If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0335042602020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.868377,"lon":-114.461446,"icon":""}]} |
Location: 02/02-26-033-04W5/0 | |
Location Alias: 02/02-26-33-04 W5M | |
Location Alias 2: 02/02-26-033-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 5 | |
Range: 04 | |
Section: 26 | |
County/Municipality: Mountain View County | |
Well Name: TIMBERROCK HZ 102 GARR 2-26-33-4 | |
Operator Name: TimberRock Energy Corp. | |
License Number: 0487721 | |
License Date: 2018-01-19 | |
License Status: Issued | |
Spud Date: 2018-01-29 | |
Final Drill Date: 2018-02-10 | |
Well Total Depth: 3907.00 m | |
Surface Hole Latitude: 51.868377 | |
Surface Hole Longitude: -114.461446 |
Date | Event |
---|---|
2018-01-19 | Obtained License |
2018-01-30 | Surface Casing Operation Performed |
2018-02-02 | Direction Drilling Operation Performed - Deviate |
2018-02-03 | Direction Drilling Operation Performed - Horizontal |
2018-02-03 | Well Log Performed |
2018-02-05 | Intermediate Casing Operation Performed |
2018-02-05 | Production Casing Operation Performed |
2018-02-10 | Finished Drilling |
2018-02-10 | Well Log Performed |
2018-02-10 | Well Mode changed to Drilled and Cased |
2018-02-11 | Rig Released |
2018-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-02 | Well Fluid changed to Gas |
2018-03-02 | Well Mode changed to Testing |
2018-03-06 | Well Fluid changed to Gas |
2018-03-06 | Well Mode changed to Test Completed |
2018-04-06 | Well Began Production |
2018-04-06 | Well Fluid changed to Gas |
2018-04-06 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-29 | Horizon Drilling Inc. | 47 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-02 | 2171.20 | Deviate (5 - 79 degrees) |
2018-02-03 | 2635.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-27 | Multi-Stage Fracture | 2552.60 | 2554.50 | 0 |
2018-02-27 | Multi-Stage Fracture | 3223.10 | 3225.00 | 0 |
2018-02-27 | Multi-Stage Fracture | 3282.10 | 3284.00 | 0 |
2018-02-27 | Multi-Stage Fracture | 3343.40 | 3345.30 | 0 |
2018-02-27 | Multi-Stage Fracture | 3405.60 | 3407.50 | 0 |
2018-02-27 | Multi-Stage Fracture | 3467.40 | 3469.40 | 0 |
2018-02-27 | Multi-Stage Fracture | 3528.70 | 3530.60 | 0 |
2018-02-27 | Multi-Stage Fracture | 3591.00 | 3592.90 | 0 |
2018-02-27 | Multi-Stage Fracture | 3654.00 | 3655.30 | 0 |
2018-02-27 | Multi-Stage Fracture | 3715.90 | 3717.80 | 0 |
2018-02-27 | Multi-Stage Fracture | 3777.70 | 3779.50 | 0 |
2018-02-27 | Multi-Stage Fracture | 2666.20 | 2668.10 | 0 |
2018-02-27 | Multi-Stage Fracture | 3839.00 | 3840.90 | 0 |
2018-02-27 | Multi-Stage Fracture | 2728.60 | 2730.50 | 0 |
2018-02-27 | Multi-Stage Fracture | 2790.20 | 2792.10 | 0 |
2018-02-27 | Multi-Stage Fracture | 2914.10 | 2916.00 | 0 |
2018-02-27 | Multi-Stage Fracture | 2974.90 | 2976.80 | 0 |
2018-02-27 | Multi-Stage Fracture | 3036.60 | 3038.60 | 0 |
2018-02-27 | Multi-Stage Fracture | 3098.40 | 3100.30 | 0 |
2018-02-27 | Multi-Stage Fracture | 3160.60 | 3162.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-27 | 2018-02-27 | 2,533 | 3,713 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 85.8596 | N/A | |||
20/40 SiberProp | Calfrac | Quartz | 14808-60-7 | 100 | 2.2315 | N/A | ||
30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.9321 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.5061 | N/A | ||
50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.5333 | N/A | ||
15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.3101 | N/A | |
Water | 7732-18-5 | 100 | 0.3101 | N/A | ||||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0203 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0203 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0203 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0203 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0203 | N/A | ||||
DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0203 | N/A | |
Water | 7732-18-5 | 100 | 0.0203 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0779 | N/A | |
CI-9100G | Calfrac | Corrosion Inhibitor | Alcohols. C12-15. ethoxylated | 68131-39-5 | 100 | 0.0009 | N/A | |
Cinnamaldehyde | 104-55-2 | 100 | 0.0009 | N/A | ||||
Dipropylene glycol monomethyl ether | 34590-94-8 | 100 | 0.0009 | N/A | ||||
Ethylene Glycol | 107-21-1 | 100 | 0.0009 | N/A | ||||
Formic acid | 64-18-6 | 100 | 0.0009 | N/A | ||||
Isopropyl alcohol | 67-63-0 | 100 | 0.0009 | N/A | ||||
Tar bases. quinoline derivs. | 68513-87-1 | 100 | 0.0009 | N/A | ||||
Tar bases. quinolone derivs.. benzyl chloride-quarternized | 72480-70-7 | 100 | 0.0009 | N/A | ||||
DWP-959 | Calfrac | Demulsifier | Methanol | 67-56-1 | 100 | 0.0803 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0803 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.3266 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-18 | 2018-02-20 | Surface Water - Runoff | 4076 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5161 | 0.0 | 0.0 | 0.0 |
2019 | 8316 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-11 | No Incident Encountered | 0.00 | 0.00 |
2018-02-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]