X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344041402000

Well Details

Well ID: 0344041402000
Loading map...
Location: 00/02-14-034-04W4/0
Location Alias: 00/02-14-34-04 W4M
Location Alias 2: 00/02-14-034-04 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 04
Section: 14
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND 2-23 H PROVOST 2-14-34-4
Operator Name: Karve Energy Inc.
License Number: 0483610
License Date: 2017-05-18
License Status: Issued
Spud Date: 2017-07-10
Final Drill Date: 2017-07-12
Well Total Depth: 2252.00 m
Surface Hole Latitude: 51.926975
Surface Hole Longitude: -110.464068

For data sources see[1][2]

Well History

Date Event
2017-05-18 Obtained License
2017-07-11 Direction Drilling Operation Performed - Deviate
2017-07-11 Surface Casing Operation Performed
2017-07-12 Direction Drilling Operation Performed - Horizontal
2017-07-12 Finished Drilling
2017-07-12 Well Log Performed
2017-07-12 Well Mode changed to Drilled and Cased
2017-07-13 Production Casing Operation Performed
2017-07-14 Rig Released
2017-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-29 Well Began Production
2017-09-29 Well Fluid changed to Crude Oil
2017-09-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-10 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-11 411.20 Deviate (5 - 79 degrees)
2017-07-12 831.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-02 Multi-Stage Fracture 2190.50 2190.60 0
2017-08-02 Multi-Stage Fracture 1926.90 1927.00 0
2017-08-02 Multi-Stage Fracture 1897.70 1897.80 0
2017-08-02 Multi-Stage Fracture 1868.50 1868.60 0
2017-08-02 Multi-Stage Fracture 1840.70 1840.80 0
2017-08-02 Multi-Stage Fracture 1812.00 1812.10 0
2017-08-02 Multi-Stage Fracture 1782.70 1782.80 0
2017-08-02 Multi-Stage Fracture 1753.40 1753.50 0
2017-08-02 Multi-Stage Fracture 1724.20 1724.30 0
2017-08-03 Multi-Stage Fracture 1694.90 1695.00 0
2017-08-03 Multi-Stage Fracture 1665.60 1665.70 0
2017-08-02 Multi-Stage Fracture 2161.20 2161.30 0
2017-08-03 Multi-Stage Fracture 1636.40 1636.50 0
2017-08-03 Multi-Stage Fracture 1607.10 1607.20 0
2017-08-03 Multi-Stage Fracture 1577.90 1578.00 0
2017-08-03 Multi-Stage Fracture 1548.60 1548.70 0
2017-08-03 Multi-Stage Fracture 1519.30 1519.40 0
2017-08-03 Multi-Stage Fracture 1490.10 1490.20 0
2017-08-03 Multi-Stage Fracture 1460.80 1460.90 0
2017-08-03 Multi-Stage Fracture 1431.50 1431.60 0
2017-08-03 Multi-Stage Fracture 1372.90 1373.00 0
2017-08-03 Multi-Stage Fracture 1285.30 1285.40 0
2017-08-02 Multi-Stage Fracture 2131.90 2132.00 0
2017-08-03 Multi-Stage Fracture 1255.90 1256.00 0
2017-08-03 Multi-Stage Fracture 1197.60 1197.70 0
2017-08-03 Multi-Stage Fracture 1138.90 1139.00 0
2017-08-03 Multi-Stage Fracture 1109.70 1109.80 0
2017-08-03 Multi-Stage Fracture 992.70 992.80 0
2017-08-03 Multi-Stage Fracture 934.90 935.00 0
2017-08-03 Multi-Stage Fracture 905.60 905.70 0
2017-08-03 Multi-Stage Fracture 876.30 876.40 0
2017-08-02 Multi-Stage Fracture 2102.70 2102.80 0
2017-08-02 Multi-Stage Fracture 2073.50 2073.60 0
2017-08-02 Multi-Stage Fracture 2044.20 2044.30 0
2017-08-02 Multi-Stage Fracture 2014.90 2015.00 0
2017-08-02 Multi-Stage Fracture 1985.60 1985.70 0
2017-08-02 Multi-Stage Fracture 1956.30 1956.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-02 2017-08-03 690 1,665 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 86.0838 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 8.0466 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0567 N/A
water 7732-18-5 100 0.0567 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0418 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1373 N/A
Ethylene glycol 107-21-1 100 0.1373 N/A
Potassium Carbonate 584-08-7 100 0.1373 N/A
Potassium Hydroxide 1310-58-3 100 0.1373 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3424 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0716 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0717 N/A
water 7732-18-5 100 0.0716 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-02 2017-08-03 Groundwater - Non-saline greater than 150m deep 555
2017-08-02 2017-08-03 Surface Water - Runoff 555
2017-08-02 2017-08-03 Waste Water - Oilfield 555
2017-08-01 2017-08-02 Groundwater - Saline 555

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 720 0.0 0.0 0.0
2018 5295 0.0 0.0 0.0
2019 8583 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-14 No Incident Encountered 0.00 0.00
2017-07-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References