X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344081012000

Well Details

Well ID: 0344081012000
Loading map...
Location: 00/12-10-034-08W4/0
Location Alias: 00/12-10-34-08 W4M
Location Alias 2: 00/12-10-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 10
County/Municipality: Special Areas No. 4
Well Name: PETROREP ET AL PROVOST 12-10-34-8
Operator Name: Bonavista Energy Corporation
License Number: 0047697
License Date: 1973-10-17
License Status: RecCertified
Spud Date: 1973-10-18
Final Drill Date: 1973-10-20
Well Total Depth: 892.50 m
Surface Hole Latitude: 51.907029
Surface Hole Longitude: -111.062399

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-10-17 Obtained License
1973-10-20 Finished Drilling
1973-10-20 Well Mode changed to Drilled and Cased
1973-10-21 Production Casing Operation Performed
1973-10-21 Well Log Performed
1973-11-01 Perforation Treatment Performed - Jet Perforation
1973-11-14 Perforation Treatment Performed - Fractured
1974-05-02 Well Began Production
1974-05-02 Well Fluid changed to Crude Oil
1974-05-02 Well Mode changed to Pumping
1976-03-22 Well Began Injection
1976-03-22 Well Fluid changed to Water
1976-03-22 Well Type changed to Injection
1990-12-01 Well Fluid changed to Water
1990-12-01 Well Mode changed to Suspended
1990-12-01 Well Type changed to Injection
1994-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-13 Plug Back Performed
1994-10-13 Well Fluid changed to Water
1994-10-13 Well Mode changed to Abandoned
1994-10-13 Well Type changed to Injection
1994-10-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-11-01 Perforation 878.40 881.50 13
1973-11-14 Fracture 878.40 881.50 0
1994-10-13 Packing Device Capped w/Cement 855.80 863.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 5140 0.0 0.0 0.0
1975 7485 0.0 0.0 0.0
1976 1238 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References