If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335043413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.867066,"lon":-114.496667,"icon":""}]} |
Location: 02/13-34-033-04W5/0 | |
Location Alias: 02/13-34-33-04 W5M | |
Location Alias 2: 02/13-34-033-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 04 | |
Section: 34 | |
County/Municipality: Mountain View County | |
Well Name: TIMBERROCK HZ 102 GARR 13-34-33-4 | |
Operator Name: TimberRock Energy Corp. | |
License Number: 0489150 | |
License Date: 2018-05-14 | |
License Status: Issued | |
Spud Date: 2019-01-18 | |
Final Drill Date: 2019-02-02 | |
Well Total Depth: 3945.00 m | |
Surface Hole Latitude: 51.867066 | |
Surface Hole Longitude: -114.496667 |
Date | Event |
---|---|
2018-05-14 | Obtained License |
2019-01-20 | Surface Casing Operation Performed |
2019-01-23 | Direction Drilling Operation Performed - Deviate |
2019-01-25 | Direction Drilling Operation Performed - Horizontal |
2019-01-27 | Intermediate Casing Operation Performed |
2019-02-02 | Finished Drilling |
2019-02-02 | Production Casing Operation Performed |
2019-02-02 | Well Log Performed |
2019-02-02 | Well Mode changed to Drilled and Cased |
2019-02-04 | Rig Released |
2019-02-17 | Well Fluid changed to Crude Oil |
2019-02-17 | Well Mode changed to Drilling and Completing |
2019-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-17 | Well Began Production |
2019-04-17 | Well Fluid changed to Crude Oil |
2019-04-17 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-01-18 | Twilight Drilling Ltd. | 2 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-01-23 | 2177.00 | Deviate (5 - 79 degrees) |
2019-01-25 | 2620.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-02-21 | Multi-Stage Fracture | 3913.00 | 3913.10 | 0 |
2019-02-22 | Multi-Stage Fracture | 3526.90 | 3527.00 | 0 |
2019-02-22 | Multi-Stage Fracture | 3493.60 | 3493.70 | 0 |
2019-02-22 | Multi-Stage Fracture | 3459.80 | 3459.90 | 0 |
2019-02-22 | Multi-Stage Fracture | 3426.30 | 3426.40 | 0 |
2019-02-22 | Multi-Stage Fracture | 3378.10 | 3378.20 | 0 |
2019-02-22 | Multi-Stage Fracture | 3329.70 | 3329.80 | 0 |
2019-02-22 | Multi-Stage Fracture | 3281.40 | 3281.50 | 0 |
2019-02-22 | Multi-Stage Fracture | 3233.10 | 3233.20 | 0 |
2019-02-22 | Multi-Stage Fracture | 3185.20 | 3185.30 | 0 |
2019-02-22 | Multi-Stage Fracture | 3137.80 | 3137.90 | 0 |
2019-02-21 | Multi-Stage Fracture | 3865.30 | 3865.40 | 0 |
2019-02-22 | Multi-Stage Fracture | 3090.40 | 3090.50 | 0 |
2019-02-22 | Multi-Stage Fracture | 3056.80 | 3056.90 | 0 |
2019-02-22 | Multi-Stage Fracture | 2894.20 | 2894.30 | 0 |
2019-02-22 | Multi-Stage Fracture | 2845.90 | 2846.00 | 0 |
2019-02-22 | Multi-Stage Fracture | 2798.70 | 2798.80 | 0 |
2019-02-22 | Multi-Stage Fracture | 2750.40 | 2750.50 | 0 |
2019-02-22 | Multi-Stage Fracture | 2702.50 | 2702.60 | 0 |
2019-02-22 | Multi-Stage Fracture | 2668.70 | 2668.80 | 0 |
2019-02-21 | Multi-Stage Fracture | 3817.60 | 3817.70 | 0 |
2019-02-21 | Multi-Stage Fracture | 3769.40 | 3769.50 | 0 |
2019-02-22 | Multi-Stage Fracture | 3721.10 | 3721.20 | 0 |
2019-02-22 | Multi-Stage Fracture | 3675.90 | 3676.00 | 0 |
2019-02-22 | Multi-Stage Fracture | 3628.00 | 3628.10 | 0 |
2019-02-22 | Multi-Stage Fracture | 3594.20 | 3594.30 | 0 |
2019-02-22 | Multi-Stage Fracture | 3560.40 | 3560.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-02-21 | 2019-02-22 | 2,515 | 4,791 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 79.8699 | N/A | |||
30/50 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 18.9858 | N/A | ||
50/140 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 0.4682 | N/A | ||
28% HCl Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.2416 | N/A | |
Water | 7732-18-5 | 100 | 0.2416 | N/A | ||||
SAB-1 Acid Blend Additive Package | Step Energy Services | Acid | Acetic Acid | 64-19-7 | 100 | 0.0053 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0053 | N/A | ||||
Methyl Alcohol | 67-56-1 | 100 | 0.0053 | N/A | ||||
Non Hazardous Ingredients | Not Available | 100 | 0.0053 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.0053 | N/A | ||||
SABB-1 (Acid Corrosion Inhibitor) | Step Energy Services | Acid | 2-Propanol | 67-63-0 | 100 | 0.0028 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0028 | N/A | ||||
Methyl Alcohol | 67-56-1 | 100 | 0.0028 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0028 | N/A | ||||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0083 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0083 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0083 | N/A | ||||
SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0135 | N/A | |
Cured Acrylic Resin | Not Available | 100 | 0.0135 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0135 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.3209 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.3209 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.3209 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0831 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0831 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0831 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0831 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0831 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0831 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0831 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-02-13 | 2019-02-25 | Surface Water - River | 5791 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6037 | 0.0 | 0.0 | 0.0 |
2020 | 2029 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-04 | No Incident Encountered | 0.00 | 0.00 |
2019-02-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]