If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335082514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.864916,"lon":-115.009796,"icon":""}]} |
Location: 00/14-25-033-08W5/0 | |
Location Alias: 00/14-25-33-08 W5M | |
Location Alias 2: 00/14-25-033-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 08 | |
Section: 25 | |
County/Municipality: Clearwater County | |
Well Name: PCI RICINUS 14-25-33-8 | |
Operator Name: TAQA North Ltd. | |
License Number: 0134556 | |
License Date: 1988-06-24 | |
License Status: Abandoned | |
Spud Date: 1988-07-15 | |
Final Drill Date: 1988-08-26 | |
Well Total Depth: 2997.00 m | |
Surface Hole Latitude: 51.864916 | |
Surface Hole Longitude: -115.009796 |
Date | Event |
---|---|
1988-06-24 | Obtained License |
1988-07-15 | Lost Circulation Occurred |
1988-07-18 | Lost Circulation Occurred |
1988-07-22 | Surface Casing Operation Performed |
1988-07-25 | Direction Drilling Operation Performed - Deviate |
1988-08-22 | Well Log Performed |
1988-08-23 | Well Log Performed |
1988-08-25 | Kick Occurred |
1988-08-26 | Finished Drilling |
1988-08-27 | Well Log Performed |
1988-08-29 | Production Casing Operation Performed |
1988-08-30 | Rig Released |
1988-08-30 | Well Mode changed to Drilled and Cased |
1988-09-07 | Well Log Performed |
1988-10-13 | Well Log Performed |
1988-10-15 | Perforation Treatment Performed - Jet Perforation |
1988-10-15 | Well Log Performed |
1988-10-17 | Perforation Treatment Performed - Fractured |
1993-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-12 | Plug Back Performed |
1993-06-13 | Perforation Treatment Performed - Jet Perforation |
1993-06-13 | Perforation Treatment Performed - Remedial Casing |
1993-06-13 | Well Log Performed |
1993-06-13 | Well Mode changed to Abandoned |
1993-06-14 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1988-07-25 | 434.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-10-15 | Perforation | 2697.00 | 2710.00 | 16 |
1988-10-17 | Fracture | 2697.00 | 2710.00 | 0 |
1993-06-12 | Packing Device Capped w/Cement | 2677.00 | 2685.00 | 0 |
1993-06-13 | Perforation | 615.00 | 616.00 | 13 |
1993-06-13 | Remedial Casing Cementing | 615.00 | 616.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-07-15 | Lost Circulation | 20.50 | 34.00 |
1988-07-18 | Lost Circulation | 21.00 | 21.00 |
1988-08-25 | Kick | 2876.00 | 2876.00 |
For data sources see[6]