If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335101412003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.835368,"lon":-115.324695,"icon":""}]} |
Location: 00/12-14-033-10W5/3 | |
Location Alias: 00/12-14-33-10 W5M | |
Location Alias 2: 00/12-14-033-10 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 10 | |
Section: 14 | |
County/Municipality: Clearwater County | |
Well Name: SHELL 12 LIMESTONE 12-14-33-10 | |
Operator Name: Shell Canada Limited | |
License Number: 0099191 | |
License Date: 1982-11-25 | |
License Status: Abandoned | |
Spud Date: 1982-11-29 | |
Final Drill Date: 1996-04-10 | |
Well Total Depth: 4241.00 m | |
Surface Hole Latitude: 51.835368 | |
Surface Hole Longitude: -115.324695 |
Date | Event |
---|---|
1982-11-25 | Obtained License |
1996-01-10 | Well Log Performed |
1996-01-19 | Well Log Performed |
1996-01-23 | Well Log Performed |
1996-01-26 | Well Log Performed |
1996-03-04 | Direction Drilling Operation Performed - Horizontal |
1996-03-04 | Well Log Performed |
1996-03-07 | Well Log Performed |
1996-03-16 | Well Log Performed |
1996-03-21 | Perforation Treatment Performed - Open-Hole Completion |
1996-03-26 | Well Log Performed |
1996-03-27 | Well Log Performed |
1996-03-30 | Liner Casing Operation Performed |
1996-04-03 | Well Log Performed |
1996-04-06 | Well Log Performed |
1996-04-10 | Finished Drilling |
1996-04-10 | Well Mode changed to Drilled and Cased |
1996-04-16 | Rig Released |
1996-05-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-05-15 | Well Began Production |
1996-05-15 | Well Fluid changed to Gas |
1996-05-15 | Well Mode changed to Flowing |
1998-08-30 | Well Log Performed |
1998-08-31 | Perforation Treatment Performed - Jet Perforation |
1998-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-02-01 | Plug Back Performed |
1999-02-07 | Perforation Treatment Performed - Jet Perforation |
1999-02-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
1999-02-11 | Perforation Treatment Performed - Jet Perforation |
1999-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-02-17 | Plug Back Performed |
1999-02-19 | Perforation Treatment Performed - Fractured |
1999-02-28 | Well Fluid changed to Gas |
1999-02-28 | Well Mode changed to Suspended |
2009-10-02 | Plug Back Performed |
2010-01-30 | Well Fluid changed to Gas |
2010-01-30 | Well Mode changed to Flowing |
2010-01-31 | Well Fluid changed to Gas |
2010-01-31 | Well Mode changed to Suspended |
2014-05-15 | Perforation Treatment Performed - Cement Plug |
2014-05-15 | Plug Back Performed |
2014-05-15 | Well Fluid changed to Gas |
2014-05-15 | Well Mode changed to Abandoned Zone |
2014-05-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-05-16 | Plug Back Performed |
2014-05-16 | Well Log Performed |
2014-05-18 | Perforation Treatment Performed - Jet Perforation |
2014-05-20 | Perforation Treatment Performed - Cement Squeeze |
2014-05-20 | Plug Back Performed |
2014-05-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-05-24 | Perforation Treatment Performed - Jet Perforation |
2014-05-24 | Plug Back Performed |
2014-05-24 | Well Log Performed |
2014-05-26 | Perforation Treatment Performed - Cement Squeeze |
2014-05-26 | Plug Back Performed |
2014-05-26 | Well Log Performed |
2014-05-29 | Well Log Performed |
2014-05-30 | Perforation Treatment Performed - Jet Perforation |
2014-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-05-31 | Perforation Treatment Performed - Cement Squeeze |
2014-05-31 | Plug Back Performed |
2014-06-01 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2014-06-01 | Perforation Treatment Performed - Cement Squeeze |
2014-06-01 | Perforation Treatment Performed - Jet Perforation |
2014-06-01 | Plug Back Performed |
2014-06-01 | Well Log Performed |
2014-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-02 | Perforation Treatment Performed - Cement Squeeze |
2014-06-02 | Perforation Treatment Performed - Jet Perforation |
2014-06-02 | Plug Back Performed |
2014-06-02 | Well Log Performed |
2014-09-20 | Well Abandoned |
2015-05-18 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-03-04 | 3748.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-21 | Open Hole/Barefoot Completion | 4050.00 | 4241.00 | 0 |
1999-02-11 | Perforation | 3691.00 | 3703.00 | 20 |
1999-02-11 | Perforation | 3706.00 | 3712.60 | 20 |
1999-02-11 | Perforation | 3764.50 | 3769.00 | 20 |
1999-02-11 | Perforation | 3773.50 | 3779.50 | 20 |
1999-02-17 | Packing Device Capped w/Cement | 3851.00 | 3860.00 | 0 |
1999-02-19 | Fracture | 3691.00 | 3779.50 | 0 |
2014-05-15 | Cement Plug | 3552.00 | 3659.90 | 0 |
2014-05-16 | Packing Device Capped w/Cement | 3160.00 | 3170.00 | 0 |
2014-05-18 | Perforation | 2270.00 | 2273.00 | 17 |
2014-05-18 | Perforation | 2053.00 | 2056.00 | 17 |
1996-05-13 | Acid Treatment | 4050.00 | 4241.00 | 0 |
2014-05-20 | Cement Squeeze | 2053.00 | 2273.00 | 0 |
2014-05-24 | Packing Device Capped w/Cement | 1855.50 | 1866.00 | 0 |
2014-05-24 | Perforation | 1627.00 | 1630.00 | 17 |
2014-05-24 | Perforation | 1517.00 | 1520.00 | 17 |
2014-05-26 | Cement Squeeze | 1517.00 | 1630.00 | 0 |
2014-05-30 | Perforation | 418.00 | 419.00 | 17 |
2014-05-30 | Perforation | 364.00 | 365.00 | 17 |
2014-05-31 | Cement Squeeze | 364.00 | 419.00 | 0 |
2014-05-31 | Packing Device Capped w/Cement | 349.50 | 357.50 | 0 |
2014-06-01 | Perforation | 248.00 | 249.00 | 17 |
1998-08-31 | Perforation | 4145.00 | 4217.00 | 13 |
2014-06-01 | Cement Squeeze | 248.00 | 249.00 | 0 |
2014-06-01 | Bridge Plug, No Cement | 191.50 | 192.70 | 0 |
2014-06-02 | Perforation | 200.00 | 201.00 | 17 |
2014-06-02 | Cement Squeeze | 200.00 | 201.00 | 0 |
2014-06-02 | Packing Device Capped w/Cement | 181.50 | 191.50 | 0 |
1998-09-07 | Acid Treatment | 4145.00 | 4217.00 | 0 |
1999-02-01 | Packing Device Capped w/Cement | 3925.00 | 3928.00 | 0 |
1999-02-07 | Perforation | 3902.50 | 3913.00 | 13 |
1999-02-07 | Perforation | 3890.00 | 3900.50 | 13 |
1999-02-07 | Perforation | 3882.00 | 3886.00 | 13 |
1999-02-08 | Acid Wash | 3882.00 | 3913.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3214 | 0.0 | 0.0 | 0.0 |
1997 | 2812 | 0.0 | 0.0 | 0.0 |
1998 | 395 | 0.0 | 0.0 | 0.0 |
1999 | 73 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-06-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]