X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344063515000

Well Details

Well ID: 0344063515000
Loading map...
Location: 00/15-35-034-06W4/0
Location Alias: 00/15-35-34-06 W4M
Location Alias 2: 00/15-35-034-06 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 06
Section: 35
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND PROVOST 15-35-34-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0448961
License Date: 2012-10-03
License Status: Issued
Spud Date: 2013-07-27
Final Drill Date: 2013-07-30
Well Total Depth: 1935.00 m
Surface Hole Latitude: 51.956278
Surface Hole Longitude: -110.746590

For data sources see[1][2]

Well History

Date Event
2012-10-03 Obtained License
2013-07-27 Surface Casing Operation Performed
2013-07-28 Direction Drilling Operation Performed - Deviate
2013-07-29 Direction Drilling Operation Performed - Horizontal
2013-07-30 Finished Drilling
2013-07-30 Well Mode changed to Drilled and Cased
2013-07-31 Well Log Performed
2013-08-01 Production Casing Operation Performed
2013-08-01 Rig Released
2013-08-08 Perforation Treatment Performed - Open-Hole Completion
2013-08-09 Well Log Performed
2013-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-14 Well Began Production
2013-09-14 Well Fluid changed to Crude Oil
2013-09-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-07-27 Precision Drilling Corporation 193 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-07-28 598.20 Deviate (5 - 79 degrees)
2013-07-29 928.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-08-08 Open Hole/Barefoot Completion 1928.50 1935.00 0
2013-08-22 Multi-Stage Fracture 1505.80 1505.90 0
2013-08-22 Multi-Stage Fracture 1461.10 1461.20 0
2013-08-27 Multi-Stage Fracture 1419.20 1419.30 0
2013-08-27 Multi-Stage Fracture 1377.00 1377.10 0
2013-08-27 Multi-Stage Fracture 1334.60 1334.70 0
2013-08-30 Multi-Stage Fracture 1292.30 1292.40 0
2013-08-30 Multi-Stage Fracture 1250.30 1250.40 0
2013-08-30 Multi-Stage Fracture 1195.00 1195.10 0
2013-08-30 Multi-Stage Fracture 1153.10 1153.20 0
2013-08-30 Multi-Stage Fracture 1111.30 1111.40 0
2013-08-18 Multi-Stage Fracture 1910.00 1910.10 0
2013-08-30 Multi-Stage Fracture 1069.70 1069.80 0
2013-08-30 Multi-Stage Fracture 1027.40 1027.50 0
2013-08-30 Multi-Stage Fracture 985.70 985.80 0
2013-08-22 Multi-Stage Fracture 1780.20 1780.30 0
2013-08-22 Multi-Stage Fracture 1751.70 1751.80 0
2013-08-22 Multi-Stage Fracture 1709.50 1709.60 0
2013-08-22 Multi-Stage Fracture 1667.40 1667.50 0
2013-08-22 Multi-Stage Fracture 1625.60 1625.70 0
2013-08-22 Multi-Stage Fracture 1586.90 1587.00 0
2013-08-22 Multi-Stage Fracture 1544.60 1544.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-18 2013-08-30 818 0 N/A
2 2013-08-30 2013-08-30 818 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 55.0689 N/A
ClearFRAC XT N2; N002 Schlumberger Crystalline silica 14808-60-7 100 26.304 N/A
ClearFRAC XT N2; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0021 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0231 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.217 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0003 N/A
Nitrogen; liquid form 7727-37-9 100 21.8846 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0014 N/A
Propan-2-ol 67-63-0 100 0.2124 N/A
Sodium chloride 7647-14-5 100 0.0298 N/A
Sodium chloroacetate 3926-62-3 100 0.0028 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0096 N/A
2 ClearFRAC XT N2; N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0066 N/A
Butan-1-ol 71-36-3 100 0.0026 N/A
Ethane-1;2-diol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.0022 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0103 N/A
Undecanol; branched and linear (impurity) 128973-77-3 100 0.0006 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-10 2013-08-21 Municipal Water 88
2013-08-11 2013-08-11 Municipal Water 837
2013-08-12 2013-08-29 Municipal Water 212

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2484 0.0 0.0 0.0
2014 8283 0.0 0.0 0.0
2015 8170 0.0 0.0 0.0
2016 8282 0.0 0.0 0.0
2017 8336 0.0 0.0 0.0
2018 3651 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-01 No Incident Encountered 0.00 0.00
2013-08-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References