X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032601000

Well Details

Well ID: 0344032601000
Loading map...
Location: 00/01-26-034-03W4/0
Location Alias: 00/01-26-34-03 W4M
Location Alias 2: 00/01-26-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 26
County/Municipality: Special Areas No. 4
Well Name: RHE PROVOST 1-26-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0484059
License Date: 2017-06-15
License Status: Issued
Spud Date: 2017-07-04
Final Drill Date: 2017-07-25
Well Total Depth: 2347.00 m
Surface Hole Latitude: 51.941044
Surface Hole Longitude: -110.339420

For data sources see[1][2]

Well History

Date Event
2017-06-15 Obtained License
2017-07-05 Surface Casing Operation Performed
2017-07-24 Direction Drilling Operation Performed - Deviate
2017-07-24 Direction Drilling Operation Performed - Horizontal
2017-07-25 Finished Drilling
2017-07-25 Well Log Performed
2017-07-25 Well Mode changed to Drilled and Cased
2017-07-26 Production Casing Operation Performed
2017-07-26 Rig Released
2017-08-02 Well Log Performed
2017-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-26 Well Began Production
2017-09-26 Well Fluid changed to Crude Oil
2017-09-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-04 Predator Drilling Inc. 27 N/A Set Surface
2017-07-23 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-24 372.20 Deviate (5 - 79 degrees)
2017-07-24 940.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-25 Multi-Stage Fracture 2291.60 2291.70 0
2017-09-25 Multi-Stage Fracture 1983.90 1984.00 0
2017-09-25 Multi-Stage Fracture 1948.30 1948.40 0
2017-09-25 Multi-Stage Fracture 1913.00 1913.10 0
2017-09-25 Multi-Stage Fracture 1877.30 1877.40 0
2017-09-25 Multi-Stage Fracture 1842.00 1842.10 0
2017-09-25 Multi-Stage Fracture 1806.50 1806.60 0
2017-09-25 Multi-Stage Fracture 1771.10 1771.20 0
2017-09-25 Multi-Stage Fracture 1735.90 1736.00 0
2017-09-25 Multi-Stage Fracture 1701.00 1701.10 0
2017-09-25 Multi-Stage Fracture 1655.00 1655.10 0
2017-09-25 Multi-Stage Fracture 2256.20 2256.30 0
2017-09-25 Multi-Stage Fracture 1620.30 1620.40 0
2017-09-25 Multi-Stage Fracture 1585.40 1585.50 0
2017-09-25 Multi-Stage Fracture 1550.00 1550.10 0
2017-09-25 Multi-Stage Fracture 1514.70 1514.80 0
2017-09-25 Multi-Stage Fracture 1479.80 1479.90 0
2017-09-25 Multi-Stage Fracture 1455.90 1456.00 0
2017-09-25 Multi-Stage Fracture 1420.30 1420.40 0
2017-09-25 Multi-Stage Fracture 1384.90 1385.00 0
2017-09-25 Multi-Stage Fracture 1349.60 1349.70 0
2017-09-25 Multi-Stage Fracture 1325.60 1325.70 0
2017-09-25 Multi-Stage Fracture 2232.30 2232.40 0
2017-09-25 Multi-Stage Fracture 1290.20 1290.30 0
2017-09-25 Multi-Stage Fracture 1271.80 1271.90 0
2017-09-25 Multi-Stage Fracture 1236.40 1236.50 0
2017-09-25 Multi-Stage Fracture 1212.50 1212.60 0
2017-09-25 Multi-Stage Fracture 1177.10 1177.20 0
2017-09-25 Multi-Stage Fracture 1141.70 1141.80 0
2017-09-25 Multi-Stage Fracture 1106.20 1106.30 0
2017-09-25 Multi-Stage Fracture 1070.70 1070.80 0
2017-09-25 Multi-Stage Fracture 1035.20 1035.30 0
2017-09-25 Multi-Stage Fracture 999.70 999.80 0
2017-09-25 Multi-Stage Fracture 2197.00 2197.10 0
2017-09-25 Multi-Stage Fracture 952.60 952.70 0
2017-09-25 Multi-Stage Fracture 2173.20 2173.30 0
2017-09-25 Multi-Stage Fracture 2126.00 2126.10 0
2017-09-25 Multi-Stage Fracture 2090.30 2090.40 0
2017-09-25 Multi-Stage Fracture 2054.80 2054.90 0
2017-09-25 Multi-Stage Fracture 2019.20 2019.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-25 2017-09-25 757 1,731 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 72.285 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.5824 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0383 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1454 N/A
Ethylene glycol 107-21-1 100 0.1454 N/A
Potassium Carbonate 584-08-7 100 0.1454 N/A
Potassium Hydroxide 1310-58-3 100 0.1454 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3067 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0594 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0594 N/A
water 7732-18-5 100 0.0594 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-22 2017-09-24 Surface Water - Runoff 1915

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2229 0.0 0.0 0.0
2018 8335 0.0 0.0 0.0
2019 7963 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-26 No Incident Encountered 0.00 0.00
2017-10-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References