X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335043406000

Well Details

Well ID: 0335043406000
Loading map...
Location: 00/06-34-033-04W5/0
Location Alias: 00/06-34-33-04 W5M
Location Alias 2: 00/06-34-033-04 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 04
Section: 34
County/Municipality: Mountain View County
Well Name: BEC GARR 6-34-33-4
Operator Name: Bonavista Energy Corporation
License Number: 0021089
License Date: 1961-07-20
License Status: Issued
Spud Date: 1961-07-28
Final Drill Date: 1961-08-24
Well Total Depth: 2627.40 m
Surface Hole Latitude: 51.873211
Surface Hole Longitude: -114.488763

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-07-20 Obtained License
1961-08-13 Drill Stem Test Performed
1961-08-20 Drill Stem Test Performed
1961-08-23 Drill Stem Test Performed
1961-08-24 Finished Drilling
1961-08-25 Production Casing Operation Performed
1961-09-05 Well Mode changed to Drilled and Cased
1966-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-07-08 Perforation Treatment Performed - Jet Perforation
1968-03-22 Perforation Treatment Performed - Jet Perforation
1968-08-03 Perforation Treatment Performed - Cement Squeeze
1968-09-15 Well Began Production
1968-09-15 Well Fluid changed to Gas
1968-09-15 Well Mode changed to Flowing
1997-03-28 Perforation Treatment Performed - Jet Perforation
1997-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-13 Well Log Performed
2007-06-26 Well Log Performed
2007-06-30 Well Log Performed
2018-07-23 Well Fluid changed to Gas
2018-07-23 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-07-08 Perforation 2597.50 2601.80 7
1966-07-08 Acid Treatment 2597.50 2601.80 0
1968-03-22 Perforation 2550.60 2553.00 7
1968-08-03 Cement Squeeze 2550.60 2553.00 7
1997-03-28 Perforation 2593.80 2611.80 20
1997-03-29 Acid Treatment 2593.80 2611.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1968 1441 0.0 0.0 0.0
1969 7086 0.0 0.0 0.0
1970 8049 0.0 0.0 0.0
1971 7939 0.0 0.0 0.0
1972 7918 0.0 0.0 0.0
1973 8331 0.0 0.0 0.0
1974 8530 0.0 0.0 0.0
1975 8376 0.0 0.0 0.0
1976 8293 0.0 0.0 0.0
1977 7967 0.0 0.0 0.0
1978 4435 0.0 0.0 0.0
1979 7763 0.0 0.0 0.0
1980 4360 0.0 0.0 0.0
1981 3794 0.0 0.0 0.0
1982 7950 0.0 0.0 0.0
1983 6383 0.0 0.0 0.0
1984 2863 0.0 0.0 0.0
1985 2589 0.0 0.0 0.0
1986 5852 0.0 0.0 0.0
1987 5153 0.0 0.0 0.0
1988 6010 0.0 0.0 0.0
1989 3029 0.0 0.0 0.0
1990 3859 0.0 0.0 0.0
1991 3249 0.0 0.0 0.0
1992 4245 0.0 0.0 0.0
1993 7299 0.0 0.0 0.0
1994 7763 0.0 0.0 0.0
1995 8676 0.0 0.0 0.0
1996 8183 0.0 0.0 0.0
1997 8234 0.0 0.0 0.0
1998 8362 0.0 0.0 0.0
1999 8428 0.0 0.0 0.0
2000 8422 0.0 0.0 0.0
2001 8636 0.0 0.0 0.0
2002 8494 0.0 0.0 0.0
2003 7783 0.0 0.0 0.0
2004 8361 0.0 0.0 0.0
2005 7575 0.0 0.0 0.0
2006 8189 0.0 0.0 0.0
2007 7217 0.0 0.0 0.0
2008 8155 0.0 0.0 0.0
2009 8472 0.0 0.0 0.0
2010 8683 0.0 0.0 0.0
2011 8173 0.0 0.0 0.0
2012 8696 0.0 0.0 0.0
2013 8000 0.0 0.0 0.0
2014 8415 0.0 0.0 0.0
2015 8127 0.0 0.0 0.0
2016 8603 0.0 0.0 0.0
2017 8717 0.0 0.0 0.0
2018 7261 0.0 0.0 0.0
2019 8403 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References