If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344032601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.941044,"lon":-110.33942,"icon":""}]} |
Location: 00/01-26-034-03W4/0 | |
Location Alias: 00/01-26-34-03 W4M | |
Location Alias 2: 00/01-26-034-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Special Areas No. 4 | |
Well Name: RHE PROVOST 1-26-34-3 | |
Operator Name: Rolling Hills Energy Ltd. | |
License Number: 0484059 | |
License Date: 2017-06-15 | |
License Status: Issued | |
Spud Date: 2017-07-04 | |
Final Drill Date: 2017-07-25 | |
Well Total Depth: 2347.00 m | |
Surface Hole Latitude: 51.941044 | |
Surface Hole Longitude: -110.339420 |
Date | Event |
---|---|
2017-06-15 | Obtained License |
2017-07-05 | Surface Casing Operation Performed |
2017-07-24 | Direction Drilling Operation Performed - Deviate |
2017-07-24 | Direction Drilling Operation Performed - Horizontal |
2017-07-25 | Finished Drilling |
2017-07-25 | Well Log Performed |
2017-07-25 | Well Mode changed to Drilled and Cased |
2017-07-26 | Production Casing Operation Performed |
2017-07-26 | Rig Released |
2017-08-02 | Well Log Performed |
2017-09-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-09-26 | Well Began Production |
2017-09-26 | Well Fluid changed to Crude Oil |
2017-09-26 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-07-04 | Predator Drilling Inc. | 27 | N/A | Set Surface |
2017-07-23 | Precision Drilling Corporation | 292 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-07-24 | 372.20 | Deviate (5 - 79 degrees) |
2017-07-24 | 940.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-09-25 | Multi-Stage Fracture | 2291.60 | 2291.70 | 0 |
2017-09-25 | Multi-Stage Fracture | 1983.90 | 1984.00 | 0 |
2017-09-25 | Multi-Stage Fracture | 1948.30 | 1948.40 | 0 |
2017-09-25 | Multi-Stage Fracture | 1913.00 | 1913.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 1877.30 | 1877.40 | 0 |
2017-09-25 | Multi-Stage Fracture | 1842.00 | 1842.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 1806.50 | 1806.60 | 0 |
2017-09-25 | Multi-Stage Fracture | 1771.10 | 1771.20 | 0 |
2017-09-25 | Multi-Stage Fracture | 1735.90 | 1736.00 | 0 |
2017-09-25 | Multi-Stage Fracture | 1701.00 | 1701.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 1655.00 | 1655.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 2256.20 | 2256.30 | 0 |
2017-09-25 | Multi-Stage Fracture | 1620.30 | 1620.40 | 0 |
2017-09-25 | Multi-Stage Fracture | 1585.40 | 1585.50 | 0 |
2017-09-25 | Multi-Stage Fracture | 1550.00 | 1550.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 1514.70 | 1514.80 | 0 |
2017-09-25 | Multi-Stage Fracture | 1479.80 | 1479.90 | 0 |
2017-09-25 | Multi-Stage Fracture | 1455.90 | 1456.00 | 0 |
2017-09-25 | Multi-Stage Fracture | 1420.30 | 1420.40 | 0 |
2017-09-25 | Multi-Stage Fracture | 1384.90 | 1385.00 | 0 |
2017-09-25 | Multi-Stage Fracture | 1349.60 | 1349.70 | 0 |
2017-09-25 | Multi-Stage Fracture | 1325.60 | 1325.70 | 0 |
2017-09-25 | Multi-Stage Fracture | 2232.30 | 2232.40 | 0 |
2017-09-25 | Multi-Stage Fracture | 1290.20 | 1290.30 | 0 |
2017-09-25 | Multi-Stage Fracture | 1271.80 | 1271.90 | 0 |
2017-09-25 | Multi-Stage Fracture | 1236.40 | 1236.50 | 0 |
2017-09-25 | Multi-Stage Fracture | 1212.50 | 1212.60 | 0 |
2017-09-25 | Multi-Stage Fracture | 1177.10 | 1177.20 | 0 |
2017-09-25 | Multi-Stage Fracture | 1141.70 | 1141.80 | 0 |
2017-09-25 | Multi-Stage Fracture | 1106.20 | 1106.30 | 0 |
2017-09-25 | Multi-Stage Fracture | 1070.70 | 1070.80 | 0 |
2017-09-25 | Multi-Stage Fracture | 1035.20 | 1035.30 | 0 |
2017-09-25 | Multi-Stage Fracture | 999.70 | 999.80 | 0 |
2017-09-25 | Multi-Stage Fracture | 2197.00 | 2197.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 952.60 | 952.70 | 0 |
2017-09-25 | Multi-Stage Fracture | 2173.20 | 2173.30 | 0 |
2017-09-25 | Multi-Stage Fracture | 2126.00 | 2126.10 | 0 |
2017-09-25 | Multi-Stage Fracture | 2090.30 | 2090.40 | 0 |
2017-09-25 | Multi-Stage Fracture | 2054.80 | 2054.90 | 0 |
2017-09-25 | Multi-Stage Fracture | 2019.20 | 2019.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-25 | 2017-09-25 | 757 | 1,731 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 72.285 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 13.5824 | N/A | ||
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0383 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1454 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.1454 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.1454 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.1454 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.3067 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | Methanol | 67-56-1 | 100 | 0.0594 | N/A | |
Trimethylopropane ethoxylated | 52624-57-4 | 100 | 0.0594 | N/A | ||||
water | 7732-18-5 | 100 | 0.0594 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-09-22 | 2017-09-24 | Surface Water - Runoff | 1915 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2229 | 0.0 | 0.0 | 0.0 |
2018 | 8335 | 0.0 | 0.0 | 0.0 |
2019 | 7963 | 0.0 | 0.0 | 0.0 |
2020 | 2161 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-07-26 | No Incident Encountered | 0.00 | 0.00 |
2017-10-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]