X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344081513000

Well Details

Well ID: 0344081513000
Loading map...
Location: 00/13-15-034-08W4/0
Location Alias: 00/13-15-34-08 W4M
Location Alias 2: 00/13-15-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 15
County/Municipality: Special Areas No. 4
Well Name: TAC 6-22 HZ PROVOST 13-15-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0497283
License Date: 2020-01-07
License Status: Issued
Spud Date: 2020-01-22
Final Drill Date: 2020-01-25
Well Total Depth: 1904.00 m
Surface Hole Latitude: 51.931986
Surface Hole Longitude: -111.058059

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-22 Hertz & Paluck Energy Services Inc. 1 Set Surface
2020-01-23 Bonanza Drilling Inc. 3 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-23 221.50 Deviate (5 - 79 degrees)
2020-01-24 996.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-31 Perforation 1887.00 1887.50 20
2020-01-31 Perforation 1398.00 1398.50 20
2020-01-31 Perforation 1340.00 1340.50 20
2020-01-31 Perforation 1291.00 1291.50 20
2020-01-31 Perforation 1233.00 1233.50 20
2020-01-31 Perforation 1166.00 1166.50 20
2020-01-31 Perforation 1108.00 1108.50 20
2020-01-31 Perforation 1050.00 1050.50 20
2020-02-05 Fracture 1887.00 1887.50 0
2020-02-05 Fracture 1818.00 1818.50 0
2020-02-05 Fracture 1769.00 1769.50 0
2020-01-31 Perforation 1818.00 1818.50 20
2020-02-05 Fracture 1722.00 1722.50 0
2020-02-05 Fracture 1665.00 1665.50 0
2020-02-05 Fracture 1618.00 1618.50 0
2020-02-05 Fracture 1563.00 1563.50 0
2020-02-05 Fracture 1505.00 1505.50 0
2020-02-05 Fracture 1453.00 1453.50 0
2020-02-05 Fracture 1398.00 1398.50 0
2020-02-05 Fracture 1340.00 1340.50 0
2020-02-05 Fracture 1291.00 1291.50 0
2020-02-05 Fracture 1233.00 1233.50 0
2020-01-31 Perforation 1769.00 1769.50 20
2020-02-05 Fracture 1166.00 1166.50 0
2020-02-05 Fracture 1108.00 1108.50 0
2020-02-05 Fracture 1050.00 1050.50 0
2020-01-31 Perforation 1722.00 1722.50 20
2020-01-31 Perforation 1665.00 1665.50 20
2020-01-31 Perforation 1618.00 1618.50 20
2020-01-31 Perforation 1563.00 1563.50 20
2020-01-31 Perforation 1505.00 1505.50 20
2020-01-31 Perforation 1453.00 1453.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1115 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-25 No Incident Encountered 0.00 0.00
2020-02-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References