1][2]

Well History

Date Event
1993-02-05 Obtained License
1993-02-07 Surface Casing Operation Performed
1993-02-09 Finished Drilling
1993-02-09 Well Mode changed to Drilled and Cased
1993-02-10 Production Casing Operation Performed
1993-02-10 Rig Released
1993-02-10 Well Log Performed
1993-03-02 Well Log Performed
1993-03-11 Perforation Treatment Performed - Jet Perforation
1993-03-11 Well Log Performed
1993-04-01 Well Began Production
1993-04-01 Well Fluid changed to Crude Oil
1993-04-01 Well Mode changed to Pumping
1993-09-11 Perforation Treatment Performed - Cement Squeeze
1993-09-11 Well Began Injection
1993-09-11 Well Fluid changed to Water
1993-09-11 Well Type changed to Disposal
1993-09-13 Perforation Treatment Performed - Jet Perforation
1993-09-13 Well Log Performed
1993-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-23 Perforation Treatment Performed - Jet Perforation
1998-09-23 Well Log Performed
1999-08-17 Perforation Treatment Performed - Chemical Squeeze
1999-08-19 Perforation Treatment Performed - Chemical Squeeze
2000-01-20 Perforation Treatment Performed - Fractured
2000-01-20 Well Log Performed
2000-01-23 Well Log Performed
2006-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-10-22 Well Log Performed
2016-04-19 Well Fluid changed to Water
2016-04-19 Well Mode changed to Suspended
2016-04-19 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-11 Perforation 1023.50 1025.00 13
1999-08-19 Chemical Squeeze 1027.00 1035.00 0
2000-01-20 Fracture 1027.00 1035.00 0
2006-08-03 Acid Treatment 1027.00 1035.00 0
2008-01-18 Acid Treatment 1027.00 1035.00 0
1993-09-11 Cement Squeeze 1023.50 1025.00 0
1993-09-13 Perforation 1028.00 1035.00 18
1993-10-07 Acid Treatment 1028.00 1035.00 0
1995-11-13 Acid Treatment 1028.00 1035.00 0
1996-01-24 Acid Treatment 1028.00 1035.00 0
1996-05-25 Acid Treatment 1028.00 1035.00 0
1998-09-23 Perforation 1027.00 1035.00 18
1999-08-17 Chemical Squeeze 1027.00 1035.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2607 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

References