X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344081906000

Well Details

Well ID: 0344081906000
Loading map...
Location: 00/06-19-034-08W4/0
Location Alias: 00/06-19-34-08 W4M
Location Alias 2: 00/06-19-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 19
County/Municipality: Special Areas No. 4
Well Name: TAC 4-29 HZ PROVOST 6-19-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0496996
License Date: 2019-12-18
License Status: Issued
Spud Date: 2020-01-08
Final Drill Date: 2020-02-21
Well Total Depth: 2458.00 m
Surface Hole Latitude: 51.942204
Surface Hole Longitude: -111.112268

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-08 Hertz & Paluck Energy Services Inc. 1 Set Surface
2020-02-19 Tempco Drilling Company Inc. 8 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-19 203.50 Deviate (5 - 79 degrees)
2020-02-20 989.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-25 Perforation 2438.00 2438.50 20
2020-02-25 Perforation 1862.00 1862.50 20
2020-02-25 Perforation 1810.00 1810.50 20
2020-02-25 Perforation 1755.00 1755.50 20
2020-02-25 Perforation 1706.00 1706.50 20
2020-02-25 Perforation 1656.00 1656.50 20
2020-02-25 Perforation 1596.00 1596.50 20
2020-02-25 Perforation 1546.00 1546.50 20
2020-02-25 Perforation 1486.00 1486.50 20
2020-02-25 Perforation 1435.00 1435.50 20
2020-02-25 Perforation 1380.00 1380.50 20
2020-02-25 Perforation 2385.00 2385.50 20
2020-02-25 Perforation 1321.00 1321.50 20
2020-02-25 Perforation 1266.00 1266.50 20
2020-02-25 Perforation 1215.00 1215.50 20
2020-02-25 Perforation 1160.00 1160.50 20
2020-02-25 Perforation 1105.00 1105.50 20
2020-02-25 Perforation 1050.00 1050.50 20
2020-02-28 Fracture 2438.00 2438.50 0
2020-02-28 Fracture 2385.00 2385.50 0
2020-02-28 Fracture 2315.00 2315.50 0
2020-02-28 Fracture 2257.00 2257.50 0
2020-02-25 Perforation 2315.00 2315.50 20
2020-02-28 Fracture 2216.00 2216.50 0
2020-02-28 Fracture 2078.00 2078.50 0
2020-02-28 Fracture 2027.00 2027.50 0
2020-02-28 Fracture 1972.00 1972.50 0
2020-02-28 Fracture 1917.00 1917.50 0
2020-02-28 Fracture 1862.00 1862.50 0
2020-02-28 Fracture 1810.00 1810.50 0
2020-02-28 Fracture 1755.00 1755.50 0
2020-02-28 Fracture 1706.00 1706.50 0
2020-02-28 Fracture 1656.00 1656.50 0
2020-02-25 Perforation 2257.00 2257.50 20
2020-02-28 Fracture 1596.00 1596.50 0
2020-02-28 Fracture 1546.00 1546.50 0
2020-02-28 Fracture 1486.00 1486.50 0
2020-02-28 Fracture 1435.00 1435.50 0
2020-02-28 Fracture 1380.00 1380.50 0
2020-02-28 Fracture 1321.00 1321.50 0
2020-02-28 Fracture 1266.00 1266.50 0
2020-02-28 Fracture 1215.00 1215.50 0
2020-02-28 Fracture 1160.00 1160.50 0
2020-02-28 Fracture 1105.00 1105.50 0
2020-02-25 Perforation 2216.00 2216.50 20
2020-02-28 Fracture 1050.00 1050.50 0
2020-02-25 Perforation 2078.00 2078.50 20
2020-02-25 Perforation 2027.00 2027.50 20
2020-02-25 Perforation 1972.00 1972.50 20
2020-02-25 Perforation 1917.00 1917.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 619 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-21 No Incident Encountered 0.00 0.00
2020-02-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References