X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344083007020

Well Details

Well ID: 0344083007020
Loading map...
Location: 02/07-30-034-08W4/0
Location Alias: 02/07-30-34-08 W4M
Location Alias 2: 02/07-30-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 30
County/Municipality: Special Areas No. 4
Well Name: TAC 12-30 HZ 102 PROVOST 7-30-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0486494
License Date: 2017-11-23
License Status: Issued
Spud Date: 2017-12-31
Final Drill Date: 2018-01-20
Well Total Depth: 1950.00 m
Surface Hole Latitude: 51.950348
Surface Hole Longitude: -111.134209

For data sources see[1][2]

Well History

Date Event
2017-11-23 Obtained License
2017-12-31 Surface Casing Operation Performed
2018-01-19 Direction Drilling Operation Performed - Deviate
2018-01-19 Direction Drilling Operation Performed - Horizontal
2018-01-20 Finished Drilling
2018-01-20 Well Log Performed
2018-01-20 Well Mode changed to Drilled and Cased
2018-01-21 Production Casing Operation Performed
2018-01-21 Rig Released
2018-01-22 Well Log Performed
2018-01-23 Perforation Treatment Performed - Jet Perforation
2018-01-27 Perforation Treatment Performed - Fractured
2018-02-09 Well Began Production
2018-02-09 Well Fluid changed to Crude Oil
2018-02-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-19 Tempco Drilling Company Inc. 8 N/A Drill To LD
2017-12-30 Predator Drilling Inc. 8 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-19 217.70 Deviate (5 - 79 degrees)
2018-01-19 1009.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-23 Perforation 1930.00 1930.50 20
2018-01-23 Perforation 1626.00 1626.50 20
2018-01-23 Perforation 1579.00 1579.50 20
2018-01-23 Perforation 1460.00 1460.50 20
2018-01-23 Perforation 1425.00 1425.50 20
2018-01-23 Perforation 1391.00 1391.50 20
2018-01-23 Perforation 1356.00 1356.50 20
2018-01-23 Perforation 1321.00 1321.50 20
2018-01-23 Perforation 1286.00 1286.50 20
2018-01-23 Perforation 1251.00 1251.50 20
2018-01-23 Perforation 1216.00 1216.50 20
2018-01-23 Perforation 1896.00 1896.50 20
2018-01-23 Perforation 1183.00 1183.50 20
2018-01-23 Perforation 1147.00 1147.50 20
2018-01-23 Perforation 1112.00 1112.50 20
2018-01-23 Perforation 1078.00 1078.50 20
2018-01-23 Perforation 1041.00 1041.50 20
2018-01-27 Fracture 1930.00 1930.50 0
2018-01-27 Fracture 1896.00 1896.50 0
2018-01-27 Fracture 1859.00 1859.50 0
2018-01-27 Fracture 1824.00 1824.50 0
2018-01-27 Fracture 1789.00 1789.50 0
2018-01-23 Perforation 1859.00 1859.50 20
2018-01-27 Fracture 1754.00 1754.50 0
2018-01-27 Fracture 1719.00 1719.50 0
2018-01-27 Fracture 1684.00 1684.50 0
2018-01-27 Fracture 1649.00 1649.50 0
2018-01-27 Fracture 1626.00 1626.50 0
2018-01-27 Fracture 1425.00 1425.50 0
2018-01-27 Fracture 1391.00 1391.50 0
2018-01-27 Fracture 1356.00 1356.50 0
2018-01-27 Fracture 1321.00 1321.50 0
2018-01-27 Fracture 1286.00 1286.50 0
2018-01-23 Perforation 1824.00 1824.50 20
2018-01-27 Fracture 1251.00 1251.50 0
2018-01-27 Fracture 1216.00 1216.50 0
2018-01-27 Fracture 1183.00 1183.50 0
2018-01-27 Fracture 1147.00 1147.50 0
2018-01-27 Fracture 1112.00 1112.50 0
2018-01-27 Fracture 1078.00 1078.50 0
2018-01-27 Fracture 1041.00 1041.50 0
2018-01-23 Perforation 1789.00 1789.50 20
2018-01-23 Perforation 1754.00 1754.50 20
2018-01-23 Perforation 1719.00 1719.50 20
2018-01-23 Perforation 1684.00 1684.50 20
2018-01-23 Perforation 1649.00 1649.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-27 2018-01-27 899 710 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.5386 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 19.9007 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0516 N/A
water 7732-18-5 100 0.0516 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0309 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1313 N/A
Ethylene glycol 107-21-1 100 0.1313 N/A
Potassium Carbonate 584-08-7 100 0.1313 N/A
Potassium Hydroxide 1310-58-3 100 0.1313 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2796 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.067 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.067 N/A
water 7732-18-5 100 0.067 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-27 2018-01-27 Oilfield Produced Water 423
2018-01-27 2018-01-27 Oilfield Produced Water 288

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7140 0.0 0.0 0.0
2019 8644 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-21 No Incident Encountered 0.00 0.00
2018-01-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References