If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335043309003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.867156,"lon":-114.496667,"icon":""}]} |
Location: 00/09-33-033-04W5/3 | |
Location Alias: 00/09-33-33-04 W5M | |
Location Alias 2: 00/09-33-033-04 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 04 | |
Section: 33 | |
County/Municipality: Mountain View County | |
Well Name: TIMBERROCK HZ CAROL 9-33-33-4 | |
Operator Name: TimberRock Energy Corp. | |
License Number: 0489149 | |
License Date: 2018-05-14 | |
License Status: Amended | |
Spud Date: 2018-06-19 | |
Final Drill Date: 2018-07-23 | |
Well Total Depth: 3458.00 m | |
Surface Hole Latitude: 51.867156 | |
Surface Hole Longitude: -114.496667 |
Date | Event |
---|---|
2018-05-14 | Obtained License |
2018-06-21 | Surface Casing Operation Performed |
2018-06-24 | Direction Drilling Operation Performed - Deviate |
2018-06-30 | Direction Drilling Operation Performed - Horizontal |
2018-07-02 | Intermediate Casing Operation Performed |
2018-07-19 | Direction Drilling Operation Performed - Horizontal |
2018-07-23 | Finished Drilling |
2018-07-23 | Well Log Performed |
2018-07-23 | Well Mode changed to Drilled and Cased |
2018-07-31 | Production Casing Operation Performed |
2018-08-03 | Rig Released |
2019-02-14 | Well Fluid changed to Crude Oil |
2019-02-14 | Well Mode changed to Drilling and Completing |
2019-02-15 | Perforation Treatment Performed - Jet Perforation |
2019-02-16 | Perforation Treatment Performed - Jet Perforation |
2019-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-24 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2019-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-04-20 | Well Began Production |
2019-04-20 | Well Fluid changed to Crude Oil |
2019-04-20 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-06-24 | 2021.10 | Deviate (5 - 79 degrees) |
2018-06-30 | 2654.00 | Horizontal |
2018-07-19 | 2745.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-02-15 | Perforation | 3275.00 | 3277.00 | 20 |
2019-02-16 | Perforation | 3023.00 | 3025.00 | 20 |
2019-02-16 | Perforation | 2995.00 | 2997.00 | 20 |
2019-02-16 | Perforation | 2967.00 | 2969.00 | 20 |
2019-02-16 | Perforation | 2939.00 | 2941.00 | 20 |
2019-02-16 | Perforation | 2911.00 | 2913.00 | 20 |
2019-02-16 | Perforation | 2883.00 | 2885.00 | 20 |
2019-02-16 | Perforation | 2855.00 | 2857.00 | 20 |
2019-02-16 | Perforation | 2827.00 | 2828.00 | 20 |
2019-02-16 | Perforation | 2799.00 | 2801.00 | 20 |
2019-02-16 | Perforation | 2771.00 | 2773.00 | 20 |
2019-02-15 | Perforation | 3247.00 | 3249.00 | 20 |
2019-02-16 | Perforation | 2743.00 | 2745.00 | 20 |
2019-02-16 | Perforation | 2715.00 | 2717.00 | 20 |
2019-02-23 | Multi-Stage Fracture | 3275.00 | 3277.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3247.00 | 3249.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3219.00 | 3221.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3191.00 | 3193.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3163.00 | 3165.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3135.00 | 3137.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3107.00 | 3109.00 | 0 |
2019-02-23 | Multi-Stage Fracture | 3079.00 | 3081.00 | 0 |
2019-02-15 | Perforation | 3219.00 | 3221.00 | 20 |
2019-02-24 | Multi-Stage Fracture | 3051.00 | 3053.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 3023.00 | 3025.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 2995.00 | 2997.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 2967.00 | 2969.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 2939.00 | 2941.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 2911.00 | 2913.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 2883.00 | 2885.00 | 0 |
2019-02-24 | Multi-Stage Fracture | 2855.00 | 2857.00 | 0 |
2019-02-24 | Hydra Jet Perforation | 2827.00 | 2828.00 | 0 |
2019-02-24 | Hydra Jet Perforation | 2799.00 | 2801.00 | 0 |
2019-02-15 | Perforation | 3191.00 | 3193.00 | 20 |
2019-02-24 | Hydra Jet Perforation | 2771.00 | 2773.00 | 0 |
2019-02-24 | Hydra Jet Perforation | 2743.00 | 2745.00 | 0 |
2019-02-24 | Hydra Jet Perforation | 2715.00 | 2717.00 | 0 |
2019-02-15 | Perforation | 3163.00 | 3165.00 | 20 |
2019-02-15 | Perforation | 3135.00 | 3137.00 | 20 |
2019-02-15 | Perforation | 3107.00 | 3109.00 | 20 |
2019-02-15 | Perforation | 3079.00 | 3081.00 | 20 |
2019-02-16 | Perforation | 3051.00 | 3053.00 | 20 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-02-23 | 2019-02-24 | 2,514 | 3,201 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 82.1162 | N/A | |||
30/50 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 17.0082 | N/A | ||
50/140 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 0.4319 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0089 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0089 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0089 | N/A | ||||
SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0142 | N/A | |
Cured Acrylic Resin | Not Available | 100 | 0.0142 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0142 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.336 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.336 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.336 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0842 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0842 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0842 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0842 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0842 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0842 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0842 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-02-13 | 2019-05-25 | Surface Water - River | 3641 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 5468 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-03 | No Incident Encountered | 0.00 | 0.00 |
2019-02-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]