X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335032708000

Well Details

Well ID: 0335032708000
Loading map...
Location: 00/08-27-033-03W5/0
Location Alias: 00/08-27-33-03 W5M
Location Alias 2: 00/08-27-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 27
County/Municipality: Mountain View County
Well Name: CLEARVIEW GARR 8-27-33-3
Operator Name: Clearview Resources Ltd.
License Number: 0434308
License Date: 2011-06-14
License Status: Amended
Spud Date: 2011-07-27
Final Drill Date: 2011-08-13
Well Total Depth: 3426.00 m
Surface Hole Latitude: 51.862013
Surface Hole Longitude: -114.358306

For data sources see[1][2]

Well History

Date Event
2011-06-14 Obtained License
2011-07-30 Surface Casing Operation Performed
2011-07-31 Well Log Performed
2011-08-04 Direction Drilling Operation Performed - Horizontal
2011-08-08 Intermediate Casing Operation Performed
2011-08-08 Well Log Performed
2011-08-09 Well Log Performed
2011-08-13 Finished Drilling
2011-08-13 Well Mode changed to Drilled and Cased
2011-08-17 Liner Casing Operation Performed
2011-08-17 Rig Released
2011-08-22 Perforation Treatment Performed - Open-Hole Completion
2011-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-29 Well Began Production
2011-08-29 Well Fluid changed to Crude Oil
2011-08-29 Well Mode changed to Pumping
2011-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2020-03-31 Well Fluid changed to Crude Oil
2020-03-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-04 1548.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-22 Open Hole/Barefoot Completion 3420.00 3426.00 0
2011-08-29 Multi-Stage Fracture 2849.40 2849.50 0
2011-08-29 Multi-Stage Fracture 2789.10 2789.20 0
2011-08-29 Multi-Stage Fracture 2715.10 2715.20 0
2011-08-29 Multi-Stage Fracture 2654.80 2654.90 0
2011-08-30 Multi-Stage Fracture 2594.40 2594.50 0
2011-08-30 Multi-Stage Fracture 2519.70 2519.80 0
2011-08-30 Multi-Stage Fracture 2459.30 2459.40 0
2011-08-30 Multi-Stage Fracture 2386.80 2386.90 0
2011-08-30 Multi-Stage Fracture 2326.80 2326.90 0
2011-08-30 Multi-Stage Fracture 2252.90 2253.00 0
2011-08-27 Multi-Stage Fracture 3380.20 3380.30 0
2011-08-30 Multi-Stage Fracture 2192.10 2192.20 0
2011-08-30 Multi-Stage Fracture 2132.60 2132.70 0
2011-08-27 Multi-Stage Fracture 3319.10 3319.20 0
2011-08-27 Multi-Stage Fracture 3260.40 3260.50 0
2011-08-27 Multi-Stage Fracture 3188.60 3188.70 0
2011-08-27 Multi-Stage Fracture 3116.50 3116.60 0
2011-08-27 Multi-Stage Fracture 3043.30 3043.40 0
2011-08-27 Multi-Stage Fracture 2983.70 2983.80 0
2011-08-29 Multi-Stage Fracture 2923.40 2923.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2009 0.0 0.0 0.0
2012 8518 0.0 0.0 0.0
2013 8567 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8231 0.0 0.0 0.0
2016 7811 0.0 0.0 0.0
2017 6646 0.0 0.0 0.0
2018 5493 0.0 0.0 0.0
2019 8604 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

References