X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335072005003

Well Details

Well ID: 0335072005003
Loading map...
Location: 00/05-20-033-07W5/3
Location Alias: 00/05-20-33-07 W5M
Location Alias 2: 00/05-20-033-07 W5/03
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 07
Section: 20
County/Municipality: Clearwater County
Well Name: PC 8-19RE RICINUS 5-20-33-7
Operator Name: TAQA North Ltd.
License Number: 0168302
License Date: 1994-06-30
License Status: Amended
Spud Date: 1999-11-04
Final Drill Date: 1999-11-08
Well Total Depth: 2935.00 m
Surface Hole Latitude: 51.844060
Surface Hole Longitude: -114.973911

For data sources see[1][2]

Well History

Date Event
1994-06-30 Obtained License
1999-11-04 Direction Drilling Operation Performed - Deviate
1999-11-04 Perforation Treatment Performed - Fractured
1999-11-04 Perforation Treatment Performed - Jet Perforation
1999-11-05 Direction Drilling Operation Performed - Deviate
1999-11-08 Finished Drilling
1999-11-08 Well Log Performed
1999-11-09 Well Log Performed
1999-11-11 Well Log Performed
1999-11-12 Liner Casing Operation Performed
1999-11-12 Well Log Performed
1999-11-13 Rig Released
1999-11-13 Well Mode changed to Drilled and Cased
1999-11-24 Perforation Treatment Performed - Open-Hole Completion
1999-11-25 Well Log Performed
1999-11-26 Perforation Treatment Performed - Chemical Squeeze
1999-11-28 Perforation Treatment Performed - Fractured
1999-12-06 Perforation Treatment Performed - Jet Perforation
1999-12-06 Well Log Performed
1999-12-10 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-11-04 391.40 Deviate (5 - 79 degrees)
1999-11-04 1428.00 Deviate (5 - 79 degrees)
1999-11-05 2715.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-04 Perforation 2514.00 2534.00 18
1999-11-04 Fracture 2514.00 2534.00 0
1999-11-04 Fracture 2514.00 2534.00 0
1999-11-24 Open Hole/Barefoot Completion 2886.00 2907.00 0
1999-11-26 Chemical Squeeze 2886.00 2907.00 0
1999-11-28 Fracture 2886.00 2907.00 0
1999-12-06 Perforation 2514.00 2534.00 17
1999-12-10 Chemical Squeeze 2514.00 2534.00 0

For data sources see[5]



References