X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344031716020

Well Details

Well ID: 0344031716020
Loading map...
Location: 02/16-17-034-03W4/0
Location Alias: 02/16-17-34-03 W4M
Location Alias 2: 02/16-17-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 17
County/Municipality: Special Areas No. 4
Well Name: RHE 102 PROVOST 16-17-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0486678
License Date: 2017-12-01
License Status: Issued
Spud Date: 2017-12-11
Final Drill Date: 2018-01-30
Well Total Depth: 2315.00 m
Surface Hole Latitude: 51.909440
Surface Hole Longitude: -110.387992

For data sources see[1][2]

Well History

Date Event
2017-12-01 Obtained License
2017-12-12 Surface Casing Operation Performed
2018-01-28 Direction Drilling Operation Performed - Deviate
2018-01-28 Direction Drilling Operation Performed - Horizontal
2018-01-30 Finished Drilling
2018-01-30 Production Casing Operation Performed
2018-01-30 Well Log Performed
2018-01-30 Well Mode changed to Drilled and Cased
2018-01-31 Rig Released
2018-02-09 Well Log Performed
2018-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-10 Well Began Production
2018-03-10 Well Fluid changed to Crude Oil
2018-03-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-12 Predator Drilling Inc. 27 N/A Set Surface
2018-01-28 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-28 390.00 Deviate (5 - 79 degrees)
2018-01-28 863.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-26 Multi-Stage Fracture 2263.50 2263.60 0
2018-02-26 Multi-Stage Fracture 1949.60 1949.70 0
2018-02-26 Multi-Stage Fracture 1925.10 1925.20 0
2018-02-26 Multi-Stage Fracture 1888.90 1889.00 0
2018-02-26 Multi-Stage Fracture 1864.40 1864.50 0
2018-02-26 Multi-Stage Fracture 1828.20 1828.30 0
2018-02-26 Multi-Stage Fracture 1803.70 1803.80 0
2018-02-26 Multi-Stage Fracture 1755.80 1755.90 0
2018-02-26 Multi-Stage Fracture 1731.30 1731.40 0
2018-02-26 Multi-Stage Fracture 1695.10 1695.20 0
2018-02-26 Multi-Stage Fracture 1670.60 1670.70 0
2018-02-26 Multi-Stage Fracture 2227.30 2227.40 0
2018-02-26 Multi-Stage Fracture 1634.40 1634.50 0
2018-02-26 Multi-Stage Fracture 1598.20 1598.30 0
2018-02-26 Multi-Stage Fracture 1562.00 1562.10 0
2018-02-26 Multi-Stage Fracture 1537.40 1537.50 0
2018-02-26 Multi-Stage Fracture 1512.90 1513.00 0
2018-02-26 Multi-Stage Fracture 1406.60 1406.70 0
2018-02-26 Multi-Stage Fracture 1382.10 1382.20 0
2018-02-26 Multi-Stage Fracture 1357.60 1357.70 0
2018-02-26 Multi-Stage Fracture 1321.40 1321.50 0
2018-02-26 Multi-Stage Fracture 1285.30 1285.40 0
2018-02-26 Multi-Stage Fracture 2202.80 2202.90 0
2018-02-26 Multi-Stage Fracture 1249.10 1249.20 0
2018-02-26 Multi-Stage Fracture 1224.60 1224.70 0
2018-02-26 Multi-Stage Fracture 1188.60 1188.70 0
2018-02-26 Multi-Stage Fracture 1164.10 1164.20 0
2018-02-26 Multi-Stage Fracture 1128.00 1128.10 0
2018-02-26 Multi-Stage Fracture 1103.50 1103.60 0
2018-02-26 Multi-Stage Fracture 1067.70 1067.80 0
2018-02-26 Multi-Stage Fracture 1017.80 1017.90 0
2018-02-26 Multi-Stage Fracture 993.30 993.40 0
2018-02-26 Multi-Stage Fracture 957.10 957.20 0
2018-02-26 Multi-Stage Fracture 2165.70 2165.80 0
2018-02-26 Multi-Stage Fracture 932.60 932.70 0
2018-02-26 Multi-Stage Fracture 2142.10 2142.20 0
2018-02-26 Multi-Stage Fracture 2082.80 2082.90 0
2018-02-26 Multi-Stage Fracture 2046.60 2046.70 0
2018-02-26 Multi-Stage Fracture 2010.40 2010.50 0
2018-02-26 Multi-Stage Fracture 1985.80 1985.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-26 2018-02-26 706 1,708 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 72.03 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.629 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0937 N/A
water 7732-18-5 100 0.0937 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.045 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1611 N/A
Ethylene glycol 107-21-1 100 0.1611 N/A
Potassium Carbonate 584-08-7 100 0.1611 N/A
Potassium Hydroxide 1310-58-3 100 0.1611 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0212 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3302 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0604 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0604 N/A
water 7732-18-5 100 0.0604 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-20 2018-02-23 Surface Water - Runoff 231
2018-02-20 2018-02-23 Surface Water - Runoff 203
2018-02-20 2018-02-23 Surface Water - Runoff 665
2018-02-20 2018-02-23 Surface Water - Runoff 277

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7053 0.0 0.0 0.0
2019 8727 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-31 No Incident Encountered 0.00 0.00
2018-03-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References